Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fluid-Mineral Relations in the Comstock Lode, Storey, Washoe, and Lyon Counties, Nevada, U.S.A.

    The Comstock Lode, a world-class precious metal vein district near Virginia City in western Nevada, U.S.A. (Fig. 1), produced 8.3 million ounces (0.28 X 106 kg) of gold and 193 million ounces (6.5

    Jan 1, 1987

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    Supergene Ore at the Girofla Mine Mungana

    The Mungana group of mines, in the Chillagoe district, yielded 334,000 tons of ore giving 31,831 tons of lead, 7,907 tons of copper and 3,228,600 ounces of silver. The Girofla mine produced approximat

    Jan 1, 1953

  • AUSIMM
    Best Practice Tyre Application Risk Management (TYREARMÖ) at BHP BillitonÆs BMA Goonyella Riverside Mine

    By T Klinge, P Field, N Sugden, D Trenberth

    Mining remains one of the key industries in Australia and many other countries with mineral wealth. In Australia, mining contributes 8.8 per cent to the countryÆs gross domestic product (McKay et al,

    Jan 1, 2003

  • AUSIMM
    Usage of Anionic Dispersants to Reduce the Impact of Clay Particles in Flotation of Copper and Gold at the Telfer Mine

    By G Kluck, N Stoitis, D R. Seaman, R A. Lauten

    The presence of clays, in particular clay slime, may complicate many mining operations. Clay slime particles may possess a negative or positive charge depending upon the pH in the process and their pr

    Oct 29, 2012

  • AUSIMM
    The Practice of Porphyry Copper Deposit Estimation for Grade and Ore-Waste Tonnages Demonstrated by Several Case Studies

    By Dagbert M, Belisle J. M

    Several packages for the estimation of porphyry type deposits exist and produce acceptable results. Recently, however, the need for really trying to obtain maximum information from drill holes has

    Jan 1, 1977

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel Matte

    By Abishev D. N, Balakirev V. F, Davydov G. I

    The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol

    Jan 1, 1996

  • AUSIMM
    Life Cycle Based Water Footprints of Selected Mineral and Metal Processing Routes

    By N Haque, S Northey

    Water in mining, mineral processing and metal production on a life cycle basis has been at the top of agendas for various industries, government agencies, research organisations, academic institutions

    Nov 26, 2013

  • AUSIMM
    Whither Lime? In Situ Hydrotalcite Precipitation as a Method of Remediation for Acidic Mine Lakes

    By G B. Douglas

    Lime-based neutralisation has long been the remediation treatment of choice for acidic mine pit waters. While suited to the attenuation of acidity, lime-based neutralisation may be difficult to implem

    Jul 27, 2015

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • AUSIMM
    Assessment of High Shear Stator Performance at Kanowna Belle Gold Mine

    By S MacKinnon, J Kok

    Potential areas for improvement in flotation performance were identified during JKTech model development surveys in October 2003. Subsequent implementation of the JKTech recommendations in consultatio

    Jan 1, 2006

  • AUSIMM
    Aspects of Comparative Cost Estimation in the Nickel Production Industry

    Estimation of operating costs in the nickel production industry requires a detailed analysis of material flows from mine to smelter to refinery. Despite the small number of nickel producers compared

    Jan 1, 1996

  • AUSIMM
    Geologic and Stable Isotope Evidence for Submarine Diatreme Formation, and Emplacement of the Boyongan and Bayugo Porphyry Copper-Gold Deposits, Philippines

    By E U. Petersen, D R. Cooke

    Hydrogen and oxygen isotopic constraints on hydrothermal fluid composition from the Pliocene Boyongan and Bayugo porphyry copper-gold deposits (southern Philippines ) reveal mixing of magmatic and sea

    Jan 1, 2008

  • AUSIMM
    New sensor development for hydrocyclone overflow particle cumulative percent passing size online monitoring – a preliminary experimental investigation under dry condition

    By L Yang, L Chen, E Hu, D Tang

    Online monitoring of particles cumulative percent passing (PCPP) for a target size at hydrocyclone overflow, compared with traditional offline methods, provides PCPP feedback in real time, and is adva

    Aug 24, 2022

  • AUSIMM
    Technical Data Management at Porgera

    By A G. Shellsh, R J. Henham, J R. Foley

    The Porgera Gold Mine, west of Mt Hagen in PNG is a large open pit and underground operation currently producing gold at the rate of almost one million ounces per year. This deposit has produced some

    Jan 1, 2000

  • AUSIMM
    Thiosulfate Process for Treating Gold Concentrates

    By P Breuer, X Dai, A Bergamin, D Hewitt

    "Copper-ammonia-thiosulfate?leaching of gold has been researched for several decades as a potential alternative to cyanidation. However, this technology has not yet been applied commercially due to ma

    Sep 26, 2013

  • AUSIMM
    Controls on High-Grade Gold Distribution at Vera Nancy Mine

    Determining the controls of high-grade mineralisation at Vera Nancy requires careful data collection and assessment on a global and specific deposit basis. The techniques developed over 60 years ago t

    Jan 1, 2000

  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011