Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Continuous Oxygen Probe for Non-Ferrous Smelting Slags

    By Flloyd J. M

    A continuous oxygen probe,incorporating a SIRO2 solid electrolyte oxygen sensor which measured the oxygen potential of a small volume of gas enclosed above the melt's surface,was constructed

    Jan 1, 1987

  • AUSIMM
    TBM Use in Mine Development

    By Zamel G. I, Zenari L. P

    Technological developments in modem Tunnel Boring Machines (TBMs) and associated back-up equipment are offering significant alternatives for mining operators to consider, in the selection of equipment

    Jan 1, 1993

  • AUSIMM
    Continuous Casting of Steel in Australia

    In November, 1967, a four strand curved mould continuous casting machine coupled with a 50 ton basic oxygen furnace began producing billets for the rod mill and new merchant mill at the Newcastle S

    Jan 1, 1972

  • AUSIMM
    Mine Dewatering Project - Pasminco Mining, Broken Hill

    By Mitchell D. S

    BackgroundIn March 1990 Pasminco resolved to replace and increase the capacity of the underground pumping system at the Southern Operations, Broken Hill. The existing pump station was built 23 years a

    Jan 1, 1993

  • AUSIMM
    San Juan Deep Stripping

    Traditionally, surface coal mines in the Western United States have been limited by economics to depths between 150 to 200 feet. Utah International Inc., however, is now planning to strip coal its

    Jan 1, 1981

  • AUSIMM
    New Developments in the Zinc Dust Purification of Zinc Plant Electrolyte

    By Chapman RL

    A new process has been developed to remove the impurities copper, cadmium, cobalt and nickel from a zinc plant electrolyte by cementation on zinc dust. The process has been tested in the laborator

    Jan 1, 1984

  • AUSIMM
    Rifting, Transfer Faulting, and Resultant Cainozoic Volcanism, Maryborough Basin, Southeast Queensland

    Rifting and transfer faulting in the Late Cretaceous to Early Tertiary resulted in the formation of the Bundaberg Trough and Wallaville Basin and deflected the margin of the Maryborough Basin southwes

    Jan 1, 1990

  • AUSIMM
    The Seismic Monitoring Decision at Mt Charlotte Gold Mine

    By Poplawski R. F

    A 32-channel PSS seismic monitoring system was commissioned at Mt Charlotte mine in 1994, and at the time it was the first such system in Australian mines. The system continuously observes the occur

    Jan 1, 1995

  • AUSIMM
    Merrill-Crowe/Carbon-in-Pulp an Economic Evaluation

    By King ND

    This paper presents an economic study comparing two gold recovery processes, zinc precipitation (Merrill-Crowe) and carbon-in-pulp (CIP). Capital, operating, and gold losses costs from an actual CIP

    Jan 1, 1982

  • AUSIMM
    A Review of Automation at Kalgoorlie Nickel Smelter

    By Campain RA, Horner NJ, Limerick JM

    The review covers the different concepts of automation which are appropriate to non-ferrous smelting and the degree to which the smelter, and the furnace in particular, is amenable to total automation

    Jan 1, 1985

  • AUSIMM
    Surface Mining Techniques

    Strip mining offers the advantages of high productivity from both human and capital resources as well as high rates of production. Experience suggests that it will be advantageous to extend strip min

    Jan 1, 1975

  • AUSIMM
    The Use of Electronic Detonators as a Key to Reducing Overall Mining Costs

    Drill and blast operations account for 12 - 15 per cent of total mining costs. This paper looks at a comparison between electronic detonators and non-electric detonators, focusing on the cost benefits

    Jan 1, 2008

  • AUSIMM
    Bulk Mineable Vein Type and Disseminated Gold Mineralization of the Fairbanes Mining District, Alaska

    By Caivin JS, Freeman CJ

    The Fairbanks Mining District in central Alaska was discovered in 1902 and since then approximately 7.5 million troy oz of placer gold, 250,000 troy oz of lode gold, and several thousand short ton

    Jan 1, 1987

  • AUSIMM
    The geology of porphyry-related mesothermal vein gold mineralisation north of Kainantu, Papua New Guinea

    By Thirnbeck M, Sione T, Petrie P, Leach TM, Mori W, Digan K, Harry K

    Gold and lesser copper mineralisation are associated with porphyry-related vein systems periph-eral to two separate inferred intrusive centres north of Kainantu, Papua New Guinea (PNG). The intersecti

    Jan 1, 1994

  • AUSIMM
    Calculation of Rope Life in Mine Hoisting Applications

    An established method exists for the computation of rope lifetimes for shaft hoisting applications in the mining industry. In an earlier study, during the 1990s, an initial comparison of the calculate

    Jan 1, 2005

  • AUSIMM
    The Structure and Flow Resistance of the Coke-Ore Interface

    By Williams ID

    Ore and coke of various size fractions (1 to 11 mm) were packed in a column (146 ó) and resistance to air flow measured under a range of conditions. Results have shown that layered charging results i

    Jan 1, 1975

  • AUSIMM
    Mineral Exploration-Risk Increasing

    Exploration risk increases with time, due to a general decrease in prospectivity as the more accessible deposits are found, and be- cause of rising costs and demands due to an improving standard of

    Jan 1, 1987

  • AUSIMM
    U.S. Bureau of Mines Research in Advanced Mining Technologies

    The Bureau of Mines, with a history of mining research since 1910, still seeks improvement in safety and health along with improvement and competitiveness in the mining industry. Much promise of such

    Jan 1, 1991

  • AUSIMM
    Cannington Growth Project û A Partnering Approach to Design and Implementation

    By D Fargher

    BHP BillitonÆs Cannington operation began production in 1997 and is presently the largest tonnage and lowest cost single mine producer of both lead and silver in the world. The original design capacit

    Jan 1, 2004

  • AUSIMM
    A Retrospective Look at a Drilling Program

    A geostatistical study is made of the drilling results available one stage prior to the present for a tabular deposit. The results show that the blocks required by the mining engineers could have been

    Jan 1, 1976