Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    The Hishikari Gold Deposit A Case History and Present Status of Exploration

    By Ibaragi K

    High grade ores were intersected in 1981 by a scout drill carried out by the Metal Mining Agency of Japan during a reconnaissance dril ling programme. The original aim of the hole was to explore

    Jan 1, 1987

  • AUSIMM
    The Geology and the Highly Selective Open Cut Mining Method of the Small, Irregular, Narrow and Low Grade St. George Orebodies at Mount Magnet

    The St George orebodies are situated within the tectonically disrupted eastern limb of the Boogardie Syncline.Highly disturbed rafts of banded chert formations occur within a sequence of felsic volcan

    Jan 1, 1984

  • AUSIMM
    Regeneration of 2-Naphthol from Cobalt Precipitate

    By Haigh C. J

    A process has been developed to recover at least 75% of the 2-naphthol contained in cobalt precipitate produced during the removal of cobalt from electrolytic zinc plant solution. The recovered mat

    Jan 1, 1977

  • AUSIMM
    I Think, Therefore I Add Value – Philosophy of Science as a Practical Tool for the Mine Geologist

    By J Vann

    The philosophical context of many activities in mine geology can be an important lever in adding value to operations. For mine geologists (including resource and grade control geologists) we argue tha

    Aug 22, 2011

  • AUSIMM
    Reverse Flotation of Coarse Marcasite and Pyrite From Rutile Concentrate by the Fastflot Process

    By S H. Marshall, H Hutcheson

    Conventional batch cell and FASTFLOT pilot plant studies of reverse flotation of coarse marcasite and pyrite (100 - 400 μm) to reduce the sulphidic sulphur content of a rutile concentrate, were und

    Jan 1, 1998

  • AUSIMM
    Underground Construction Challenges Associated with the Albany Conglomerate in Auckland

    By L J. Strachan, O J. Hawes, S W. Crossen, R C. Roberts

    The Albany Conglomerate is a widespread geological unit found in northern areas of Auckland, New Zealand. It has previously been described as part of the early Miocene Waitemata Group which underlies

    Sep 17, 2014

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Acid Progress for Alumina Extraction

    The CSIRO acid alumina employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process. The two latt

    Jan 1, 1963

  • AUSIMM
    Fuzzy Model of a Multigrade Structure for Support of Decision-Making and Management in Mineral Processing

    By M J. Pejovic, I Miljanovic, A Milutinovic4, T Benovic, A Petrovski

    The paper presents a model of a multigrade monitoring-management structure for support to decision making and management in real and extended time in mineral processing (MP). The model was created as

    Sep 26, 2011

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating Philosophies

    By M S. Fenzel

    Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos

    Jul 27, 2015

  • AUSIMM
    Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG Mill

    By R A. Pax, B Cornish

    "Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly

    Oct 10, 2016

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    A New Semi-automated Method to Rapidly Evaluate the Processing Variability of the Orebody

    By J Jackson, K Nguyen, A Nguyen, E Manlapig

    "With the recent advancement in drill core imaging systems, a large volume of high resolution drill core images can now be rapidly collected and mineralogically classified. This paper introduces a nov

    Jun 15, 2016

  • AUSIMM
    Raising Sangdong – A Staged Approach to the Redevelopment of an Old Operation

    By C Lutherborrow

    The Sangdong Tungsten/Molybdenum Deposit is located in the Republic of Korea and was discovered in 1916. At this time Korea was a colony of Japan. It was mined for two years after discovery closing in

    Aug 22, 2011

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Advancements in Condition Monitoring on Mill Drive Trains for Proactive Maintenance and Early Fault Detection Purposes

    By T Roesch, M Neurohr, S Stratton

    "Dwindling commodity prices are forcing today’s mining operations to increase output. Sometimes the solution is to upgrade the existing infrastructure; however, in most cases it has to be achieved wit

    Oct 10, 2016