Material Handling Techniques To Maximize Silt Participation In The Fuel Blend For A Waste Coal Fired Generating FacilityBy H. R. Thompson
The Grant Town Power Plant is a nominal 80 MW (net) Waste Coal-Fired Electric Generating Plant which is located in northern West Virginia, approximately 15 miles southwest of Morgantown. The Steam Gen
Jan 1, 1996
-
Kinetics Of Pyrite Oxidation In Acidified Ferrous Sulfate Solutions In The Presence Of Oxygen-Sulfur Dioxide Gas MixturesBy J. A. Arias
The oxidation kinetics of pyrite and refractory gold concentrates in acidified ferrous sulfate solutions in the presence of oxygen-sulfur dioxide gas mixtures has been studied. The effect of temperatu
Jan 1, 1993
-
Expert Control System For Semi-Autogenous Grinding CircuitBy J. E. Golsan
Barrick Gold Corporation installed an expert style control system on the grinding circuit at its Mercur mine. Barrick's main objective was to increase mill throughput by a minimum of 3%. The expe
Jan 1, 1998
-
Column Leach Tests For The "El Arco" Copper Ore DepositBy R. Balderrama Neder
A study consist in 20 column leach tests was performed for the "EI Arco" Copper ore deposit, located on Baja California, Mexico. The main purpose was to define the basic criteria like recovery and sul
Jan 1, 1997
-
Bergen And Beyond: Western Norway's Plans For A Tunnel And Bridge NetworkBy Josef Martinsen
This paper describes two-lane dual motorway tunnels under construction in Bergen. The tunnels are part of a by-pass motorway system throuth the most congested area of the city of Bergen. The tunnels a
Jan 1, 1987
-
Reducing Longwall Tailgate Workers' Dust Exposure Utilizing Water-Powered ScrubbersBy John A. Organiscak
The Bureau of Mines evaluated a new dust control technique for longwall personnel required to work at the tailgate end of the face. This technique utilizes a water-powered scrubber to clean a portion
Jan 1, 1983
-
Inclined Pillar Strength Considerations: Review Of Different Methodologies - SME Annual Meeting 2022By R. Flattery, Z. Agioutantis
Coal and rock pillar design is critical not only for mineral extraction but also for the safety of the mine operators. Pillar strength can be estimated through numerous empirical formulas that are ava
Mar 2, 2022
-
Tailings Draindown Estimates – Implementation And Considerations - SME Annual Meeting 2022By N. Rocco, G. Johnson
Implementation of post-closure draindown estimates for tailings facilities are important predictive tools for reclamation planning and often influence jurisdictional bonding. Simplified estimates of d
Mar 2, 2022
-
Transactions Volume 340 2016 - SME Transactions 2016By Chee S. Theng
As the 2016 president of the Society for Mining, Metallurgy & Exploration Inc., I am pleased to present the 2016 issue of the Transactions of the Society for Mining, Metallurgy & Exploration Inc., Vol
Jan 1, 2016
-
Air Leakage and Recirculation Behavior under the Influence of Booster FansBy K. Feledi
"A booster fan is an underground mechanical ventilation equipment installed in series with a main surface fan that is used to boost the air pressure provided by the surface main fan passing through it
Jan 1, 2015
-
Importance Of Geological Data In Planning Underground Ore Extraction ? IntroductionBy C. L. Pillar
In many cases, substantial time may elapse between the exploration stage and a serious detailed planning stage which has the objective of putting a mineral property into production. This is always tru
Jan 1, 1973
-
Standardization Of The Acid Neutralization Potential Acidity Method From ADTI-MMS Through ASTMBy C. H. Bucknam
Acid neutralization titrations were applied to the characterization of soil and overburden for the control and prediction of acid rock drainage in the coal fields of the eastern United States in the 1
Jan 1, 2010
-
Port Inland OperationsBy J. E. Brownhill
This paper does not deal with the typical start-up issues of equipment, production capacity or work force. This is a description of the challenges faced and the changes made by the project team to bri
Jan 1, 1994
-
The Outlook For Zinc And LeadBy I. R. Miller
The purpose of this discussion is to try to offer some suggestions as to how the zinc and lead markets will perform over the balance of the decade, review some of the factors influencing production an
Jan 1, 1992
-
Application Of Interlaboratory Statistics For Carbon And Sulfur To Estimate Uncertainties In Net Carbonate ValuesBy C. H. Bucknam
An interlaboratory testing program was undertaken in support of an ASTM standardization program for simultaneous combustion-infrared analysis for carbon and sulfur in ores and related materials. Stati
Jan 1, 1998
-
Hybrid Physicochemical/Neural-Network Model For Phosphate Column FlotationBy S. Gupta
Froth flotation is a process commonly employed for the selective separation of phosphate from unwanted mineral. Column flotation has become widely accepted in the mineral processing industry, includin
Jan 1, 1998
-
Development, Testing, and Proposed Application of Multiple Passive Source Tracers for Underground Mine Ventilation SystemsBy E. Jong, E. Watkins
"The application of passive tracer gas sources in underground mines is particularly useful for long-term tracer gas studies, as well as for studies in permissible areas of underground coal mines. The
Jan 1, 2017
-
Automated Guidance Systems For Underground Machines: Can They Benefit My Future Project? (40edacbd-2bac-4913-afa9-5d2449b48665)By W. L. Hollinshead
For more effective and cost saving production in tunnels, the machinery used on construction sites will be equipped with guidance systems combined with working procedure management systems. This paper
Jan 1, 1999
-
Fort Cady Borate In Situ Mining ProjectBy G. J. Hartman
A presentation of this project was given previously at the SHE Annual Meeting, Denver Colorado February 23-27, 1987. The project concerns the development of in situ recovery of borate products from a
Jan 1, 1994
-
Variable Speed SAG Mills Motor Capability Vs. Mill Capability (d78975fd-fb93-4679-af35-859b47bc2246)By Derek J. Barratt
The specification of the prime mover of an autogenous/semi-autogenous mill involves an analysis of the likely operating conditions within the mill and the choice of a nominal operating speed. For vari
Jan 1, 1993