    Hydrogen Cracking and Fracture of Galvanized Transmission Tower Bolts

    By J. C. Thornley

    Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si

    Jan 1, 1979

  • CIM
    Power Quality and Production Improvement of an Iron Ore Mine by the use of an SVC

    By Niklas Willemsen

    Introduction to SVCs ? SVC = Static var Compensator ? Dynamic step-less control of reactive power without switching of passive components: ? Voltage control/stabilization ? Harmonics- and flicker

    Aug 1, 2013

  • CIM
    Risk Management in Carbon Sequestration: Case Studies from Unconventional Reservoirs in the Appalachian Basin

    Risk management has taken on renewed vigor since the economic crisis of the late 2000s. The resources of governments, individuals, and corporations are being stretched to a point where only the most p

    Aug 1, 2013

  • CIM
    Wear

    By H. R. Banks

    IF you have ever travelled in the valley lying between the Selkirks and the Rockies in the East Koorenay district, you will have noted that the former mountains are rounded and massive, while the serr

    Jan 1, 1943

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • CIM
    Milling Practice at Perron Gold Mines

    By P. B. Demarsh

    "Location: - Mine village of Perron, 11 miles east of Val d’Or in northwestern Quebec.Life; - Started production 1932, ceased 1951.Ore: - Flat lying quartz tourmaline veins within granodiorite. Gold v

    Jan 1, 1966

  • CIM
    Wireless Networks What You Must Have to be SUCCESSFUL

    By Gary Anderson

    ??Privately Held Corporation ??Incorporated in Delaware, May of 2002 ??HQ in Malvern, PA (just outside Philly) ??Approx 40 employees ?9 Field Engineers ?MSHA Certified ?10 Development/NOC Enginee

    May 1, 2009

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • CIM
    The Explosion in Hillcrest Mine, Alberta, September 19th, 1926

    By George Rice

    Foreword Following the explosion in the Hillcrest mine, which occurred in the evening of Sunday, September 19th, 1926, and in which two men lost their lives, the writer was invited by the Hon. J.E.

    Jan 1, 1928

  • CIM
    Improved Methods for Evaluation of Visibility for Industrial Vehicles Towards Safety Standards

    By Soumitry J. Ray

    Poor visibility of powered industrial vehicles, such as forklifts, used in industry is often the cause of accidents that include pedestrians. Current standards allow up to 20 % non-visible regions for

    Aug 1, 2013

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada (7fbdd5b5-ed88-46a3-b280-65b8ab04c5b6)

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "Abstract — The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed an

    Jan 1, 2012

  • CIM
    Accurassay Laboratories: State-of-the-Art Automation of the TSMC Iron Ore Lab

    By Brad McBain

    Agenda ? Accurassay Laboratories and Automation ? History and experience ? Features and benefits of automation in the lab ? Tata Steel Minerals Canada (TSMC) Iron Ore Laboratory ? State-of-the a

    Aug 1, 2013

  • CIM
    Reply to “Arctic mineral wealth — Will there be a two-sided coin?”, by Joanna LaForte

    By D. E. Wakefeld

    "My first reaction to Joanna LaForte’s discussion paper is that she has quite properly assumed that I would like the process of equitable participation between aboriginal landowners and mining compani

    Jan 1, 1996

  • CIM
    Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatments

    By L. Salnais

    "Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti

    Jan 1, 1988

  • CIM
    Treatment and History of Arsenic Bearing Ores at Con Mine

    By Adrian Daniel

    "Dating back to 1934, Con Mine is located directly south to the city of Yellowknife in the NWT, Canada. With mill operations ceasing in 2004, a challenging surface remediation situation resulted which

    Jan 1, 2009

  • CIM
    The Rod Mill in the Sullivan Flow

    By H. R. Banks

    "AbstractThe rod mill introduced into the Sullivan Concentrator flow in September, 1948, replaced two sets of 74 in. by 20 in. rolls and their accompanying screens. In addition to the work formerly do

    Jan 1, 1952

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Techno-economic evaluation of thiosalt treatment processes

    By K. G. Wheeland, J. E. Dutrizac, M. Wasserlauf, A. A. Condy

    Numerous processes for the treatment of thiosalts in base metal milling effluents have been examined in the past decade. Flowsheets for thirteen processes are outlined, and cost estimates are presente

    Jan 1, 1988

  • CIM
    Hydraulic Fill Research at James Cook University in the new Millennium

    By K. Pirapakaran

    The Geotechnical Engineering research group at James Cook University has been working closely with all the leading mines in Australia in the area of minefills. They have carried out substantial resear

    May 1, 2007