Search Documents

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • AUSIMM
    Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for Safety

    By G Baiden

    The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them

    May 9, 2016

  • SAIMM
    DOHEMS®?technology to improve risk assessments and early detection - Synopsis

    By C. J. Badenhorst

    The scope of this project was to research, develop and eventually produce a personal occupational hygiene and safety exposure monitor system to assist in recording and analysing various stress factors

    Jan 1, 2010

  • AIME
    Some Important Factors Controlling the Crystal Macrostructure of Copper Wire Bars

    By L. H. DeWald

    During the examination of various commercial brands of copper wire bars, which had exhibited different degrees of adaptability for being drawn into fine gages of wire by the present-day high speed mac

    Jan 1, 1931

  • SME
    Conditions For Making Direct Reduced Iron, Transition Direct Reduced Iron And Pig Iron Nuggets In A Laboratory Furnace - Temperature-Time Transformations

    By B. Anameric

    The pig iron nugget process is gaining in importance as an alternative to the traditional blast furnace. Throughout the process, self-reducing?fluxing dried greenballs composed of iron ore concentrate

    Jan 1, 2007

  • TMS
    Thermodynamic Modeling of KIVCET Lead Process

    By Pengfu Tan

    A thermodynamic model of KIVCET lead smelting process has been developed. The model has the capability to predict the distribution behaviors of Pb, Zn, Fe, S, O, As, and heat balance in KIVCET direct

    Jan 1, 2006

  • DFI
    Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles

    By Mike Muchard

    Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an

    Jan 1, 2000

  • SME
    Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo

    Jan 1, 2008

  • ISEE
    What a Gas: Blasting Under Pressure

    By Jerry Wallace

    This project consisted of blasting for expansion of a major interstate natural gas transmission pipeline pump station. The pump station handled 400-500 million cubic feet (1 l- 14 million cubic meter

    Jan 1, 1996

  • AUSIMM
    Minimization of Contamination of Mined Ore by Cemented Hydraulic Fill

    A review is made of the limited published experience of the effects of cemented fill in flotation.A general approach is adopted in listing and discussing possible sources of, and reasons for, ore cont

    Jan 1, 1974

  • SAIMM
    Strategic and tactical requirements of a mining long-term plan

    By B. J. Kloppers, J. V. Z. Visser, C. J. Horn

    "The long-term plan (LTP) in a mineral resource company is defined by the quality of the mineral resource and represents the result of a series of trade-offs to fulfil internal organizational as well

    Jan 1, 2015

  • NIOSH
    Nonmetal Operator Mining Facts – 2004

    In 2004, a total of 741 nonmetal mining operations reported employment to the Mine Safety and Health Administration (MSHA). These mines (e.g., potash, gypsum, salt) comprised 5.1% of all operations.

    Sep 1, 2007

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • AUSIMM
    Isotopic Dating of the Leucocratic Granite, Rum Jungle, Australia

    By Ruxton B. P, Rhodes J. M

    Two Rb-Sr ages are discernible in data concerning the leucocratic granite which is the youngest pre-sedimentation phase of the crystalline basement complex at Rum Jungle, Northern Territory, Australia

    Jan 1, 1977

  • SME
    Evaluation of a Virtual Reality Simulator Developed for Training New Miners to Install Rock Bolts Using a Jackleg Drill

    By D. Nutakor

    The ability of computers to create synthetic representations of the real world in virtual reality offers a number of opportunities to enhance training methods used in the mining industry. Unfortunatel

    Jan 1, 2008

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • DFI
    A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New Mexico

    By SungJe Chi

    Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi

    Jan 1, 2017

  • AUSIMM
    Metal and Sulphur Recovery from the Copper Sulphide Precipitate in the Sherritt Gordon Process

    By Parker A. J, Ruane M, Wadley L. G B

    Copper, sulphur, nickel, cobalt, palladium, silver, and gold can be recovered from the copper sulphide precipitated from the "copper boil" of the Sherritt-Gordon nickel process used at Weste

    Jan 1, 1978

  • SME-ICGCM
    A Study of Roof Caving in the Eastern U.S. Coalfields

    Appropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed

    Jan 1, 1986