Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand
By W Newns
This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.
Mar 8, 2011
-
Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine
By F K. R Klose
Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or
Oct 12, 2022
-
Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design
By E C. F Hamman
Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock
Jan 1, 2007
-
Application of RISKGATE to Coal Mine Tailings Dams
By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe
RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan
Jul 16, 2014
-
Enhanced Risk Reduction Using Early Warning Technologies Embedded in Active Explosion Suppression Systems
By J J. L du Plessis, A Spaeth
The objective of this paper is to demonstrate the efficiency of machine-mounted active explosion suppression systems (AESS). Their proven effectiveness against methane explosions is highlighted, as we
Aug 31, 2015
-
Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine
By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell
PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b
Jul 1, 2013
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case study
By P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
Preconcentration in the pit – size matters
By T BoBo, D La Rosa, P Cameron
Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u
Nov 10, 2020
-
Upgrading of Indonesia's Bauxite by Washing Method
Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40
Sep 13, 2010
-
Rehabilitating Post-Mining Landscapes for Wildlife - A Case Study from the Koala Venture Research Program in Central Queensland
By F Carrick, W A. Ellis, D R. Mulligan, S I. FitzGibbon
"One of the major environmental impacts of mining is the destruction of habitat. The koala (Phascolarctos cinereus) is an iconic Australian marsupial that has been severely affected by land clearing a
Jul 10, 2012
-
Risk Assessment Models for Post-Mining Land Use
By C Smith, R I. Maczkowiack, P D. Erskine
Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr
Jul 10, 2012
-
An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mine
By C M. Standen
The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa
Aug 29, 2018
-
Evaluation of sustainability of copper production value chain from ore to metal using advanced simulation
By A Remes, A Dennis, M Talikka, T Kotiranta, S Horn
A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan
Jul 25, 2018
-
Telfer Project Process Plant Design
By R Dunne, G Lane, S Ha, D Dreisinger
The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine
Jan 1, 2003
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context
By E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus
By M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications
By H Yuan, H Tian, Y Zhang, Z Wang, C Wang
Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili
Aug 21, 2024
-
Ni Laterite Mineralogy and Chemistry – A New Approach to Quantification
By M A. Wells
A new approach to more reliably predict the Ni (and Fe, Mg) composition of Ni laterites was tested for RC samples from the (siliceous) oxide–style, Siberia North deposit, Kalgoorlie Nickel Project (KN
Sep 5, 2011
-
Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG
By A Atkins
Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves
May 5, 2022
-
An Integrated Approach to Proactive Tailings Management
By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy
Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta
Jul 27, 2015