Installation Of Augered Cast-In-Place Piles - Equipment
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998
By David A. Jack
The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa
Jan 1, 1998
-
Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction
By Juan M. Antorena
A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio
Jan 1, 1995
-
Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity
By Upendra L. Karna
The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor
Jan 1, 2006
-
Predicting The End Bearing Capacity Of Rock Socketed Shafts
By Lianyang Zhang
For optimal design of rock socketed shafts used to support axial loading, it is important to predict the end bearing capacity. The existing empirical methods for determining the end bearing capacity o
Jan 1, 2008
-
World Financial Center Foundations, New York
By G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay Walls
By Dimitris Pachakis
In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th
Jan 1, 2011
-
The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)
By Christian Besson
This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv
Jan 1, 2002
-
Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis
By Charles Pol Vuillier
Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl
Jan 1, 2000
-
Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure
By Damian R. Siebert
Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation
Jan 1, 2011
-
Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method
By Zhang Baoshan
In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed
Jan 1, 1991
-
Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour
By Guo H. Lei
Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro
Jan 1, 2006
-
Biodegradable Hydraulic Fluid in the Deep Foundation Industry - Synopsis
By S. H. Miller
Biodegradable hydraulic fluids can save tens or hundreds of thousands of dollars in fines and clean up costs in the event of a hydraulic fluid leak or spill. When properly selected, applied, maintaine
Jan 1, 2000
-
History Of Chicago Foundation Systems & Underground Construction ? Summary
By Theodore R. Maynard
The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to
Jan 1, 1991
-
Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls
By B. Sivarama Sarma, Biswabikash Rout
"Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes
Jan 1, 2017
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method
By Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
Defective Piles In Clay - Synopsis
By S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996
-
Overview of Design and Practice of SDS Piles in China
By Gang Guo, Zhong Liu, Yi Zhang, Jingchun Lu
"Abstract Application of soil displacement screw pile (known as SDS pile) has been experiencing accelerated growth in Chinese deep foundation industry because of its technical advantages, environmenta
Jan 1, 2014
-
Development Of The Osterberg Load Cell
By Charles L. Guild
I will add a few facts about the use and development of the Osterberg Test Load Cell and my association with Jorj. I first met Jorj in 1965 when the Guild Construction Co. drove 12" diameter cast-in-p
Jan 1, 1989
-
An Approximate Nonlinear Analysis Of Vertically Loaded Piled Rafts In Layered Soils
By Seung-hoon Lee
The use of piled raft foundations has been considered as an economical alternative to conventional piled foundations because a portion of the applied load is carried by the raft in the design of piled
Jan 1, 2008