Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Implementation of New Technology at Barrick Gold

    By N. M. Stubina, P. J. Lind

    Barrick Gold is in the process of building several new mines and implementing new processes at existing mines for which metallurgical technology is of key importance. The roles of the company's S

    Jan 1, 2011

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • CIM
    Analysis of Decisive Factors in Opening an Underground Dimensional Limestone Quarry

    By I. Cotman

    Dimensional stone processing has become an important part of the world extractive industry, and today?s total stone block yearly production is estimated to be around 134.000.000 tons and is still grow

    Aug 1, 2013

  • CIM
    A Recommended Rock Classification for Rock Mechanics Purposes

    By T. H. Patching, D. F. Coates

    The Sub-Committee on Rock Classification, Canadian Advisory Committee on Rock Mechanics, has evolved a classification of rocks which should prove useful in studies of rock mechanics. Considered in two

    Jan 1, 1968

  • CIM
    General Mining Conditions at Eldorado Beaverlodge

    By Norman A. Grant

    "Location and Transportation FacilitiesTHE BEAVERLODGE area of North Saskatchewan is on the north side of lake Athabasca, 500 air miles northeast of Edmonton.The main Eldorado operation and townsite a

    Jan 1, 1953

  • CIM
    The Hydraulic Air Compressor ? a forgotten solution for mineral processing?

    By Dean Millar

    Clean, green, cheap compressed air can be produced efficiently and renewably by modernization of a 19th century technology ?The hydraulic air compressor has no moving parts ?After commissioning, th

    May 1, 2013

  • CIM
    A time-value framework for reporting mineral assets

    By E. J. Sides

    In this paper, the argument is put forth that the codes used for public reporting of mineral resources and mineral reserves have some significant limitations with regard to the information provided to

    Jan 1, 2010

  • CIM
    Pillar Recovery at Lamaque

    By The Mine Staff

    THE PROPERTY of the Lamaque Mining Company, Limited, ?is located in the Town of Bourlamaque, seventy miles east of Noranda, in Bourlamaque township, Abitrbi county, north western Quebec. Gold produc

    Jan 1, 1957

  • CIM
    Engineering Excellence into Large Diameter Drill and Blast Shaft Sinking Stages and Galloways for Safety and Productivity

    By T. E. Wakefield

    "Final Galloway (stage) designs for vertical drill and blast shaft sinking projects evolve from complex thought patterns which integrate operational processes, systems and methods of communication, po

    Jan 1, 2019

  • CIM
    Line Spacing Effect and Determination of Optimum Spacing, Illustrated by Marmora, Ontario, Magnetic Anonmaly

    By W. B. Agocs

    "AbstractThe airborne magnetometer data of the Marmora iron ore deposit at Marmora, Ontario, have been used as an example to show the mapped results obtained by the use of line spacings of from 1 mile

    Jan 1, 1955

  • CIM
    Ultra-Fine Grained High Carbon Steel by Innovative Deformation

    By A. W. F. Smith, P. B. Prangnell, D. N. Crowther, P. J. Apps

    It is well known that the refinement of grain size in metals leads to a significant improvement in important mechanical properties. As part of a European collaborative project, processing schedules ha

    Jan 1, 2004

  • CIM
    Super Fine Grinding of Copper Concentrates for Pressure Leach Processing by Phelps Dodge

    Phelps Dodge has recently operated a commercial scale, super fine grinding circuit of copper concentrates for use in a medium-temperature pressure leaching process. Two 355 kW vertical stirred mills w

    Jan 1, 2007

  • CIM
    Volcanic stratigraphy and structure of the Mobrun Mine

    By Marie-France Caille, Carl Caumartin

    "Audrey Resources' Mobrun Mine is located in Dufresnoy Township some 30 km to the northeast of Rouyn-Noranda. The Mobrun tine deposits consist of two major massive sulphide lenses; the newly discovere

    Jan 1, 1990

  • CIM
    Ecological Costs of Open Pit Coal Mining and their Influence on Ultimate Pit Design

    By X. Gu

    Mining operations, especially surface coal mines, have great impacts on the local ecosystem and the environment. However, it has been a common practice in mine design that the economic evaluation cons

    Aug 1, 2013

  • CIM
    Surface Temperature, Rock Temperature and The Rate of Heat Exchange

    By R. W. Thompkins

    MINE operators are concerned with temperature conditions in their mines, particularly the effects of high temperatures on the l1ealth and efficiency of tl1eir employees. This paper is written to focus

    Jan 1, 1962

  • CIM
    The komis gold deposit and ep zone waddy lake area, saskatchewan

    By Brian C. Asbury

    Gold-bearing quartz veins with auriferou pyritic wall rock alteration haloes at the Komis deposit near Waddy Lake in northern Saskatchewan occur in fractured Archean intermediate volcanic rock flankin

    Jan 1, 1986

  • CIM
    Aerial Survey of Open Pits at Lake Asbestos of Quebec

    By Maurice Lauzon

    "Aerial surveys of the open pits have been conducted regularly at Lake Asbestos of Quebec, Ltd. -a subsidiary of American Smelting and Re-fining Company -since 1958. Ground controls are supplied by La

    Jan 1, 1967

  • CIM
    Stratigraphic and structural setting of gold-bearing shear zones in the yellowknife greenstone belt

    By W. A. Padgham, H. Helmstaedt

    Field evidence for current hypothe e about age and kinematic ignificance of gold-bearing hear zones in the Archean Yellowkni fe greenstone belt is reviewed , and it is concluded that major disagreemen

    Jan 1, 1986

  • CIM
    Accounting Methods at Lake Shore Mines

    By G. F. Doggett

    In describing accounting methods at Lake Shore Mines, it is the intention of the writer to limit the discussion to the principal features of the system used in securing cost figures and other statisti

    Jan 1, 1935

  • CIM
    The Ecstall Story; The Geology Department

    By Richard R. Walker, John J. Watkins, Allen C. Amos, Matulich. Angelo

    THE KIDD CREEK MINE is located within the Abitibi greenstone belt, near its west end, in an area known as the Porcupine mining camp (Fig. 5). The Abitibi belt, long known for its many major gold and b

    Jan 1, 1974