Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hydrologic evaluation of post-closure flooding and dewatering of the Homestake Mine
By Guosheng Zhan
The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under
Jan 4, 2010
-
Hydraulic Impacts Of Quarries And Pits: Critical Planning For Resource Development
Introduction Aggregate mining impacts on water resources are a source of concern to local governments. To evaluate those impacts, the Minnesota Department of Natural Resources conducted a four-year
Jan 1, 2007
-
Installation of a Ventilation Shaft at San Juan Coal
By T. Arthur Palm, Stephen L. Bessinger
San Juan Coal Co. (SJCC) operates an underground coal mine near Farmington, NM. Continuous miners and a longwall produce 6.3 to 7.2 Mt/a (7 million to 8 million stpy). SJCC is owned and operated by
Jan 1, 2007
-
Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero Emissions
By Tuncel M. Yegulalp, Anuta Belova
This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu
Jan 1, 2005
-
Application of Predictive Maintenance Techniques for Large Electric Mining Shovels – Preprint 97-205
By Michael Lenz
Predictive maintenance technologies including vibration analysis, tribology, infrared thermography, ultrasonic detection, and electrical measurements have been applied to large electric mining shovels
Feb 24, 1997
-
After 50 Years, SME Remains World’s Premier Professional Mining Association
By Steve Kral
The Society for Mining, Metallurgy and Exploration’s origins can be traced back to 1871. This was when 22 Pennsylvania coal mining engineers founded the American Institute of Mining Engineers (AIME).
Jan 1, 2007
-
Coal Quality And Resources In The Us Gulf Coastal Plain
By J. C. Willett, J. R. Sanfilipo, P. D. Warwick
The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen
Jan 1, 2001
-
New Approach Of ASFINAG For Tunnel Construction Monitoring Of The Tauern Tunnel Project In Austria
By Robert Schnab
ASFINAG is responsible for the construction and operation of the Austrian highway system. It is approx. 2,400 km of highways and 65 tunnels with a total length of 200 km including the Tauern Tunnel.
-
Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft
By Hemang Desai
A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig
-
Solvent Extraction Of Al(III) From Sulfate Solutions Using Bis (2,4,4-Trimethylpentyl) Phosphinic Acid - Mechanism And Complexation
By D. Mohapatra
Extraction of Al(III) from aqueous sulfuric acid solutions into organic Cyanex 272®-carbon tetrachloride systems was investigated from a multi-component mixture containing aluminum, cobalt and nickel.
Jan 1, 2008
-
A study of total dynamic analysis method for deepseabed integrated mining system
By Hyung-woo Kim, Sup Hong, Sung-Soo Kim, Chang-Ho Lee
A deep-seabed integrated mining system, which consists of four subsystems such as riser pipe, buffer, flexible riser, and tracked vehicles, is presented in Figure 1. In order to collect more manganese
Sep 1, 2014
-
Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide Ore
By H. K. Lin
The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic
Jan 1, 2008
-
Tekflex As A Spray-On Screen Replacement In An Underground Hard Rock Mine (fe0b3806-09e4-4f12-957e-fdb8d742c7f8)
By Michael Amick, G. Swan, R. Hill, C. Pritchard
Falconbridge, a major base metal producer in the Sudbury Basin of Ontario, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose ground during unde
Jan 1, 2000
-
Engineering Research At The United States Deep Underground Science And Engineering Laboratory, In The Footprint Of The Homestake Mine.
By A. Bobet
Design of a new underground laboratory is underway through the auspices of the United States National Science Foundation. The Deep Underground Science and Engineering Laboratory (DUSEL) is scoped to p
Jan 1, 2011
-
The Development Of An Energy Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, Alaska
By J. Hollow, D. Walsh
The Fort Knox Mine is located in Alaska’s interior, where the average ambient air temperatures range from -24oC in January to 16oC in July. The mill processes a free milling gold ore utilizing both a
Jan 1, 2007
-
Improved Selectivity Of Super-Conducting Dry HGMS Of Fine Powders By Vibration
By Y. Wang, E. Forssberg, A. Johansson, B. Chan
A super-conducting high gradient magnetic separator with matrix vibration in dry separation mode is a powder purification device, which has been used to remove weakly magnetic impure particles from fi
Jan 1, 2001
-
Lake Dorothy Hydroelectric Project Lake Tap And Tunnel, Juneau, AK
By Jason Morrison
The Norwegian Lake Tap Method was successfully used to tap into the side of Lake Dorothy 36.5 m (120') below the lake surface. The lake tap allows water to flowinto an access tunnel from the lake
-
Linear Behavior Of Rock Joints In Uniaxial Joint Compression Tests
By D. Nutakor
Rock joint stiffness is not only a poorly known parameter, but also has no established laboratory measurement procedure. This paper presents methods used to determine the normal and shear stiffnesses
Jan 1, 2008
-
Utilizing Mineralogy In Process Development For Hecla's Lakeshore Project ? Introduction
By Theodore S. Jordan
The discovery of a major porphyry-type copper deposit on the Papago Indian Reservation in Pinal County, Arizona was announced by El Paso Natural Gas Company in 1968. The deposit, known as the Lakeshor
Jan 1, 1985
-
Kansas River Tunnel Shaft Drilling
By Clay Haynes
While the Kansas River Tunnel is a relatively short, small diameter tunnel, the shaft excavation methods implemented were long and large on innovation and use of reverse circulation drilling equipment