Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    AECL's Mine-By Experiment - From Concept To Construction

    The Canadian concept for nuclear fuel waste disposal is being assessed by AECL Research in a series of experiments at its Underground Research Laboratory (URL) near Lac du Bonnet. Manitoba, Canada. As

    Jan 1, 1991

  • SME
    Mechanized Mining of Narrow Veins – Problems and Equipment Options

    By Jacek Paraszczak

    Numerous problems encountered in the mining of narrow vein deposits challenge the productivity, competitiveness and profitability of many mines. Mechanization of mining operations is one of the most i

    Jan 1, 1992

  • SME
    Modeling Metal Ion Removal In Alkylsulfate Ion Flotation Systems (d6f5ac24-85e9-412a-bdb7-096496820a4d)

    By F. M. Doyle

    Metal removal kinetics and metal ion selectivity in ion flotation were studied from a thermodynamic perspective. Surface tension data could be used with the Gibbs adsorption equation to quantitativel

    Jan 1, 2000

  • SME
    Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy Construction

    By Peter J. Tarkoy

    A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and

    Jan 1, 1983

  • SME
    Attendance Up, Attitude Upbeat at Prospectors and Developers Meeting

    By Bruce Gellar

    For the past six years, the author has made it a priority to attend the Prospectors and Developers Association of Canada’s (PDAC) annual conference. This most recent meeting took place March 10-13, 20

    Jan 1, 2002

  • SME
    Hydrothermal Silicification and Alteration of Breccias from Lucky Strike and Menez Gwen hydrothermal fields (Mid-Atlantic Ridge, Azores)

    By I. A. Costa, Y. Fouquet, F. Barriga

    "Lucky Strike and Menez Gwen are two hydrothermally active sites located along the border of the Azorean plateau, southwest of the Azores islands where the alteration processes affecting basaltic rock

    Sep 1, 2014

  • SME
    The Importance Of Geologic And Geotechnical Monitoring For Improving Stability In Deep Two-Seam Longwall Layouts

    By K. Fleck

    Energy West Mining Company (EWMC) has implemented a geologic program for improving stability and support requirements along deep two-entry longwall gateroads at its Deer Creek Mine operations located

    Jan 1, 2012

  • SME
    Building a University and Center For Energy in Sumatra, Indonesia

    By Tony Szwilski

    Indonesia has enormous mineral resources. Its population of more than 180 million people inhabit most of the more than 13,000 islands. The country is becoming a significant economic power in Southeast

    Jan 1, 1991

  • SME
    Pit Slope Design Challenges In Residual Soils And Weathered Rock: Background And A Case Study

    By J. Geyer, B. T. Burton, H. W. Newcomen

    For open pits developed in tropical climates the upper portions of the pit walls are often located in residual soils and weathered rock. Due to the presence of relict structures, and the relatively l

    Jan 1, 2000

  • SME
    Coal Review

    By F. Freme

    Coal production in the United States in 2008 reached a record level of 1.06 Gt (1,171.5 million st), according to preliminary data from the U.S. Energy Information Administration (EIA) (Table 1). This

    Jan 1, 2009

  • SME
    TARP Tunnel Boring Machine Performance Chicago

    By William A. Macaitis, Frank E. Dalton, Leo R. DiVita

    The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil

    Jan 1, 1993

  • SME
    Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74

    By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy

    This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660

    Feb 24, 1997

  • SME
    Excess Spoil Minimization And Fill Stability

    By M. Superfesky, P. Michael

    Introduction The US Office of Surface Mining (OSM) is proposing changes to the Code of Federal Regulations in the interest of minimizing the adverse effects of excess-spoil-fill construction on the

    Jan 1, 2007

  • SME
    Extruded Concrete Lining—The Future Lining Technology for Industrialized Tunnelling

    By Siegmund Babendererde, Jan O. Babendererde

    Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct

    Jan 1, 2001

  • SME
    Oilwell Cementing: What Is Next?

    By A. Mahmoudkhani

    Primary cementing is the process of placing cement in the annulus between the casing and the formations exposed to the wellbore. Portland cement was first used in 1903 in the Lopoc Field in California

    Jan 1, 2012

  • SME
    Invensys’ User Conference Discusses Plant Automation and Control

    By Steve Kral

    Invensys is a London-based supplier of automation and control systems to a variety of manufacturing and processing industries. Through its global subsidiaries, Invensys provides customized, advanced

    Jan 1, 2002

  • SME
    Evaluation Of An Area Dragline Mining Project Using Simulation Models

    By Philip Morey

    Large scale surface coal mining will be required to fill future energy demand in the United States. In realization of this long-term commitment to coal resources, the U.S. Energy Re-search and Develop

    Jan 1, 1978

  • SME
    Importance Of Geotechnical Field Mapping In Assessing The Stability Of Underground Excavations

    By A. Adu-Acheampong

    Stope instability at Ashanti Goldfields Company Ltd. (AGC) is a major concern. Using information from field mapping, major discontinuity sets were defined, Rock Quality Designation (RQD) was determine

    Jan 1, 2003

  • SME
    Engineering Work Leading To A Rock Tunnel Plan

    By Forrest C. Neil, Clint J. Keifer

    The pollution of our water supply, Lake Michigan, is a continuing threat so long as our overflows from combined sewers exist. The problems have become even more acute during recent years, due to the i

    Jan 1, 1997

  • SME
    Practical Consequences Of The Time-Dependency Of Ground Behavior For Tunneling

    By George Anagnostou

    Time-dependent ground behavior may have important implications for the construction process or the life of a tunnel. The paper gives a concise overview of the influence of time on the deformations and

    Jan 1, 2007