Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Mine Management System at Olympic Dam Mine
The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans
Jan 1, 2000
-
Operations versus Projects - How Do People Think and What are the Implications?
By B Clements, G Lane
The operations and project environments are very different, but overlap in many areas. The development of mineral processing projects is goal oriented, is schedule focused and is a contractual environ
Oct 29, 2012
-
On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance
By D Morgan, K Jones
"In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co
Oct 10, 2016
-
Making Studies Work – Organisation, Communication and Management
By P McCarthy
"This paper is based on 30 years of involvement in feasibility studies as a participant, study manager and the leader of a firm that provides study components and overall study management. The followi
Mar 8, 2016
-
Modelling of a æTrue-Belt SamplerÆ - A New Device for Sampling from a Conveyor Belt
By R Steinhaus, D M. Frantois-Bongarton, P W. Cleary, G K. Robinson, M D. Sinnott
Multotec Process Equipment and Dominique Frantois-Bongarton have a patent for a mineral sampling device, which they call a æTrue-Belt SamplerÆ. This uses a plough, which is rotated about an axis paral
Aug 21, 2012
-
Refining Copper Powder Via a Copper(I)-Ethylene Complex
By Robins R. G
The dissolution of metallic copper powder in aqueous solutions of cupric sulphate under the influence of ethylene gas was investigated. The dissolution reaction stoichiometry obtained was: Cue+(aq
Jan 1, 1987
-
Feasibility Study and Economic Evaluation for Deposit No 3 of Gol-e-Gohar Iron Ore Deposit
By H Dehghan Jan Abadi, K Shahriar
The iron ore district of Gol-e-Gohar (GEG) is located 60 km south-west of the city of Sirjan, in the Kerman Province of the Islamic Republic of Iran. Six exploration targets have been identified and i
Jan 1, 2007
-
On The Occurrence of Platinum at The Thomson River Copper Mine, Victoria, with a Note on The Optical Properties of Braggite
By Hart J. G, Anderson J. S
The presence of platinum metals in the nickeliferous copper ore of the Thomson River Copper Mine near Walhalla, Victoria, was first revealed in 1905 by assays made in the laboratory of the Department
Jan 1, 1942
-
Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting
By B P. Wrench, M J. Gowan, P J. Chapman
Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat
Jul 27, 2015
-
Catalysing lower-carbon mining supply in Australia
By M Rea, E O’Connell
Decarbonising explosives manufacturing and catalysing low-carbon mining supply is a significant global challenge. Low-carbon manufacturing precincts – clusters of geographically close businesses acros
Sep 1, 2024
-
The Paddington Gold Mine Project a Case Study
In 1980 Pancontinental Mining Limited decided that while the Jabiluka uranium project was still a major focus of the company's efforts some diversification was necessary. At this time it was
Jan 1, 1986
-
Olympic Dam Operations Review
The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y
Jan 1, 1998
-
Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury
The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very
Jan 1, 2003
-
Microscale Characterisation of Pristine and Processed Ore - Implications for Leaching Calcrete-Hosted Uranium Ore
By M I. Pownceby, A Torpy, C Johnson, N C. Wilson
To extract uranium from low-grade, calcrete-hosted uranium (CHU) ore is challenging owing to the presence of carbonate and swelling clay gangue minerals that require an alkaline lixiviant to be used.
Sep 29, 2013
-
Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper Mine
By B E. De Gee, N Viviers, A Naidoo
In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio
Sep 1, 2014
-
Comparison of Field Estimated Strengths
By A Duran
When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i
Nov 5, 2014
-
Background Characterisation Study of Naturally Occurring Acid Rock Drainage in the Sangre De Christo Mountains, Taos County, New Mexico
By B Walker, A Robertson, C Wels, S Fortin
A background characterisation study was carried out in the Sangre de Cristo mountains, New Mexico, to: quantify naturally occurring contaminant loads from mineralised areas; define site-specific back
Jan 1, 2003
-
Data analytics and machine learning methods applied to underground coalmine roof convergence data
By I Canbulat, J Emery, L Yao and C Zhang
This paper documents a process of data analytics and machine learning applied to coalmine roof convergence data. It follows a publication documenting the formation of the database. For each set of ana
Nov 29, 2022
-
Iron ore transfer chutes – directions after 30 years of scale modelling
By P Donecker
Like all chains, iron ore values chains are only as strong as their weakest link, which in ore processing is often the humble chute. While mechanically the simplest element in the iron ore flow sheet,
Sep 18, 2023
-
Performance Enhancement at BHP BillitonÆs Newman Beneficiation Plant
By G McSpadden
At September 2001 the beneficiation plant at BHP Billiton Iron OreÆs Mt Whaleback mine is set to treat 9.5 million tonnes per annum (Mtpa) of iron ore, 40 per cent better than original design. This pa
Jan 1, 2002