Design And Operation Of Two Stage Rod-Pebble And Autogenous-Pebble Grinding Circuits At Boliden?s Aitik Plant ? 1. GeneralBy Per H. Fahlstrom
The story of the Aitik mine begins in the early thirties. At that time blocks of low grade chalcopyrite impregnations were found in Swedish Lapland not far from the present mine, some 40 miles north o
Jan 1, 1974
-
Measurement Techniques For The Characterization Of The Flotation Performance Of A Complex Sulphide OreBy D J. Bradshaw
It is well known that the chemical environment determines the success of the flotation process, however its characterization and control is difficult to achieve. This work evaluates the use of various
Jan 1, 1999
-
Microbial And Substrate Characterization of Four BLM Biochemical Reactor Systems In The Coeur D?Alene, Idaho AreaBy R. M. Hernandez
The Bureau of Land Management (BLM) constructed four passive biochemical reactor systems (BCRs) to treat mining influenced water (MIW) in the Bunker Hill Superfund area near Coeur D?Alene, Idaho betwe
Jan 1, 2010
-
A New Method To Float Selectively Cassiterite With Halogen IONSBy German Zambrana
The solution of the problem of beneficiation of cassiterite from its primary ore deposits is of fundamental importance to Bolivia. The process today involves a gravimetric treatment of the ore followe
Jan 1, 1971
-
Safety With Continuous Miners And Other Mechanized Equipment In Pitching Coal Beds - Summary And IntroductionBy L. H. McGuire
Many coal beds in the State of Washington, pitching as much as 90°, offer unusual mining conditions. This paper describes methods and safe practices of mechanized mining in pitching bituminous-coal be
Jan 1, 1959
-
Modelling Of The Flotation Kinetics Of A Polymetallic Sulfide OreBy H. Vedrine
A modelling study has been carried out on the flotation of the Moinho (Portugal) polymetallic sulphide ore, based on pilot plant data. It shows that successfully modelling the flotation of such an or
Jan 1, 1991
-
Amax's Sleeper mine exceeds expectations on all counts as low-cost gold producerBy Warren D. Stanford Stanford
Introduction The Sleeper mine is a near-surface gold mine located in a remote area 56 km (35 air miles) northwest of Winnemucca, NV (Fig. 1). The deposit was discovered in 1984 by an Amax exploration
Jan 4, 1987
-
The Stability Impacts Of Backfilling Flue Gas Desulferization By-Products Into Highwall Mine AditsBy R. J. Sweigard
One possible alternative for disposal of flue gas desulfurization (FGD) by-products is use as backfilling support material in highwall mine adits. The finite element method was used to analyze the var
Jan 1, 1996
-
Geologic Structural Analysis For Open Pit Slope Design, Kimbley Pit, Ely, NevadaBy Perry N. Halstead
The primary objective of the structural geology portion of the Kennecott Copper Corporation-U. S. Bureau of Mines Pit Slope Stability Study was to determine the attitude, geometry, and spatial distrib
Jan 1, 1968
-
Charge Motion In A Semi-Autogenous-Grinding MillBy Z. Rogovin
In order to develop more accurate procedures for scale-up and design of semi-autogenous-grinding mills through detailed mathematical models, a better understanding of the charge motion and rock/ball s
Jan 1, 1985
-
A New Method For Designing Support Area To Protect Surface Structures Over Underground Coal Mining AreasBy S. S. Peng
A well designed mining plan is one which minimizes the cost and the mining induced problems and maximizes the recovery of the coal reserve. In order to minimize the negative effects on surface structu
Jan 1, 1993
-
By-Product Molybdenite Recovery In Chile Chemical Factors In The Selective Flotation Of MolybdeniteBy H. S. Castro
The by-product molybdenite technology in Chile is reviewed. Flowsheets, reagents and some operation features for the actual six Chilean moly plants(Chuquicamata, El Teniente, El Salvador, Andina, Las
Jan 1, 1998
-
An Empirical Model Of Capture In A High Gradient Magnetic Separator And Its Use In Performance PredictionBy G. S. Dobby
High-intensity wet magnetic separators have been successfully introduced into the mineral processing field over the past ten to fifteen years, due largely to rapid advancements in magnet design. Wet m
Jan 1, 1977
-
A Method For Alunite BeneficiationBy J. Y. Hwang
Alunite has been utilized as raw materials for producing alumina and potassium sulfate fertilizer in Russia for many years. In the United States, this mineral has not been commercially processed thoug
Jan 1, 1985
-
Large Scale Three-Dimensional Numerical Simulation Of Longwall Mining (18198590-4f49-4754-8601-8cd851f32622)By V. Gall
The three-dimensional finite element technique combined with the progressive failure approach was utilized to simulate stress distributions in a mine section which occur in response to a longwall mini
Jan 1, 1990
-
A Plan For Mining Nahcolite In The Piceance Basin, Colorado (AIME)By V. Rajaram
The Parachute Creek Member of the Green River Formation in the Piceance Basin, Colorado, contains vast reserves of oil shale, nahcolite, dawsonite, and other accessory minerals. The dry alkali process
Jan 1, 1977
-
A New Tool In Financial Decision-Making Under UncertaintyBy R. K. Singhal
This new tool can be used for the proper assessment of the potential economic wealth of any risky capital project. It does provide an unambiguous recommendation of the type "go or no go" to the deci
Jan 1, 1993
-
Interaction Of Corrosion And Abrasion In Grinding Media WearBy R. Perez
The consumption of grinding media forms a significant part of the operating cost of a mineral processing plant. An estimated half billion pounds of steel in the USA and over one billion pounds in the
Jan 1, 1984
-
Cave Initiation And Growth Monitoring At The Henderson MineThe initiation of a panel cave is an extremely important and infrequent event in the life of a large underground caving operation. A new cave was initiated at the Henderson Mine in 1991, 15 years afte
Jan 1, 1994
-
Effect Of Bit Wear On Productivity Of Continuous Miners PRIPRINT 93-238By A. W. Khair
This paper presents an analysis of the dynamics of bit wear on the productivity of the continuous miners. Two field surveys have been carried out. The first survey was to assess the impact of bit wear