Numerical Evaluation of Top of Rock Profile, Rock Strength and Conductivity.
By Zhang Wengang, L. John Endicott
The properties of many geological materials are variable. This is especially true for variations in elevation of the top of rock profile, strength of weathered rock, and conductivity of rock masses. O
Jan 1, 2019
-
Retaining Structure for Berth at Krishnapatnam
By P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
Utilizing Drones to Improve Project Workflows
By Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
Design And Construction Of The Deepest Cfa Pile In Australia
By W. L. Chong
For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und
Nov 1, 2022
-
Injecting Sustainability into Deep Soil Mixing Projects
By Paul R. Lear
Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi
Sep 8, 2021
-
Numerical Study On Behavior Of Unreinforced And Reinforced Disconnected Piled Raft Foundation
By P. Seethalakshmi, Yatakuri Yaswanth Naidu
The use of a single pile, group of piles with pile cap, piled raft foundation system, etc., are prevalent in transferring the superstructure load from the soft soil layers to the firm underground laye
Sep 1, 2022
-
Innovative Earth Retention Project for a Parking Garage
By Andreas Brandner, Karl Schoenherr-Strasse, I. B. Brandner, Dipl. Ing
"A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long bui
Jan 1, 2016
-
Construction-Induced Vibrations And Green Concrete: Literature Review And Case History
By William M. Camp
Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s
Jan 1, 2010
-
Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian Aquifer
By C. Dai, S Raathiv
The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th
Nov 1, 2022
-
Wolf Creek Dam Foundation Remediation – An Innovative Solution
By Fabio Santillan, Lyndon Bedford
"This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra
Jan 1, 2015
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp
By Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation Project
By Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus
A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba
Sep 1, 2022
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The Project
By D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010
-
Philadelphia Dock Story—Pile Challenges at Delaware River
By Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)
By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
The Road to Innovation in Geotechnical Construction (f2290583-6329-4b39-a4c9-b746aba3a1f4)
By Peter J. Nicholson
"IntroductionDuring my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concre
Jan 1, 2017
-
Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)
By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi
"A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
Jan 1, 2017
-
Nyct's 207th St Yard Floodwall
By Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Ground Improvement Utilizing Vibro Probes Eliminates Liquefaction Concern For A Bridge Foundation
By Aly M. Mohammad
Croton Point Avenue Bridge carries Croton Avenue over Metro-North main tracks at Harmon Rail Yard in Westchester County, New York. The new bridge is 1100 foot long and 36 foot wide nine span structur
Jan 1, 2007
-
Advances In Marine Piling Techniques And New Age Piling Materials
By D. Cantali
This paper will be presented in two parts. The first part will present the latest advancements in pile installation techniques using state-of-the-art press-in piling technology by Giken. By pressing i
Nov 1, 2022