Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Mathematical Model for the Prediction of Large Diameter Ball Consumption Rates in Semiautogenous Grinding Applications

    By J. E. Sepulveda, R. Morrow

    "In full scale mineral grinding operations, the steel balls normally utilized as auxiliary grinding media get to be consumed at different specific rates, as determined by 3 basic mechanisms: abrasion/

    Jan 1, 2015

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Sub-aqueous Inpit Deposition of Uranium Tailings at Key Lake

    By Trevor Hamm, Nick Holl

    "Cameco Corporation is operator of the world's richest uranium project, the Key Lake mine/mill complex, located within the Athabasca region of Northern Saskatchewan. Mineable resources from the Key La

    Jan 1, 1998

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Unlocking Value through Flotation Equipment Maintenance

    By P. Tolvanen, A. Jalili

    "When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a

    Jan 1, 2015

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    Mining of the Ming Orebody by the Consolidated Rambler Mines Limited

    By H. Sahay

    This paper summarizes the history and ore-grade statistics of mining the Ming orebody, and then details the mining methods. Included are raising, stoping, drilling and blasting techniques. Particular

    Jan 1, 1979

  • CIM
    In-Plant Hydrogeochemical Mapping: A Tool to Localise Potential Deleterious Reactions Due to Water Quality in a Process

    By Mohamed Ourriban, Stéphanie Somot, Éric Proulx, Jean-Sébastien Marois, Marjolaine Drouin, Paul Blatter, Ahmed Bouajila, Claude Gagnon

    "The mining industry has to face increasing restrictions concerning the use of fresh water in Québec and throughout the world. Increasing recirculated water usage could lead to a better control of the

    Jan 1, 2012

  • CIM
    Grinding media evaluation at Brunswick Mining

    By R. Grant, C. Bazin

    "Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t

    Jan 1, 1994

  • CIM
    Flotation of a Copper-Gold Oxide-Sulphide Ore

    By T. Chong, R. Pesalj, B. Marchant, Z. Nikic

    "The Mount Polley copper/gold project is located in central British Columbia and is currently being developed by Imperial Metals Corporation. Extensive laboratory and pilot plant testing was required

    Jan 1, 1991

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls

    By T. Yeomans

    NVI Mining’s Myra Falls operation is a forty-year-old underground mining operation feeding a 4,000 metric tonnes per day concentrator. The current mill, built in 1985, was designed to process a massiv

    Jan 1, 2009

  • CIM
    Tendencies and Considerations for Energy Efficiency in Sag Mill Circuit Design from Recent Projects in Chile

    By C. Schuffeneger

    "The design of SAG milling circuits for mining projects requires the incorporation of the energy consumption considerations and the evaluation between different flexibility-adding options to absorb th

    Jan 1, 2012

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • CIM
    Improving the performance of shot-saws

    By J. H. Archibald

    "IntroductionShot-saws are used for sawing rock throughout the dimension stone industry especially in granite quarry mills. Shot-saws, as currently designed, have an inherent wear problem which leads

    Jan 1, 1993

  • CIM
    Paste Backfill at the Brunswick Mine

    By Michael Cooper, Eric Konigsmann, A. Moerman

    "A paste backfill plant and underground piping distribution system was commissioned at the Brunswick Mine in June, 1998. Concentrator tailings, composed mainly of pyrite and lesser amounts of silicate

    Jan 1, 1999

  • CIM
    Barrick?s Global Approach to Ground Control Management

    By J. Ran

    Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu

    May 1, 2006

  • CIM
    Making money from wastes: a custom circuit within Clarabelle Mill

    By Alain Bouchard, Germain Labonté, Jim Barrett

    "Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin

    Jan 1, 2002

  • CIM
    Content and Structure of a Plant Grinding Performance Management/Improvement System

    By K. Bartholomew

    The Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant processing performance impr

    Jan 1, 2015

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • CIM
    The Wabush Mines Concentrator

    By Timothy R. Eby

    "The Wabush Mines project was formed in 1956 to develop a large iron ore property in Western Labrador. The town of Wabush along with the mining and concentrating facilities are located 640 air miles f

    Jan 1, 1978