Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Genetic Aspects of Michipicoten Iron Formations

    THE Michipicoten area, one of numerous iron-bearing "Archean" segments in the Shield, contains two main types of iron formation, a normal Keewatin-type, consisting of interbanded chert, siliceous magn

    Jan 1, 1961

  • CIM
    The Thompson Retrievable Diamond-Drill Wedge and Arc Cutter

    By Andrew J. Troop

    "VAUGHAN THOMPSON designed the Thompson retrievable diamond drill wedge and reaming assembly in 1948. Since 1950, the Hudson Bay Exploration and Development Company, Limited has used the method extens

    Jan 1, 1953

  • CIM
    Wear mechanisms in high silicon content Al-Si alloys produced by casting and spray deposition

    By M. Elmadagli

    Wear mechanisms of two commercial aluminum alloys, namely a spray formed and extruded Al-25%Si alloy, and a sand cast A390 alloy (18.5 %Si) that are known to be successful in cylinder bore technology

    Jan 1, 2004

  • CIM
    Development of the Heavy Minerals Potential of the Athabasca Tar Sands

    By Lloyd W. Trevoy

    Titanium and zirconium heavy minerals occur in the tailings streams from processing plants which use the hot-water extraction process for recovery of bitumen from tar sand. In a research program cond

    Jan 1, 1978

  • CIM
    Geology and Mineral Exploration Potential of the Quesnel Trough, British Columbia

    By Howard W. Tipper, Richard B. Campbell

    "The Quesnel Trough is underlain by a thick sequence of mainly Upper Triassic and Lower Jurassic volcanic-clastic and sedimentary rocks that lie between the highly deformed Proterozoic and Paleozoic r

    Jan 1, 1970

  • CIM
    Enabling Progressive Energy Management Practice in Minerals Operations

    By K. Bullock, M. Levesque, G. Lyle, D. L. Millar

    ABSTRACT The options for reducing the carbon footprint of energy use in mining fall into three categories of activity: i) reducing demand, ii) improving energy utilization, and iii) adopting low carbo

    Jan 1, 2012

  • CIM
    Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” Rocks

    By D. J. Scarpato

    "Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t

    Jan 1, 2015

  • CIM
    Developments in Conveyor Belting for Mines

    By J. B. Kitchin

    "The design of conveyor belting for use in mines poses problems to the manufacturer that are unique. The challenge to be met is that of the production of a conveyor belt which can withstand use and mi

    Jan 1, 1967

  • CIM
    Advanced Process Control for Grinding Circuits

    By D. Groenveld, M. Rozou

    "Recent trends move towards automation, smart sensors, internet of things, powerful DCS, and more data. Are those trends already utilized in a real time production environment? Today operators still h

    Jan 1, 2016

  • CIM
    The lighting evolution - A bright future for safety, efficiency and control

    By Bill Charbonneau

    Lumen, lm The measurement unit of light emitted by a light source 60W incandescent840 lumens 32W T8 linear fluorescent3200 lumens 54W T5HO linear fluorescent5000 lumens 400W metal halide24,000 lu

    Oct 1, 2010

  • CIM
    Influence of Crystallization Conditions on the Preparation of Mesoporous Materials from Natural Zeolite

    By Wengui Su, Qi Zhang, Junce Wang, Zhijun Ma, Xingyuan Weng

    "Mesoporous materials with large specific surface area, pore size, and pore volume have been widely used in many fields such as ion exchange, gas separation, adsorption, and catalysis. Mesoporous mate

    Jan 1, 2016

  • CIM
    Roof Bolting (3babbf54-666a-462b-badb-962e55d68b9e)

    By L. M. Dwarkin

    Introduction Avital factor in the success of any coal mining operation is the method of roof support employed. A coal seam in? place has been described as the filling in a geological sandwich and the

    Jan 1, 1951

  • CIM
    Le Gisement Silidor

    By Sylvain Picard

    "RESUMELe gisement Silidor représente la dernière découverte effectuée dans le camp minier de Rouyn-noranda (fin 1985). Située à 5 km à I' ouest-nord-ouest de Rouyn-Noranda, ce gisement aurifère doit

    Jan 1, 1990

  • CIM
    Risk analysis related to mineral exploration and mine development

    By Denis Yaychuk, Gary Billingsley

    The economic eva luation of a mineral property or mining venture should include the quantification of ri k as part of the analy is. The re ults of such an analysis provide the decision-makers not only

    Jan 1, 1986

  • CIM
    Bond Is Back!

    By Mark Sherman

    One of the main functions of a process technology and engineering services provider is to select grinding equipment that will meet the client?s throughput rate target. Prudent risk mitigation strategi

    Jan 1, 2012

  • CIM
    Prevention of nozzle clogging by the reduction of refractory permeability

    By D. C. Van Aken, O. J. Rajtora

    A research effort sponsored by the Department of Energy (DOE) and several steel producers, is investigating the benefits of coating steelcasting nozzles with various materials. Coatings were applied t

    Jan 1, 2004

  • CIM
    A Report of the Research Committee Coal Division C.I.M.

    By E. Swartzman

    "DURING 1951, experimental cleaning studies on both fines and larger sizes of certain Canadian coals were conducted on a relatively large scale in two pilot plants in the United States, large enough t

    Jan 1, 1952

  • CIM
    Analysis on Sag Mill Liner Failure

    By E. Vesely, A. Saxena

    "SAG mill liners are designed for protecting the mill shell and providing lifting power for ore charge and grinding media. Due to the impacts from the charge and the grinding media, the liner experien

    Jan 1, 2019

  • CIM
    On Increasing Reliance on Numerical Modelling and Synthetic Data in Rock Engineering

    By T. G. Carter

    "Tremendous progress has been made in recent years towards developing computational tools that allow ready solution of most common rock engineering problems, with amongst the most advanced of the tool

    Jan 1, 2015

  • CIM
    Bond is Back!

    By Mark Sherman

    "One of the main functions of a process technology and engineering services provider is to select grinding equipment that will meet the client’s throughput rate target. Prudent risk mitigation strateg

    Jan 1, 2012