Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa
GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA
Jan 1, 2001
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis
By Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
-
An Overview Of Soil Mixing In The United States ? Introduction
By Peter J. Nicholson
Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do
Jan 1, 2001
-
Accessories For Driven Piles ? Synopsis
By H. W. Hunt
Accessories are increasingly used to protect and extend H, pipe, precast concrete, timber, and sheet piles for any soils conditions. With point protection, piles can be driven through boulders, layere
Jan 1, 2010
-
Review Of The Methods Used To Construct Large Diameter Bored Piles For Top Down Construction
By J. D. Findlay
The demands on development in London in recent years has led to the increasing use of top down construction methods in which there is a requirement to place steel columns to high tolerances into large
Jan 1, 1989
-
Seal Slab / Steel Pile Interface Bond From Full-Scale Testing
By Gray Mullins
This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen
Jan 1, 2013
-
Building Response To Construction Activities
By Marco D. Boscardin
Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have
Jan 1, 2003
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction
By Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)
By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
I-470 Mine Remediation
By Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
Instrumented Driven Steel Tube Piles At Canary Wharf, London
By A. R. Gaba
Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are
Jan 1, 1989
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:
By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
Experiences With A New Type Of Displacement Screw Pile - Synopsis
By William Van Impe
A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a
Jan 1, 1996
-
Copenhagen – Denmark Cityringen Metro Project: Innovative Solution for Deep Excavation in Complex Urban Areas
By Paolo Cavalcoli, Marco Ziller
"ABSTRACT: In the year 2010 the State of Denmark together with the Municipality of Copenhagen, launched a very important and complex Project : the complete construction of a new double Subway Line :th
Jan 1, 2014
-
Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing
By Gray Mullins
This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p
Jan 1, 2013
-
A Brand New Barrier Wall Installed at Wolf Creek Dam
By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)
By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions
By Lori A. Simpson
Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese
Jan 1, 2006
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge Rehabilitation
By Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006