Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Drilling of EM Anomalies Caused by Overburden

    By D. C. Fraser, W. J. Scott

    "Airborne electromagnetic surveys were flown during 1965 in the Moose River area of Ontario. The systems used were INPUT Mark II and the Canadian Aero Otter. Anomalies indicated by both systems were l

    Jan 1, 1973

  • CIM
    Laboratory Simulation of Induced Seismicity

    "Successive seismic waves may cause progressive weakening of a fault zone, which has been recognized as the mechanism of earthquake aftershocks. However, it is unclear that how a fault zone slips unde

    Jan 1, 2015

  • CIM
    Development and Construction of the Antamina Surface Water Management Facilities

    By Matt Schuett

    Antamina Mine Facts • Surface Water Design Principles • Drainage Areas • SEDCAD Modeling • Impacted Runoff Collection • Clean Runoff Collection • System Flexibility • Outfall Construction

    May 1, 2004

  • CIM
    Reducing Heat-Induced Health and Safety Problems in Underground Metal Mines by Means Of New Technologies and Renewable Energy-Based Cooling Systems

    By K. Scalise, M. Teixeira, K. C. Kocsis, J. Parrish

    "This paper aims to introduce and discuss a newly developed algorithm, which can be uploaded on smart watches and other mobile devices to inform and protect underground personnel working in hot and hu

    Jan 1, 2019

  • CIM
    Scientifically Difficult and Challenging Issues in Chinese Rock Engineering

    By P. Lin, S. G. She

    "In June 1985, Chinese Society for Rock Mechanics and Engineering (CSRME) was established. During the past 30 years, various major achievements are made in the discipline of rock mechanics and rock en

    Jan 1, 2015

  • CIM
    Thin Spray-On Liner: A Project Update on Current Work In Sudbury, Canada

    By C. Graham

    Thin Spray-On Liners (TSLs) have been researched and in development for over two decades and yet their fully functional and widely justifiable application in mining has yet to be achieved. While the e

    Aug 1, 2013

  • CIM
    Design of Backfill and Grouting Systems Used as Support in Polish Mines

    By J. Palarski

    In the Polish coal mining industry, the use of mine waste in underground backfill has been the most common means of providing ground support to minimize surface subsidence, increasing extraction ratio

    May 1, 2007

  • CIM
    Coal mining in the Drumheller district

    By T. Patching

    "Introduction The occurrence of coal was first reported in the Drumheller area in 1793 but it was not until 1912 that production of coal was recorded. In that year 13,000 tonnes were mined in the Drum

    Jan 1, 1985

  • CIM
    Quantified Benefits of Automated Loading of Remote-Controlled LHD Vehicles in a Production Environment

    By E. Brouillette

    Difficult operating and mining conditions such as low visibility, difficult roadbeds, fast cycling, small openings, and sharp corners create high demand for LHD manoeuvrability and operator dexterity.

    May 1, 2003

  • CIM
    The Mineral Industry and Urbanization

    "Since World War II, urban communities have expanded at an unprecedented rate. The industrial mineral industry supplies the sand, grave], limestone, crushed rock, cement, gyp-sum, etc. for urbanizatio

    Jan 1, 1968

  • CIM
    The history of gold discoveries in Canada - an unfinished story

    By Donald A. Cranstone

    "This paper provides a bird's eye view of the pattern of gold discoveries since 1823, the year of Canada's first gold find, up to 1983. Within this 160-year period, more gold was discovered

    Jan 1, 1985

  • CIM
    Nexgen Energy’s Arrow Deposit, Southwestern Athabasca Basin, Saskatchewan: A Geostatistical Approach To Deposit Development

    By Troy Boisjoli, Sean Hillacre, Matt Batty

    Discovered in 2014, the Arrow Uranium Deposit has undergone rapid development through successive drilling programs informed by geostatistical drill hole spacing studies. An independent third-party geo

    Jan 1, 2020

  • CIM
    Hydraulic Fracturation Simulated by a 3D Coupled HM-DEM Model

    By B. Chareyre, H. Pourpak, L. Scholtès, E. Papachristos

    "Numerical methods used to study hydraulic fracturing in low permeability rock masses need to take into account the interaction between the progressive failure mechanism of the intact rock matrix and

    Jan 1, 2015

  • CIM
    Mines Aurizon Ltée: Casa Berardi et Bien Plus

    By Martin Bergeron

    Producteur d?or de taille intermédiaire Mines Aurizon Ltée Bureau-chef àVancouverMine et projets localisés au Québec2

    May 1, 2011

  • CIM
    Challenges in Pneumatic Conveying of Concentrate and Flue Dust at Copper Smelters

    By E. Lehtila, J. J. Talja, R. Jahila

    Kopar Oy is acknowledged for engineering and manufacturing of robust systems for bulk material handling, especially at power plants and non-ferrous smelters. We have over thirty years of experience wi

    Jan 1, 2019

  • CIM
    Presentation of a Web-Based Database Design for Documentation and Analysis of Rock Properties

    By K. Thuro, H. Käsling, F. Menschik

    "With increasing data volume, due to enhancing requirements for ground investigation programs for large construction projects, the demand for more efficient filing systems is more and more growing. De

    Jan 1, 2015

  • CIM
    Geology of the Aviat Kimberlites, Melville Peninsula, Nunavut

    To create a successful growth oriented diamond company that succeeds in the practical business of mining and selling rough diamonds, and which pursues an aggressive exploration strategy to seek and de

    May 1, 2008

  • CIM
    Suncor Energy Inc. - Oil Sands

    By Brad Bjornson, Geoff Stevens, Mike Ashar, Cliff Britch

    "LocationThe facilities are located 30 km north of Fort McMurray, Alberta (or 470 km northeast of Edmonton, Alberta).Brief Description of OperationThe operation includes the mining of oil sands, extra

    Jan 1, 2000

  • CIM
    Experimental and Numerical Analysis to Determine the Transition from Mode-I to Mode-II Fracture

    By Rakesh Kumar, Rajabrahma K., A. K. Verma, V. Mukesh

    "In this study, laboratory investigation as well as numerical investigation is carried out to ascertain the transition from one mode to another for Semi-circular bend setup. Laboratory investigation i

    Jan 1, 2015

  • CIM
    Innovative Technology System for Ground Support with a Fast, Safe and Fully Mechanized Way of Installing Wire Mesh

    By J. Kalejta

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in-situ stresses and associated seismicity with potential rockburst hazards are the

    Aug 1, 2013