Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Coal Bumps And Odd Dynamic Phenomena - A Numerical Investigation (70cea8ce-38a7-4c88-a596-77cf801d31b0)

    By Jeffrey K. Whyatt

    The Crandall Canyon accident investigation included an interesting and unexplained observation by rescuers that the ?barrier rib had shifted northward as a unit, as much as 10 feet.? This is not the

    Jan 1, 2009

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Rockburst Prevention in the German Coal Industry

    By Rudiger Baltz

    The sudden failure of bodies of rock is a serious problem commonly experienced in the international mining industry. These explosive releases of energy are referred-to as ?bumps?, ?outbursts? and ?roc

    Jan 1, 2008

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    The Evaluation of Empirical Coal Pillar Strength Formula Based on Uncertainty Criterion

    By Navid Hosseini

    Several empirical equations to estimate coal pillar strength have been presented in academic studies. The development processes of these equations are similar and are usually obtained by fitting the m

    Jan 1, 2012

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    In-Situ Testing Of Roofex Yielding Rock Bolts In Coal Ribs (d7c8f4cb-6d76-4845-93df-11dd74a1d904)

    By Sean Harvey

    One of the manifestations of the dynamically induced failures in deep coal mines is the violent ejection of coal from the ribs. A possible protection against such failures is the use of a specificall

    Jan 1, 2009

  • SME-ICGCM
    Effects of Specimen Age on the Uniaxial Compressive Strength and Moisture Content of Weak Coal Measure Rocks

    By Timothy Barton

    The uniaxial compressive strength (UCS) is the most fundamental measurement used in geotechnical rock characterization for mine design. While there are standardized procedures for how to conduct UCS

    Jan 1, 2008

  • SME-ICGCM
    Is Mining Coal at a 900M Below Surface at the Xuandong Coal Mine in China Challenging or Just Interesting Rock Mechanics?

    By Wouter Hartman

    Xuandong Coal Mine is mining coal in one of the most challenging underground environments in the world. This work has found that it is not only challenging but it also has the composition for some int

    Jan 1, 2012

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Introduction of Long, High Capacity, Highly Tensioned, Post- Grouted Cable Bolts at BHP Billiton?s San Juan Mine,

    By James Pile

    Long, high capacity, highly tensioned, cable bolts (strand bolts), stiff enough to be installed with resin like a solid bolt, yet flexible enough to be used in any lengths, have been widely used in

    Jan 1, 2007

  • SME-ICGCM
    Analysis Of The Initial Collapse Of The Overburden Over Longwall Panels Using Subsidence Data

    By Gennaro G. Marino

    Documented case histories of surface ground movements from mine subsidence were utilized to help determine when the initial collapse of the overburden occurred above longwall panels. By studying this

    Jan 1, 1988

  • SME-ICGCM
    Improving the Capability for Real Time Assessment of Roof Conditions through Intelligent Roof Bolt Drilling Operations,

    By Robert Anderson

    Advance knowledge of roof conditions can lead to improvement in roof control strategies that will reduce roof falls and ultimately will reduce injuries to mine workers. J.H. Fletcher and Company, in

    Jan 1, 2007

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    The Forensics Of Underground Roof Falls (c5c31282-77d4-44b1-8aa1-d01534eb267d)

    By Steve Tadolini

    Underground roof falls can have devastating effects on the safety of operations personnel, and equipment, and seriously impact production. Immediate steps are usually taken to danger off and secure t

    Jan 1, 2009

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME-ICGCM
    A Casting Method For Artificial Rock Specimens

    By Da Zhao Gu

    An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e. usi

    Jan 1, 1992

  • SME-ICGCM
    A Review of Effective Parameters on Roof Fall During Retreat Mining in Room and Pillar Coal Mines

    By Ebrahim Ghasemi

    Problem statement: One of the most challenging safety problems in room-and-pillar coalmines is controlling roof falls during retreat mining. Roof falls not only cause both fatal and non-fatal injuries

    Jan 1, 2012

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006