Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    Current Trends in Heap Leaching

    By R. B. Throndycraft

    "1. Belt-Drop Agglomeration Preferred at Heap Leach Operations. The agglomeration method now preferred at heap leach operations utilizes belt-drops along conveyors. Belt-drop agglomeration is being de

    Jan 1, 1989

  • CIM
    The Polaris-Taku Mine, Tulsequah, B.C. Geology and Development

    By D. C. Sharpstone

    THE Polaris-Taku mine is a new gold property, situated in the far north-west corner of British Columbia. Production was started in November, 1937, at the rate of 150 tons a day, and recently has been

    Jan 1, 1938

  • CIM
    Separation and Purification of Rare-Earth Elements Based on Electrophoretic Migration

    By P. Hajiani

    "Feasible and sustainable separation of lanthanides outside of China has been a dilemma for the past few years. The present technique uses REE electrophoretic mobility (Ui) variation in an electrical

    Jan 1, 2016

  • CIM
    Finite Element Evaluation of the Residual Stress Fields Obtained by Hole Expansion on 6061-T6 Aluminum Welds

    By K. C. Viveros, R. R. Ambriz, C. García, F. De Villèle, A. Talha, D. Jaramillo

    Cold hole expansion on base metal, weld metal and heat affected zone of 6061-T6 aluminum alloy welds was simulated by means of finite element method. Three dimensional compact test models with a previ

    Jan 1, 2014

  • CIM
    Amalgamation of Auriferous Concentrates

    By A. E. Flynn

    THERE is at the present time a revived interest in amalgamation, due to the number of mines starting up, usually on high-grade ore, and utilizing this relatively cheap and convenient means of recoveri

    Jan 1, 1939

  • CIM
    A Review of Flotation Columns Application in Rougher Circuits

    By M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh

    "Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut

    Jan 1, 2011

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    Optimizing Grinding Circuits

    By James Anstey

    BHP Billiton?s Cannington facility is a mining and minerals processing plant near Mt. Isa in Central Queensland, Australia, producing silver, lead and zinc. Mine ore is processed in a concentrator, wh

    Apr 1, 2005

  • CIM
    Origin of the Soft Iron Ores of the Knob Lake Range

    By Stephan I. Zajac, Roger A. Blais, John B. Stubbins

    THE iron deposits of central Labrador occur within a relatively small area, herein called the Knob Lake Iron Range, in which a northwest-trending series of low hills and ridges defines the height-of-l

    Jan 1, 1961

  • CIM
    Tendencies and Considerations for Energy Efficiency in Sag Mill Circuit Design from Recent Projects in Chile

    By C. Schuffeneger

    "The design of SAG milling circuits for mining projects requires the incorporation of the energy consumption considerations and the evaluation between different flexibility-adding options to absorb th

    Jan 1, 2012

  • CIM
    Explosives choice at East Kemptville Mine

    By J. M. Houston

    "In October 1982, Rio Algom Limited, purchased a tin prospect near East Kemptville, Nova Scotia, from Shell Canada Resources. This purchase led to the development of the first substantial tin mine in

    Jan 1, 1987

  • CIM
    Process Safety Management

    By Ertugrul Alp

    Alp & Associates - Who We Are ?? Canadian consulting company (1999-?) ?? Principal Consultant: Dr. Ertugrul Alp, P.Eng. ?? Over twenty-five years experience serving the chemical, mining, pulp & pap

    May 1, 2008

  • CIM
    Real Time On-Belt Elemental Analysis Using PGNAA for Mineral Processing Plant Control

    This paper discusses how elemental analysis of conveyed bulk flows in real time using PGNAA (Prompt Gamma Neutron Activation Analysis) technology has resulted in significant improvements in advancing

    Jan 1, 2014

  • CIM
    A Novel Separation Process for Detoxifying Cadmium-Containing Residues from Zinc Purification Plants

    By Diankun Lu, Ganfeng Tu, Edouard Asselin, Feng Xie

    A novel separation process for detoxifying cadmium-containing residues arising from zinc hydrometallurgical processes has been developed. An initial investigation indicated that a high concentration o

    Jan 1, 2014

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits

    By M. Drozd, M. Somppi, Z. Yamak

    "Granular activated carbon is widely used in the gold mining industry for gold extraction from aurocyanide-containing slurry. The extraction process can employ carbon as part of the gold recovery oper

    Jan 1, 2017

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Mettop´s New Ionic Liquid Cooling Technology is the Safest Way to Cool a Furnace

    By Stefan Wallner, Andreas Filzwieser, Stefan Konetschnik, Reinhard Preiss, Iris Filzwieser

    "Process Safety Management for METTOP means avoiding risks as far as possible - but also dealing with the residual risk by using all existing management tools or external assistance, if required. The

    Jan 1, 2014