Selection and Application of Cutoff Grades in Underground Mine Planning—Practical Application - SME Annual Meeting 2024By Paul Schmidt, John Barber
This paper discusses the determination of cutoff grade (COG), including all revenue and cost factors and how to apply the COG in the world of engineering studies and mine planning for underground mine
Feb 1, 2024
-
Engineering Risk Analysis Of Sand And Gravel OperationsBy Burton E. Gilpin, Dr. George W. Annadale
A two level risk analysis procedure which is specially designed for use in river environments, is presented. The first level risk assessment (Level I) is often adequate for purposes of most projects,
Jan 1, 1992
-
NPV or IRR? Why not both?By T. F. Torries
The primary criteria used by the mining industry to judge the merit of a project is internal rate of return (IRR) rather than net present value (NPV), although NPV is favored by academicians. This pap
Jan 1, 1999
-
MSHA’s Review Of Impoundment PlansBy H. L. Owens, J. W. Fredland, K. K. Wu
The Mine Safety and Health Administration (MSHA) is responsible for reviewing and approving the engineering plans for impoundments, of significant size or hazard potential, that are constructed on coa
Jan 1, 2003
-
Comparison of Primary Jaw and Gyratory CrushersBy N. L. Weiss
General The crushing of run-of-mine hard rock ores is the province of jaws and gyratory primary crushers described in the two preceding chapters of this section. While it is now seldom difficult to
Jan 1, 1985
-
The Study on the Micro-climate in a Mine Central Pump and Power StationBy Yiyin Ma, Yuqi Chen
Based on two in-situ measurements and mathematical analysis, the micro-climate in a large central underground pump and power station has been discussed in this paper. It is found from the research tha
Jan 1, 1991
-
Conditional Simulation As A Tool For Mine Planning: A Case StudyBy Armando Z. Remacre
The purpose of this paper is to attest the effectiveness of conditional simulation technique's for determining the principal pre-mining control parameters during mine planning. These parameters i
Jan 1, 1992
-
Rock index properties for geoengineering in underground developmentBy J. E. Rourke, O&apos
This paper describes the use of index testing to obtain rock properties that are useful in the design and construction planning of an underground development for civil engineering or mining projects.
Jan 1, 1990
-
Open Session-General DiscussionJIM ARNOLD: Questions? Comments? Gary, were you gone when I made the comments about corporate puke? [laughter] SPEAKER: You were hiding. BRUCE CAVENDER, BHP Copper: Having worked in both places
Jan 1, 1998
-
Modelling of Spontaneous Heating in a Longwall GoafBy J. N. Carras, N. W. Bainbridge
In order to further the understanding of spontaneous heating of longwall goafs a numerical model was developed, based on conservation principles applied to the transport of heat, water vapour and oxyg
Jan 1, 1995
-
Prediction And Control Of Dust In Indian Opencast Coal Mines And Their Surrounding AreasBy S. P. Banerjee
There has been a phenomenal increase in production of coal from opencast mines in India. At the same time environmental problems caused by mining are receiving greater atttention. Deterioration in amb
Jan 1, 1991
-
Is Control of Fine Coal Circuits Necessary?By Randhir Sehgal
If the primary purpose of a control system is to assure a fixed-quality product at maximum yield, the real issue involved in control of the fine coal cleaning circuit in a plant is to demonstrate that
Jan 1, 1988
-
What is the Future of Coal?By Diane Moody
I have been asked to give you the National Coal Association's (NCA) view of the future of the coal industry. However, before discussing the outlook for the future I would like to set the stage by
Jan 1, 1988
-
Improving Fire Detection In Underground Coal MinesBy Charles D. Litton
Introduction The successful performance of a mine-wide fire detection system depends upon its ability to detect the presence of a fire rapidly and reliably. It should be sufficiently rapid so that
Jan 1, 1986
-
What It’s Worth: A Review of Mineral Royalty Information (4178ebfd-43fd-4737-9a8f-b9aacca3e3c3)By H. Lyn Bourne
The is the 14th consecutive year for this column and the 13th in which the royalty data have been tabulated. Some holes still exist in the list of royalties that readers hopefully will fill. Construct
Jan 1, 1995
-
Rock Mass Characterization By Artificial Neural Network With Three-Dimensional Representation Of Its Output DataBy C. R. Daly, D. Biswas
This study presents the development of a simplified artificial neural network (ANN) for the characterization of rock mass with a simultaneous display of its output in a three-dimensional interactive e
Jan 1, 2003
-
Spatial Characterization And Sampling Of Mine WastesBy Martin L. Smith
Sampling and subsequent geostatistical structural analysis is being carried out on the Bunker Hill Superfund site in northern Idaho's Silver Valley. This paper reports on the findings and methodo
Jan 1, 1992
-
Hazardous Roof Structures In Appalachian Coal MinesBy Noel N. Moebs, John L. Ellenberger
Geologic structures in mine roof rock contribute to many roof falls in Appalachian coal mines. These structures include paleochannels, scours, pinch-outs, slickensides, clay veins, and cravasse splays
Jan 1, 1982
-
Distribution Of Mercury Resistance Genes Among Resistance Determinants In Contaminated Soils In The UKBy S. Ford
The introduction of recent advances in molecular biology into the field of microbial ecology has made available a powerful set of analytical tools for dissecting the structure of microbial communities
Jan 1, 1988
-
Rapid efficiency determination of coal cleaning unitsBy M. G. Ayat
Engineers in the field of coal preparation are continually striving to increase the efficiency of various circuits used in preparation plants. Undoubtedly, one of the important factors concerning the
Jan 1, 1987