  • DFI
    Westlink Projects – Geotechnical Challenges During The Execution Phase

    By Robert Thurner, Albin Norrman, Sami U. Raja

    The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s

    May 1, 2022

  • DFI
    Design Issues for Mini-Caissons in the NYC Area

    By Caciola Jr. Joseph J., Nidal M. AbiSaab

    "Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with

    Jan 1, 2016

  • DFI
    Emergency Stabilization to Maintain CN Rail Service

    By Rick Deschamps

    "Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site

    Jan 1, 2017

  • DFI
    Non-Braced And Non-Anchored Diaphragm Walling In Soft Soil ? Synopsis

    By D. Y. Peng

    A Large Sub-structure with open top of S.Y.P. float line requires a 90m x 50m in plan and 13m-deep excavation in soft soil, Shanghai. The geological conditions in site are rather severe. The technolog

    Jan 1, 2010

  • DFI
    The Deep Cut-Off at the Walter F. George Dam

    "TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow

    Jan 1, 2014

  • DFI
    Engineering Sustainability

    "What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som

    Jan 1, 2009

  • DFI
    Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In Baltimore

    By S. Y. Fantaye

    This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma

    Jan 1, 2008

  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017

  • DFI
    Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and Repairs

    By John P. Turner, Benjamin J. Turner

    "Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda

    Jan 1, 2016

  • DFI
    Temperature, Velocity, Density, And Moisture In Drilled Shafts

    By Khamis Y. Haramy

    Curing temperature, density, and moisture significantly affect the velocity measured in the crosshole sonic logging, the rate of strength gain, and the final strength of concrete in drilled shafts and

    Jan 1, 2007

  • DFI
    Construction Of Deep Foundations By Cast-In - Borehole Method

    By Y. W. Mou

    In order to improve the construction of pile foundations and deep foundations of largo sizes, the paper deals with the method of installing square or rectangular bored-piles for annular foundation as

    Jan 1, 2010

  • DFI
    Deep Excavation And Earth Retaining Structure ? Synopsis

    By S. Y. Zhou

    Excavation with earth retaining is one of the main technological means in deep foundations and underground engineerings. Several construction methods which have been used in China are introduced here

    Jan 1, 2010

  • DFI
    Viscoelastic Finite Element Analysis Of Diaphragm Walls ? Synopsis

    By M. Y. Xia

    In this paper, based on the Theological tests of the interface between clay and concrete, an interface Theological model is proposed and is used in the finite element analysis which takes soil as visc

    Jan 1, 2010

  • DFI
    Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line

    By Benjamin Jennings, Jason Herron

    In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis

    Jan 1, 2017

  • DFI
    Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? Synopsis

    By X. Y. Hou

    The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s

    Jan 1, 2010

  • DFI
    What Shapes Graduates' Skills with Sustainability?

    By Craig M. Shillaber

    On any given day, a simple check of the news will turn up stories related to sustainability, resiliency, climate, or human or natural disaster. In recent years, the winter power grid failure in Texas

    Nov 1, 2022

  • DFI
    Approximate Assessment Of Basement Wall Effects On Foundation Performance

    By Helen S. W. Chow, Harry G. Poulos

    Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl

    Nov 1, 2022

  • DFI
    Design of Pile Foundation for Tall Railway Bridges in North-East India

    By Sumantra Sengupta

    "Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu

    Jan 1, 2015

  • DFI
    Eglinton Crosstown - Over and Under the Existing Subway

    By Shawna Munn, Sarah Speir

    Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission