Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    Circuit Modifications at Westmin Resources Myra Falls Operations

    By C. Veloo

    "Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.

    Jan 1, 1992

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    A Comparison of South African and North American Practices in the Extractive Metallurgy of Gold

    By D. Lindeman, R. M. Nendick

    "From a technologist's point of view, there have been few fundamental 'breakthroughs' in the process of gold extraction since the turn of the century. However, the industry has made a great deal of pr

    Jan 1, 1992

  • CIM
    The Effect of Grinding Media on Flotation Selectivity

    By E. W. Thorton

    "This paper is intended to show that grinding media can effect flotation results, and in some instances the results are vastly different. I do not suggest that autogenous grinding is beneficial in the

    Jan 1, 1973

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    Kiruna mineral processing starts underground — Bulk sorting by LIF

    By Å. Kruukka, H. F. Broicher

    The iron ores of the Kiruna mine in Sweden are of exceptional quality except for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low

    Jan 1, 2002

  • CIM
    Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached Particles

    By David Seaman, J-P Franzidis, Emmy Manlapig

    "A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell

    Jan 1, 2004

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    The Afton Concentrator

    By J. Lovering, M. Allan

    "INTRODUCTIONThe Afton Mines property is located 180 air miles east-northeast of Vancouver and nine miles west of Kamloops, a city of 60,000 people in south central British Columbia. The deposit is lo

    Jan 1, 1979

  • CIM
    Cost-effective Air Separation Plants for the Mining and Mineral industry

    By Goutam H. Shahani

    Today, the mining and mineral sectors are being impacted by highly fluctuating supply ? demand, extreme price volatility and tremendous market uncertainty on a world-wide basis. This pattern is expect

    Nov 1, 2011

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Environmental and Reclamation Measures at Equity Silver Mines Ltd.

    By J. Patterson

    "Acid Mine Drainage (A.M.D.) formed from oxidation of disposed pyritic wastes presents a potential pollution hazard for Equity Silver Mines Limited and the mining industry in general. Failure to colle

    Jan 1, 1988

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • CIM
    Study of Relationship between Pyrochlore Matrix Composition and Surface Chemistry Effects on Collector Adsorption

    By B. Hart, J. Marois

    "Scanning electron microscopy coupled with energy dispersive X-ray spectroscopy (SEM–EDX), and Time of flight secondary ion mass spectroscopy (TOF-SIMS)were used to analyze pyrochlore grains from Niob

    Jan 1, 2013

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    Process Applicaiton Design of Hydrocyclones for Closed-Circuit Grinding

    "Generation and removal of fines are considered in the context of the mill and classifier as a single-unit process in which grinding rates and mechanisms, mill residence time distribution, circulating

    Jan 1, 1984

  • CIM
    The Ecstall Story: The Electrolytic Zinc Plant

    By Edwin G. Sharp, Frank S. Gaunce, George M. Freeman, Denis J. Kemp, Eric Dulson, Paul Salmon, Ernest R. Hamilton, Carl E. Parden

    "THE ECSTALL ZINC PLANT was built for the treatment of the Kidd Creek zinc sulphide concentrates. Construction proceeded throughout 1970-71, with operations beginning in April 1972. The two concentrat

    Jan 1, 1974

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982