Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Interactions Between Anionic Collector And Alizarin Modifier In Dolomite/Francolite Flotation SystemBy L. Xiao
Using K-oleate as a collector and alizarin red S (ARS) as a modifying agent, selective depression of dolomite from francolite was achieved in alkaline medium (pH> 9.0). Interestingly. ARS was also fou
Jan 1, 1988
-
Soft Ground NATM Tunnel DesignsBy Mohammad Irshad, Larry H. Heflin
INTRODUCTION The planned 166 kilometer (103 mile) Metro rapid rail transit system in Washington, D.C. is being designed and constructed by the Washington Metropolitan Area Transit Authority. At the
Jan 1, 1987
-
Utility of Mass-Balanced EH-pH Diagrams II: Stoichiometry of Cu-As-S-H2O System (bd7284b8-7fb9-4367-afdc-4788bfdb0889)By H. Huang, R. N. Gow
"In Part I, Gibbs’ phase rule was applied to mass-balanced EH-pH diagrams for the Cu-As-S-H2O system. The diagrams were generated using the stoichiometry of enargite as a basis. In this study, the cal
Jan 1, 2016
-
Anthracite Preparation ? Past and PresentBy James W. Echerd
Anthracite preparation developments, particularly in the early days of the anthracite industry, formed the basis for the modern coal preparation plants that have become so essential to the coal indust
Jan 1, 1971
-
Hydraulic MiningBy James L. Evers
The development of hydraulic mining in the United States has had an uneven record of progress. The shifting of coal extraction from one government agency to another has not provided an environment for
Jan 1, 1983
-
Computer Use In The Mining IndustryBy B. L. Gibbs
The mining industry is constantly in a state of flux -boom or bust; mine openings and closings. Part of the reason is the nature of ore deposits -they are there or they are not. Once they are mined, t
Jan 1, 1993
-
Waneta expansion project: Penstock tunnelsBy Ben Roderds
The Waneta Expansion Project (WAX) is located near the existing Waneta Dam site at the confluence of the Pend d?Oreille and Columbia rivers, approximately 10 km (6.2 miles) south of Trail, BC, Canada.
Mar 1, 2014
-
Cathodic Protection To Minimize Corrosive Wear In Ball MillsBy G. T. Adel, P. E. Richardson, R. Pazhianur
Cathodic protection using impressed current was employed to reduce mill wall wear during ball milling. Wear rates were determined from weight-loss measurements made on four 1-in.-diam mild steel coupo
Jan 1, 1998
-
Mine Design of an Underground Fluorspar Mine inBy Franziska Wolf, Rainer Ellmies, Helmut Mischo
"Mining is an important part of the economy of Namibia. In 2016, 11.1 percent of the GDP was the result of mining activities with 22 active mines (The Chamber of Mines of Namibia, 2016). Only one of t
Jan 2, 2018
-
High-Pressure Roll Mill Comminution Of Heterogeneous Multicomponent FeedsBy Oliver Gutsche
High-pressure roll mill comminution of heterogeneous multicomponent feeds was simulated with artificial limestone-quartzite mixtures using a piston-die press. The influence of heterogeneous interactio
Jan 1, 1995
-
Cyanide Removal From WAD Cyanides; A Study Of The Zinc - Silver – Cyanide – Activated Carbon System.By G. Van Weert, J. F. Breedveld
Both regular and Silver Impregnated Activated Carbon (SIAC) were studied for their effectiveness in removing WAD (Weak Acid Dissociated) cyanides from solutions at pH = 10. SIAC has already been shown
Jan 1, 2004
-
Pressure And Temperature Corrections For Coal Desorption MeasurementsBy Lloyd M. English
Accurate knowledge of the gas content of coal seams has always been important, according to the work of W. P. Diamond and J. R. Levine, 1981, but is becoming increasingly important for several reasons
Jan 1, 1984
-
The Grand Isle Mine Freeport Sulphur Company's Offshore Venture ? IntroductionBy C. O. Lee
The Grand Isle Sulphur Mine is located in the Gulf of Mexico, approximately seven miles off the coast of Grand Isle, Jefferson Parish, Louisiana. The depth of water at this location is about 50 feet.
Jan 1, 1959
-
Room-and-pillar panel design method to avoid surface subsidence (baff531e-1217-4963-ad11-1cde90cbd566)By Y. Luo
Cuando se diseña y operan minas de carbón subterráneas con el método de cámaras y pilares, es siempre difícil obtener un buen equilibrio entre la prevención de subsidencia de la superficie y la obtenc
Jan 1, 2014
-
Room-and-pillar panel design method to avoid surface subsidenceBy Y. Luo
In designing and operating underground room-and-pillar coal mines, it is always difficult to achieve a good balance between preventing surface subsidence and achieving high recovery ratio. In this pap
Jan 1, 2014
-
Geostatistical Methods For The Estimation Of Minable Reserves In Stratiform Uranium Deposits (9e200d18-6131-4dd7-b224-0fbc6b7292bf)By M. G. Hester
The ore reserve modeling of stratiform uranium deposits to be mined by selective underground mining methods must be done with consideration of the erratic nature of the ore forming processes that prod
Jan 1, 1985
-
Effect Of A Material Flow Model In Prediction Of Particle Size Distributions In Open And Closed Circuit MillsBy Alan D. Randolph
A size-continuous breakage kinetics model is postulated and supported with industrial grinding mill data. It is shown that the kinetics parameters include the effects of possible classification at the
Jan 1, 1975
-
Analyzing Energy Costs In Open Pit MinesBy W. J. Kennedy
Energy management in industry has recently achieved notice as a way to reduce costs without decreasing production. The same approach used in industry can be used in mining, even though the processes a
Jan 1, 1982
-
Perceptive driving assistant system for opencast mines during foggy weatherBy Swades Kumar Chaulya, Vikash Kumar, Sushma Kumari, Naresh Kumar, Girendra Mohan Prasad, Monika Choudhary
Opencast mines are vulnerable to inclement weather conditions as it disrupts the day-to-day activities at these mines. To address the problem, a perceptive driving assistant system (PDAS) has been dev
Apr 1, 2023
-
OCR Packaged Coal-Fired Boilerplant ? General ConsiderationsBy M. Pope
By 1950, packaged oil and gas fired boilers were on the market for capacities up to 30,000 lbs./hr. By 1962, capacities were up to 100,000 lbs./hr. and even higher when separate heat traps (economizer
Jan 1, 1965