Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • DFI
    Linking the Installation Response of Screw Piles to Soil Strength and Ultimate Capacity

    By James P. Hambleton, Sam A. Stanier

    A perceived advantage of screw-type foundations is the ability infer aspects of foundation performance from quantities measured or observed during installation, especially the installation torque. A p

    Jan 1, 2019

  • DFI
    3D FEM Modelling of a Ground Improvement Solution

    By Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim

    A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo

    Sep 8, 2021

  • DFI
    Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of Oahu

    By Steve Davidow, Scott Tunison

    As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of

  • DFI
    Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff Wall

    By Gene Bryant, Wesley Schmutzler, Matteo Bertoni

    The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00

    Jan 1, 2019

  • DFI
    Goethals Bridge Replacement Project - Performance-Based Design of the Drilled Shaft Foundations

    By Chunli Wei, Mark Jen, Xiaojun Wang

    "After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge i

    Jan 1, 2016

  • DFI
    Collaborative Value Engineering Redesign - DFI 2020

    By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin

    A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll

  • DFI
    Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven Piles

    By Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell

    The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their

    Sep 8, 2021

  • DFI
    Virtual Imaging Technologies as Decision-Making Tools for Geo- Hazards

    By Arpana P. Sabu, Themis Vaxevanis, Sissy Nikolaou, Guillermo Diaz-Fanas

    Geo-failures from extreme events (landslides, wild fires, earthquakes, floods, etc.) have increased exponentially in recent years around the world and within the USA. When catastrophic failures occur,

    Jan 1, 2019

  • DFI
    Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges

    By Reinaldo J. Villa, Joshua C. Adams

    The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac

    Sep 8, 2021

  • DFI
    Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, Dc

    By Douglas R. Hardin, Stanley L. Worst, Joanna Mason

    A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St

    Oct 1, 2022

  • DFI
    High Capacity Minicaissons In NYC

    By Lawrence F. Johnsen

    Six case histories are presented in which tall, slender high rises are supported on high capacity minicaissons. The recent development of a high strength rebar cage has resulted in compressive loads o

    Jan 1, 2007

  • DFI
    Staged Construction of an Interstate I69 Embankment: Coupled Hydromechanical Numerical Simulation

    By Malek Smadi, Yazen A. Khasawneh

    "New embankments were constructed mostly on soft clays as part of interstate I69 extension in southern Indiana. The embankments serve as bridge abutments and as part of the fill sections along the int

    Jan 1, 2017

  • DFI
    St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge Construction

    By Bryan C. Field

    The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department

    Jan 1, 2009

  • DFI
    Augered Cast-In-Place And Continuous Flight Auger Pile Foundation Systems For US Highway Projects - Why ACIPICFA Pile Foundations?

    By Silas C. Nichols

    FHWA Interest is due to: ? An increase in successful projects in the U.S. private sector and in other countries ? Cost effective and more efficient in many circumstances ? Agency Prioritie

    Jan 1, 2005

  • DFI
    2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure Interaction

    By Yahia M. Al-Smadi

    Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t

    Jan 1, 2010

  • DFI
    Double Rotary Head Piling Systems (Cased CFA)

    By Franz-Werner Gerressen

    In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established

    Jan 1, 2009

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Load Distribution for Underpinning System Using Inherent Rigidity of Concrete Dam

    By Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker

    The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier

    Sep 8, 2021