Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Development of Pyritic Smelting: An Outline of its History

    There is a well-known saying, variously attributed to the great King Solomon and other sages of antiquity, to the effect that 'there is nothing new under the sun'. The inventive genius of ma

    Jan 1, 1994

  • AUSIMM
    Rolling Mills finishing Processes Analysis

    By Atalla YM

    Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)

    Jan 1, 1975

  • AUSIMM
    Non-renewable Energy Resources of Queensland

    The non-renewable energy resources of Queensland comprise coal, petroleum (oil and gas), oil shale and uranium. Coal is widely distributed., and has been developed extensively both for export and f

    Jan 1, 1979

  • AUSIMM
    Dampier Port Upgrade Project - An Overview of Engineering, Procurement and Construction Management Project Management

    By A Radici, S Russell

    The Dampier Port Upgrade was completed in 2007 and is the largest project in Rio Tinto Iron Ore's expansion program. The project doubled Dampier Port's iron ore shipping capacity over a five

    Jan 1, 2009

  • AUSIMM
    Subduction of Oceanic Plate -Its Realities- Summary of French-Japanese Cooperative "Kaiko" Project

    Brief summary of results obtained by a French-Japanese cooperative study on the bottom of trenches around Japan. The geophysical prospection, multi beam echo sounding and direct observation with s

    Jan 1, 1987

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    Environmental Rheology and the Mining Industry (Mine Fill 98')

    By DV Boger

    Rheology is the science which deals with the deformation and flow of matter. Thus nccology is concerned with the flow of any material. The mining industry is concerned with digging things out of the

    Jan 1, 1998

  • AUSIMM
    The Extraction of Nickel from Laterites by High Temperature Reactions with Glycerol

    A recently discovered high temperature (22G-2800°C) reaction between glycerol and the oxides and hydrous oxides of iron produces a green, well-crystalline complex glycerato-iron, whereas hydrous

    Jan 1, 1971

  • AUSIMM
    Crisis Situations in Coal Mine Ventilation

    Underground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el

    Jan 1, 1983

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018

  • AUSIMM
    Managing Mine Closure Risks in Developing Communities ù A Case Study, Kelian Equatorial Mining, Indonesia

    The Kelian gold mine which was developed in East Kalimantan Indonesia in 1990 - 1992 is scheduled to complete mining and processing operations in 2004. This will have a major impact on the neighbourin

    Jan 1, 2003

  • AUSIMM
    Geology and Ore Genesis of Silver-Lead-Zinc-Copper Sulphide Deposits, Sunny Corner, NSW

    By Offler R, Lau J, Lea J. F

    The stratiform and vein-type pyritic silver-Iead-zinc-copper sulphide deposits of Sunny Corner, NSW are hosted by acid volcanic and clastic sedimentary rocks of Middle Silurian to Early Devonian age.

    Jan 1, 1984

  • AUSIMM
    Design of Yield Pillars for Improved Stability of Colliery Roadways

    By Bhattacharyya A. K

    A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction

    Jan 1, 1995

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    The Steelmaker's Contribution to Shipbuilding

    The object of this paper is to give an insight into various metallurgical operations involved in the making and shaping of steel for shipbuilding at the Newcastle plants of the Broken Hill Proprietary

    Jan 1, 1951

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011