Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal
By Randy R. Huberty
Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result
Jan 1, 2001
-
5 Pile Testing - Pile Testing
By George Goble
I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is
Jan 1, 1994
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction
By Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006
-
Connecting Railway Lines In Vienna With Underground Structures - Synopsis
By Rüdiger Wunsch
The new high speed Vienna - St.Pölten line and the Lainzer tunnel are to be connected to the existing Western railway line in Vienna. This involves building an underground cut and cover branching tunn
Jan 1, 2000
-
Keynote Lecture: Axial Design And Lateral Design - Deep Foundations
By Mike Neill, O&apos
? Bypass soft soils near the surface ? Resist uplift loads ? Resist lateral loads ? Bypass scourable soils ? Bypass liquefyable soils ? Mitigate movement of expansive or frozen soils ? "Tu
Jan 1, 1998
-
Theoretical And Experimental Investigation On Underwater Ground Anchors
By Leonello Sciacca
Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas
Jan 1, 2011
-
Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine
By Timothy J. Myers
Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso
Jan 1, 2009
-
Application Study On Non-Destructive Static Test Pile
By Han Xuanjiang
Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen
Jan 1, 1991
-
Rock Socketed Drilled Shafts in Electrical Substations
By Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River Tramway
By Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)
By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
Nature And Functions Of A Geotechnical Consulting Firm ? Synopsis
By D. V. Roberts
Approximately 800 private consulting engineering firms in America specialize in geotechnical engineering. The gross income from these firms totals about $500 to $600 million per year. Sixty-five to se
Jan 1, 2010
-
Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour
By Guo H. Lei
Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro
Jan 1, 2006
-
First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? Introduction
By Gordon King
The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil
Jan 1, 2004
-
Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones
By Dan A. Brown
The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos
Jan 1, 1991
-
The Effect of Arching Pressure on a Vertical Circular Wall
By Sangseom Jeong, Kyoungyul Kim, Jaeyeon Cho
"Abstract The lateral earth pressure of vertical circular shaft is investigated by using experimental tests and a theoretical analysis. The emphasis was quantifying on the magnitude and distribution o
Jan 1, 2014
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details
By Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental Results
By Walter I. Paniagua
Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a
Jan 1, 2007
-
Load Transfer Curve of Piles in Sands under Uplift Forces
By Jogeshwar P. Singh, Aser I. Abbas, Mohamed Ashour
The presented methodology predicts the pile head response (i.e. pile head load - displacement curve) and develops the load transfer (t-z) curve of piles in sandy soils under tension forces based on so
Jan 1, 2018
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History
By Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003