Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Early Warning of Longwall Weighting Events and Roof Cavities Using Lva Software

    By David I. Hoyer

    It is shown that by monitoring longwall leg pressures in real time, warning can be given for significant weighting events and the formation of roof instabilities, such as roof cavities, several hours

    Jan 1, 2011

  • SME-ICGCM
    Design And Planning Of Lower Seam Longwall Gateroads

    Case study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be

    Jan 1, 1995

  • SME-ICGCM
    Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock Bolts

    By Clare Offner

    In 1998, the Australian Coal Association Research Program (ACARP) awarded funding to the School of Mining Engineering at the University of New South Wales to establish a rockbolt testing facility to r

    Jan 1, 2000

  • SME-ICGCM
    Rockbolted Support of Retreat Longwall Gateroads at 1000m Depth: A Case History

    By Karl Brandt

    Longwall panel 580 has recently been retreated in the Zollverein 1/2 seam at a depth of approximately 1000m at Auguste Victoria mine with rectangular rockbolted roadways used for both the maingate and

    Jan 1, 2002

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    A Study of Potential Fault Reactivation and Water Intrusion at a Longwall Coal Mine in Appalachia

    By Francis Kendorski

    A longwall coal mine in Appalachia about 1,500 ft deep encountered a fault while developing a new longwall panel. The fault extended from mining depth to the surface near a secondary road and drainage

    Jan 1, 2003

  • SME-ICGCM
    Shear Bond Stresses Along Cable Bolts

    By Hani S. Mitri

    The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio

    Jan 1, 1990

  • SME-ICGCM
    Extended Cut Out Distances In Continuous Miner Sections In South African Collieries

    By Ismet Canbulat

    The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and

    Jan 1, 2000

  • SME-ICGCM
    Use Of Polymer Grids For Longwall Shield Recovery

    By Brian E. Travis

    The recent development of polymer grids for the underground coal mining industry has created new alternatives for supplemental ground control practices. The grids utilize strong, lightweight polymers

    Jan 1, 1990

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998

  • SME-ICGCM
    Study On The High-Pressure Grouting Of The Overburden For Subsidence Control

    By W. J. Guo

    Overburden movement as a result of longwall mining can be classified into, in ascending order, caving zone, fractured zone, and bending zone. Operation experience and laboratory research have demonstr

    Jan 1, 1994

  • SME-ICGCM
    Influences of Longwall Subsidence on a Guyed Steel Tower - A Case Study

    By Yi Luo

    The potential influences of mining subsidence on structural stability, integrity and functionality of guyed tower structures have not been systematically studied before. This paper presents a ease stu

    Jan 1, 2003

  • SME-ICGCM
    Subsidence Prediction Influence Assessment and Damage Control

    By Y. Luo

    An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t

    Jan 1, 1997

  • SME-ICGCM
    AMCMRR- An Analytical Model for Coal Mine Roof Reinforcement

    By Mark G. Colwell, Russell Frith

    "An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p

    Jan 1, 2010

  • SME-ICGCM
    Scale Model Studies To Investigate The Effects Of Various Stressfields On The Stability Of Pillars Between Mine Roadways (359d84ec-978c-4bf2-a810-72bdf384bacc)

    By K. Goshtasbi Goharizi

    This paper discusses experimental results of physical scale models employed to study the stability of a pillar between rectangular roadways. A programme of laboratory investigations utilising a bi-axi

    Jan 1, 1992

  • SME-ICGCM
    Design Considerations of the Secondary Roof Support for Longwall Tailgate Entries

    By Jinsheng Chen

    To maintain the stability of longwall tailgate entries, they have to be supported by not only the primary roof support but also the secondary roof support due to the impact of the longwall mining¬indu

    Jan 1, 2003

  • SME-ICGCM
    The Effects of Longwall Coal Mining on the Hydrogeology of Southwestern Pennsylvania

    By Megan N. Witkowski

    The purpose of this study is to investigate the susceptibility characteristics of domestic and agricultural water supplies that may be vulnerable to diminution or total loss of supply when active long

    Jan 1, 2011

  • SME-ICGCM
    Microcirculation Theory Analysis Of Spontaneous Combustion Of Loosing Coal In The Top-Coal Caving Region Of Entry

    By Q. F. Wang

    Spontaneous combustion hazard of loose coal in the top-coal caving region of entry affects the safety of the entry and top- caving longwall face seriously. In this paper, by combining on- site tempera

    Jan 1, 2004

  • SME-ICGCM
    Improvement in Pre-Tensioning of Strand Bolts in Australian Coal Mines

    By Mietek Rataj

    Installation of pre-tensioned Strand Bolts i.e. resin grouted cable bolts is very common now in Australian coal mines. A short historical development of this type of rock reinforcement is outlined Var

    Jan 1, 2002

  • SME-ICGCM
    Stone Mine Design in Highly Fractured Rock (af82e9d2-530a-42f2-9d22-f8c466af0da2)

    By Vincent Scovazzo

    Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u

    Jan 1, 2002