Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Heap Leaching at Camel Creek Mine

    By Menne D. M, Ladyman R

    Camel Creek Mine operated by Lynch Mining Pty Ltd is located 65 km west of inghain and 160 kin north west of Townsville in North Queensland. (Figure 1). The Camel Creek gold mineralisation was disco

    Jan 1, 1994

  • AUSIMM
    Holistic Management of Sulfides at Rio Tinto Iron Ore's Pilbara Mine Sites

    Rio Tinto Iron Ore (RTIO) manages eleven mines in the Pilbara region, Western Australia. Three of these mines have previously or are currently mining black shale that contains varying amounts of pyrit

    Jan 1, 2009

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • AUSIMM
    Development and Operation of Loy Yang Open Cut

    By Waghorne E. P

    The State Electricity Commission of Victoria is Australia's largest single coal producer. Approximately 19 Mt of coal will be produced in 1989 from the SEC V's newest mine, Loy Yang Open C

    Jan 1, 1989

  • AUSIMM
    Quantifying Geotechnical Risk in the Mine Planning Process

    By T P. Medhurst

    In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi

    Jan 1, 2000

  • AUSIMM
    Development of the 1 in 5.3 Conveyor Decline at Ridgeway Gold Mine

    Located 350 km west of Sydney and 20 km outside Orange, NSW, lies the Ridgeway Gold Mine û NewcrestÆs flagship Underground Gold Mine. Key to success at Ridgeway has been the fast tracked development o

    Jan 1, 2002

  • AUSIMM
    The Effect of Seasonal Variations on the Performance of Mineral Processing Plants – A Case Study of Deposit-10/11A Mine of NMDC Ltd

    By S Das

    Deposit-10/11A is situated in the iron rich Bailadila region of India comprising haematite ore of average grade 65 per cent Fe. The deposit production line was commissioned in the year 2002 having a c

    Jul 11, 2011

  • AUSIMM
    Diversity in Leadership - 'Be Free, in a Unfree World'

    Diversity; what a wonderful topic. Diversity; the condition or quality of being diverse, different, varied to the point that the very word diversity means different things to different people. As on

    Jan 1, 1996

  • AUSIMM
    Slag volume effects on direct-reduced iron (DRI)-based electric furnace steelmaking

    By Q Zhuo, P C. Pistorius, M N. Al-Harbi

    A likely increasingly important pathway for future low-carbon ironmaking and steelmaking is the combination of gas-based direct reduction with electric furnace steelmaking (DRI-EAF route), or with ele

    Aug 21, 2024

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Controlled-potential sulphidization and rougher-cleaner flotation of an oxide-sulphide copper ore

    By Wong KY, Woodcock JT

    Previous results have shown how con- trolled-potential sulphidization (CPS) can give improved metallurgy during rougher flo- tation of mixed oxide-sulphide copper ores. Results in this paper, using

    Jan 1, 1986

  • AUSIMM
    Setting Processing Plant Projects up for Success in Australia

    By R Young

    Independent Project Analysis (IPA) is in the business of benchmarking the performance of capital projects on behalf of owner companies in the processing and extractive industries. IPA assesses between

    Aug 8, 2011

  • AUSIMM
    Integrating Community-Level Indicators of Well-Being into Future Collaborative Mine Planning

    By J Shandro

    This paper stems from recent multidisciplinary research between mining engineering and health researchers at the University of British Columbia and the University of Victoria, Canada. It considers the

    Nov 22, 2011

  • AUSIMM
    Rate of Production and Cutoff Grade-A Program Systems for Teaching and Experimentation

    By Daoust G, Dubois JF

    The optimal sequence of decisions on rates of production and cutoff grades is obtained by a dynamic programming model. The main parameters are : 1. the size of the deposit, average grades and grad

    Jan 1, 1977

  • AUSIMM
    Composite Wear Resistant Materials for Crushing, Grinding, and Screening Abrasive Ores

    By Norman TE

    The design of composite materials for wear resistant service aims at com- bining two or more materials in such a way as to achieve unique and useful properties not generally available in any single

    Jan 1, 1978

  • AUSIMM
    Declining At Mount Windarra Mine With Emphasis On Advancing Through Major Shear Zones

    Declining from surface provides access, haulageway, ventilation and provision for ser- vices for stoping and development. Three boom jumbos and 3.8 m3 capacity diesel loaders are used in decline de

    Jan 1, 1977

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • AUSIMM
    Quantifying economic and environmental impacts of preconcentration

    By E Amini, M Scott

    Grade Engineering® involves the planning, integration and operation of coarse preconcentration techniques to reject uneconomic material as early as possible in the mining value chain to improve the qu

    Nov 10, 2020

  • AUSIMM
    Design and Evaluation of Dry Fill

    By Blair J. R, Barrett J. R

    In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry

    Jan 1, 1973

  • AUSIMM
    An application of Monitoring and Numerical Modelling in Open Stope Mining

    By Thomson I. R R, Friday R. G, Palmer W. T

    The paper introduces the problems encountered in designing open stopes and briefly examines the factors that determine the final stope dimensions achieved after mining is completed. A case study is

    Jan 1, 1981