    Weak Floor Stability During Perimeter Mining In The Illinois Basin Coal Mines (40fab914-2257-4efe-b587-9358b9303f41)

    By Murali M. Gadde

    Perimeter mining is a special form of very productive partial extraction method practiced at some mines in the United States. In the Illinois Basin mines where all major coal seams have weak underclay

    Jan 1, 2009

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    High Horizontal Movements In Longwall Gate Roads Controlled By Cable Support Systems

    By Dennis R. Dolinar

    Controlling coal mine roofs subjected to high-horizontal stress conditions has always been difficult and uncertain. Traditional supports such as wooden cribs and posts, concrete donut cribs, and stand

    Jan 1, 1996

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems

    By Andrew P. Jarosz

    The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are

    Jan 1, 1995

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • SME-ICGCM
    Regularities Of Rock Pressure Manifestations In Longwalls In Terms Of The Theory Of Plates And Limit Equilibrium

    By V. M. Shick

    With gentle bedding within the zone of support pressure the delamination in roof rocks may occur only on those stratification planes where cohesiveness of rock is close to zero. Unlike this, at dip an

    Jan 1, 1996

  • SME-ICGCM
    Stability Mapping To Examine Ground Failure Risk: A Field Study At A Limestone Mine (b0d73e07-1fdd-41b0-ab9e-b3e15e89a17e)

    As the surface reserves are being depleted, more and more stone operators are seeking underground mining options. Stability of underground openings is a major concern for the safety and productivity.

    Jan 1, 2009

  • SME-ICGCM
    Guidelines for the Management of Rock Related Instability in Strip Mines, AngloCoal, South Africa

    By Trevor Rangasamy

    Technically based guidelines for managing rock related risks associated with strip mines in South African collieries are currently vague and are to a large extent based on experience and trial and err

    Jan 1, 2008

  • SME-ICGCM
    Improving Design Methodology For Innovative Rock Mechanics Design

    By Dwayne C. Kicker

    This paper introduces the concept of design theory and methodology as applied to rock mechanics for more innovative and efficient design. This is a "frontier" research area in rock mechanics because a

    Jan 1, 1989

  • SME-ICGCM
    Using Ground Penetrating Radar For Roof Hazard Detection In Underground Mines

    By G. M. Molinda

    Ground Penetrating Radar (GPR) is being investigated for the potential to determine roof hazards in underground mines. GPR surveys were conducted at four field sites with accompanying ground truth in

    Jan 1, 1996

  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    In-Seam Seismic Tomography Mapping Application To Coal Mining Problems

    Continuing with the effort of providing new and more effective exploration methods to the mining industry, where direct methods (drilling, cross-cutting, etc.) are not applicable, either for logistica

    Jan 1, 1996

  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME-ICGCM
    A Study of Roof Caving in the Eastern U.S. Coalfields

    Appropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed

    Jan 1, 1986

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • SME-ICGCM
    Letter Of Nomination - 26th International Conference on Ground Control in Mining

    By Christopher Mark

    Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl

    Jan 1, 2007