Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation Support
By Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
Effect of Sand Density on Load Sharing Mechanism of Piled Raft Foundation
By Rouzbeh Vakili, Adel M. Hanna
"The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und
Jan 1, 2017
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)
By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project
By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified Overburden
By Michael J. Marasa
"Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal
Jan 1, 2017
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons Learned
By Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Behavior Of Friction Piles In Soft Clays
By Safwan Labanieh
An experimental set-up is specially designed to study the behavior of a friction pile of 3 cm diameter in contact with the soft clay of Mexico City in a small calibration chamber (CC) of 30 cm diamete
Jan 1, 2002
-
Testing Foundations for Major Minnesota Bridges
By Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo
Jan 1, 2013
-
Engineering Foundation Support For Las Vegas Strip's Tallest Hotel Casino
By Nicholas P. Gura
This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A
Jan 1, 2007
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles
By Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Torque Correlation Factors For Round Shaft Helical Piles
By Donald A. Deardorff
The capacity of a helical pile can be determined analytically using the individual bearing or cylindrical shear methods which are dependent on soil strength parameters and helical bearing area. The t
Jan 1, 2007
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques
By Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building
By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method
By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Micro-Biological Attack On Deep Foundation Concrete
By Piotr D. Moncarz
As major urban areas begin to run out of "good-terrain" for their expansion, they begin to claim high water-table areas within or adjacent to water fronts or swamps. Similarly, major infrastructure pr
Jan 1, 2002
-
Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada
By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak
"The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.
Jan 1, 2017
-
Hammer-Grout Piles At The Bronx-Whitestone Bridge
By Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in Reno
By K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Construction Dewatering Challenges in Urban Environments
By Rafael A. Rivera
"Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re
Jan 1, 2017
-
Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? Synopsis
By X. Y. Hou
The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s
Jan 1, 2010