Wireless Site Data Collection In Construction And Its Impact On The Business Process
By Jason N. Scott
It is now possible using low-cost wireless technology and rugged hand-held devices to record data on site electronically and for that data to be instantly available to others. This could potentially e
Jan 1, 2006
-
San Francisco-Oakland Bay Bridge: OPA Winner
By Gerry Houlahan
"The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa
Jan 1, 2015
-
Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)
By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Proposed Micropile Section for the 2006 IBC
By Lawrence F. Johnsen, Marc J. Gallagher
"Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap
Jan 1, 2005
-
Micro-Pile Foundations in Difficult Subsurface Conditions
By D. Dreher Whetstone, Paul M. Blakita, Christopher M. Reith, Ravi P. Malviya
"Micro-piles are small diameter (5 to 10 inches), cast-in-place piles which can develop high load capacities by bonding with soil or rock. Micro-piles are particularly well-suited for moderate to heav
Jan 1, 2005
-
Base Grouted Piles In Thanet Sands, London
By D. E. Sherwood
Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre
Jan 1, 1989
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?
By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.
By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
A Realistic Approach Toward Stray Current Induced Corrosion Affecting Steel Sheet Piling
By Anne Fagot
Because of the risk of corrosion caused by stray currents, steel foundations and steel sheet piling are generally prohibited in the vicinity of railway structures. Steel solutions are only accepted if
Jan 1, 2008
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions
By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
Session 20 "Grouting for Water Retaining Embankments"
By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003
-
Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application
By Andhra Pradesh, Nagarajkumar B. V
As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad
Sep 1, 2022
-
Laboratory Validation Of In-Situ Tests - 1. Introduction
This paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing
Jan 1, 1987
-
Innovations in Mass Stabilization for Ground Improvement and Environmental Remediation
By Charles M. Wilk
"Mass stabilization (MS) is a ground improvement technique that can prepare areas of low bearing strength soil for subsequent infrastructure development. The technique involves mixing binding agents s
Jan 1, 2015
-
Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications
By Michael E. Ameel
The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co
Jan 1, 2010
-
DFI Mission Executed Through Growth of Micropile Technology
By Jim Bruce, Peggy Hagerty Duffy, Mary Ellen Large, Allen Cadden
"Over the past 40 years, Deep Foundations Institute (DFI) has executed its mission “to bring together multi-disciplined individuals and organizations to find common ground and create a shared vision a
Jan 1, 2017
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 260 Load Tests
By Jesús E. Gómez
A recent bridge underpinning project provided a unique opportunity to obtain information on the load-deflection response of 260 hollow-core bar micropiles. All production micropiles were proof-tested
Jan 1, 2007
-
Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, Missouri
By Adrian M. Keller
Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer
Jan 1, 2010
-
Experiences And New Developments In Offshore Foundation
By Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
Use of Post-Grouted Drilled Shafts in Coastal Mississippi
By Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015