Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
High-resolution Characterisation of Gold Mineralisation at Plutonic Gold Mine, Western Australia – Evidence for the Late-stage Deposition of High-grade GoldBy R M. Hough, G Duclaux, M A. Pearce, M F. Gazley
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Microcharacterisation, such as that described in this paper, provides understanding of a mi
Mar 18, 2015
-
Proportion of Energy Attributable to ComminutionBy G R. Ballantyne, M S. Powell, M Tiang
This paper reviews the proportion of energy attributable to comminution within the Australian gold and copper mining sector. The need for this is motivated by inconsistencies in the quoted energy usag
Oct 29, 2012
-
CIL Gold Leaching and Adsorption with a Deficiency in Free CyanideBy Derham DW, Newcombe LA
The operations of the Mount Morgan gold tailings retreatment plant were significantly improved in 1984 by the desliming of the CIP plant feed, which reduced cyanide consumption and increased percen
Jan 1, 1993
-
Learnings from review of drawpoint management across New South Wales minesBy X Hill
Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ
Oct 16, 2017
-
The Geology of the Collinsville Coal MeasuresBy Crapp C. E
The Collinsville Coal Measures consist mainly of arenaceous sediments but indude eleven named coal seams. The Formation outcrops around the northern end of tbe Bowen Basin where it attains a thickness
Jan 1, 1960
-
Extension Hill Direct Ship Iron Ore Project – Seven Years in the MakingBy R Forster
Direct ship iron ore (DSO) operations at Extension Hill in Western Australia’s Midwest region have commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves are 14.8 millio
Jul 11, 2011
-
Planning and Installation of the New Underground Winder (No. 2 Hoist) on the Rosebery Mine Inclined ShaftThis paper traces briefly the reasoning which led to the decision to extend the existing internal shaft at the Rosebery Mine and to instal underground a larger winder (No. 2 Hoist) with capacity to ha
Jan 1, 1958
-
The Technical Analysis of Lead Blast Furnace Slag, as Practised at the Port Pirie Works of The Broken Hill Associated Smelters Pty. Ltd.THE slag from the blast furnaces having been granulated, a representative sample is taken to the sample mill. It is then dried, crushed through a 100-mesh screen, intimately mixed, and packeted for as
Jan 1, 1922
-
How Leaky are Oceanic Ridge Axes? A New Assessment of the Spatial Density of Submarine Hydrothermal DischargeBy E T. Baker, J A. Resing, S L. Walker, V Ferrini, F Martinez, R Haymon
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Enumerating active sea floor hydrothermal sites has been a challenge since their discovery
Mar 18, 2015
-
The Pebble Copper-Gold-Molybdenum Porphyry Deposit, South-West Alaska, USABy C M. Rebagliati, J G. Payne, K Roberts
The Pebble deposit, located in south-west Alaska, is one of the largest Copper- Gold-Molybdenum (Cu-Au-Mo) porphyry systems in the world, with a current resource of >8 billion tonnes which contain
Jan 1, 2008
-
Mine Planning at Murrin-Murrin ù Modelling to Determine the Optimum PathThe process of mine planning at AnacondaÆs nickel and cobalt laterite operation located at Murrin-Murrin in the Northern Goldfields of Western Australia is carried out in a number of stages in an ende
Jan 1, 2003
-
Modification to Flotation Cells at the Zinc Corporation LimitedThe paper gives details of the reasons why attention was directed towards the modification of flotation cells. The cell volume and impeller speeds were reduced, and it is estimated that the power cons
Jan 1, 1956
-
Progress Report on Rod Milling at King Island Scheelite (1947) LimitedThe paper gives details of the performance of a 6-ft. by 6-ft. grate discharge ball mill which was converted into a rod mill of the overflow type and then into a grate discharge rod mill. Proposals fo
Jan 1, 1955
-
Automated Drilling Features for Improving Productivity and Reducing Costs in Underground DevelopmentBy J Välivaara
The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines
May 9, 2016
-
Mount Isa Mines Copper Concentrator - An Insight into Current and Historical PracticeBy P Radulovic, W Y. Lui
The Mount Isa Mines (MIM) copper concentrator at Mount Isa processes both chalcopyrite ore from the MIM underground mine and rotary holding furnace (RHF) slag from the MIM copper smelter. There have b
Jul 15, 2013
-
The Pilbara Iron Ore Industry ùThe State of Play and Challenges AheadI would like to start by thanking The AusIMM and CSIRO for organising this excellent conference and inviting me to give a keynote address. Today I will focus on some broad observations of our industry
Jan 1, 2002
-
Rakeless Thickener Operation at St Ives Gold PlantThe first 12 m diameter rakeless thickener in the Australian gold mining industry was installed to treat plant tailings at the St Ives gold plant in April 2000. The plant processes approximately 3.2 M
Jan 1, 2002
-
Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for TunnellingBy F Sandrone, J-P Dudt, J Zhao, E Paltrinieri
Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a
Sep 17, 2014
-
The CENIM_LNETI Process for Zinc Recovery from Complex SulphidesBy Amer S, Novais A. Q, Limpo Gil J
A proprietary hydrometallurgical ammonium chloride process for the recovery of not only zinc, but also copper, lead and silver from sulphidic zinc-rich concentrates has been developed at bench scale
Jan 1, 1993
-
Overcoming Mine Design and Production Challenges at the Sinclair Underground Nickel ProjectBy M J. Ireland, D P. Horne, S J. Simpson
The Sinclair Nickel Project, wholly owned by Xstrata Nickel Australasia (XNA), includes an underground mine, a concentrator, a village, an all-weather airstrip and associated mine infrastructure. The
Mar 26, 2012