Comparing the Air Quality inside Enclosed Cabs of Underground Mining Equipment with MERV 16aAnd HEPA FiltersBy J. Noll, J. A. Organiscak, A. B. Cecala
"In recent years, significant strides have been made to optimize the design of filtration and pressurization systems used on enclosed cabs of mobile mining equipment to reduce respirable dust and othe
Jan 1, 2016
-
The Design and Use of Grout Pillars for the Purpose of Holing Longwalls into Pre-driven RoadwaysBy Rob Thomas
It is generally agreed that standing support should be installed in roadways that will for various reasons, be holed through with a longwall. Considering the magnitude of the associated abutment loadi
-
Longwall Mining - The Tools For The JobBy R. H. Thorpe
In the earliest days of mining coal the obvious method was by bord and pillar working. Longwall in Britain developed from this as an expedient to overcome bottlenecks arising from ? 1) increasing
Jan 1, 1976
-
A Geologic Study Of Gravels Of The Agua Fria River, Phoenix, AZBy W. H. Langer
Quaternary alluvial deposits in the modern stream channel of the Agua Fria River west of Phoenix, Arizona, is mined and processed to provide aggregate to the greater Phoenix area. The alluvium occurs
Jan 1, 2010
-
An Investigation Of Alternative Sag Mill Recycle Treatment OptionsBy J. L. Vanderbeek
Investigations have been conducted at Chino Mines Company into the effect that SAG mill recycle material (critical size) exerts on SAG mill throughput and specific energy requirements. Tests were cond
Jan 1, 1985
-
Nonlinear Finite Element Analysis Of Open-Pit Slopes In Incompetent RockBy Paul R. Weber
Open-pit mines are constructed in materials characterized by the complete range of geologic materials from the most recent alluvial sediments to hard intact crystalline rock. The determination of stab
Jan 1, 1971
-
Diagnostic Analysis Of Gold Associations For Several Mixed Sulphide And Carbonaceous OresBy G. A. Hayes
The range of gold ores tested at AMMTEC LTD over several years has resulted in the requirement to analyse for the mode of occurrence of gold in order to assist selection of ore processing options. The
Jan 1, 1996
-
Gravity Circuit Improvements At The Montana Tunnels MineBy B. T. Darnton
Gravity concentration at the Pegasus Gold Montana Tunnels Mine was initiated in late June, 1991 with the commissioning of a coarse gold scalping circuit that processes a small portion of the ball mill
Jan 1, 1995
-
Mineral Wool Production From Coal-Ash - A Progress ReportBy William F. Lawrence
Research performed by the West Virginia University Coal Research Bureau under the sponsorship of the U. S. Bureau of Mines has demonstrated that coal-ash can be converted into mineral wool insulation
Jan 1, 1969
-
Hectorite Deposits In The McDermitt Caldera Of Nevada (27e16b6c-6f89-41c3-9773-07f73822e55a)By I. E. Odom
The rare magnesium-lithium clay mineral hectorite occurs at many places in the McDermitt caldera of Nevada-Oregon. Commercial development of several high purity deposits began in 1986. The hectorite
Jan 1, 1992
-
Hydraulic Assessment and Rehabilitation of a Deep Stormwater TunnelBy Brandon Barnes, Michael Haggerty
"Around Minneapolis and Saint Paul, Minnesota, the local geology includes the St. Peter Sandstone, which is easily minable and has facilitated construction of interceptor tunnels for storm water and s
Jan 1, 2016
-
Extraction of copper from chalcopyrite concentrates without sulfuric acid generation via chlorination Part 3: Integration of gaseous chlorination and selective oxidationBy T. Tamagawa, I. Iwasaki, N. X. Fu, M. Kobayashi
A three-stage fluidizing-bed process consisting of chlorination, selective oxidation and sulfur chloride conversion was tested for processing chalcopyrite concentrate. It was found that the use of exc
Jan 1, 2002
-
Geologic And Allied Considerations In Ore Reserve Estimates For Vein Type Deposits ? IntroductionBy O. H. Rostad
The importance of geology in ore reserve estimation has been stated by several authors. King et, a1 (1982) reported that the geological factor was the key deficiency where serious weaknesses in ore re
Jan 1, 1985
-
New Method for Sulfate Removal and RecoveryBy P. James
"INTRODUCTION High sulfate (SO4-2) levels often occur in MIW (mining influenced water) either as the result of oxidation of sulfide minerals exposed by mining activity or by deliberate addition – comm
Jan 1, 2015
-
Tritium And RadiationBy Martin C. Kuhn
The use of tritium in manufacturing and its subsequent loss to the local environment in Tucson, Arizona resulted in a great debate relative to the physiological effects of low level radiation. This pa
Jan 1, 1981
-
Selective Rock Fracture Induced by BlastingBy E. O. Jacobs
A coupled solid and rock fracture mechanics model is used to analyze the blast driven fracture propagation phase, predict propagation rates, and directly measure shockwave and particle velocity. The
Feb 23, 2014
-
Characteristics of the Clay-based GroutsBy Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams
4.1 THE GENERAL COMPOSITION AND PROPERTIES OF CLAY-BASED GROUTS Clay-based grouts are visco-plastic systems; they are made by adding structure-forming reagents to a clay mineral mortar. Small amounts
Jan 1, 1993
-
Characterization and Removal of Iron from Pyrophyllite Ore for Industrial ApplicationsBy S. K. Jena, S. Singh, B. Das, N. Dhawan, P. K. Misra, D. S. Rao
"Iron as an impurity in pyrophyllite ore affects pottery, ceramics and tile quality. We carried out the characterization of a pyrophyllite ore sample using optical microscopy, scanning electron micros
Jan 1, 2015
-
A Dynamic Programming Algorithm for Selecting Evenly Spaced Pushbacks from Nested PitsBy Kadri Dağdelen, Matthew Deutsch, Thys Johnson
Nested pit analysis in open-pit long range mine planning is used to define approximate ultimate pit limits and an initial high-level schedule in the early stages of a project. Modern ultimate pit opti
Jun 25, 2023
-
The Critical Pillar Concept In Yield Pillar-Based Longwall Gate Road DesignBy J. R. Koehler
Yield pillar-based gate road designs oftentimes fail to provide mine operators with adequate ground control because of the unknowing misemployment of "critically" sized pillars. A "critical" pillar is
Jan 1, 1995