Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Ores of the Golden Mile, Kalgoorlie: Coherent Metallurgical Testwork from Comminution, through Flotation, Roasting and Leaching, to Mineralogical Determination of Key Mineral Deportments using QEM*SEMBy J J. Campbell, G J. Wilkie
The ores of the Golden Mile exhibit considerable complexity. As a consequence, the operating company, Kalgoorlie Consolidated Gold Mines (KCGM), considered it important to develop a coherent database
Jan 1, 1998
-
The critical pool levels for the Yallourn Mine determined using the MGRIBy J Butler, N Patel, S Narendranathan, S Rastogi
The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o
Aug 2, 2023
-
The experimental study on propagation of pressure wave in underground mine ventilation systemBy Y Shougu
Many mine accidents will affect the mine ventilation system when they occur. At present, there is a lack of monitoring means to capture the occurrence of accidents in time by monitoring the ventilatio
Oct 12, 2022
-
Planning and Developing a New Mine in the Old Stawell GoldfieldThe history of potential large scale development at Stawell in northwestern Victoria dates back to 1914, when Great Boulder Mines Limited, of Kalgoorlie, Western Australia, took up options on some of
Jan 1, 1984
-
Notes on the Delayed Method of Stope Filling at Mount Isa Mines LimitedIntroduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass De
Jan 1, 1953
-
Carrapateena Crusher Station One – Optimisation and excavationBy A Mooney, G Balog, P Burns, R Brooks
This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as
Mar 15, 2021
-
Application of Block Caving System in the Tongkuangyu Copper MineBy Song Yongxue
During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a
Jan 1, 2000
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver OperationBy P Stewart, S Cowie, A Offer, J Carpenter, E Jones
The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A
Nov 21, 2018
-
Australia’s hydrogen export in the form of embedded mineral derivativesBy R Daiyan, G Burge, M Haider Ali Khan
Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary
Sep 1, 2024
-
Performance and Acceptance Testing of Mine Refrigeration PlantsThere is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati
Jan 1, 2005
-
Potential of the Overburden Cast Blasting Technique in Indian Surface Coalmines – A Modular Approach and its Financial ImplicationsBy M D. Uttarwar, R R. Yerpude
India is the world’s third-largest producer of coal and is endowed with the fifth-largest coal reserves in the world. Surface mining straddles the entire domain of the Indian coal mining industry, yie
Aug 24, 2015
-
Effect of Vibration Sensor Mounting Method on the Quality of Vibration MeasurementsBy R Castedo, P Segarra, I del Castillo, L M. López, J A. Sanchidrián
This work investigates some suggested methods for blast vibration monitoring on a hard surface based on 53 tests on a vibration exciter. Errors in the measurement attributable to coupling have been de
Aug 24, 2015
-
Concept Design of the Central Business District Rail Link, AucklandBy J Q. Cooper
The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing
Mar 8, 2011
-
Clean Energy and Mining – Future SynergiesBy R Memary
The environmental and economic impacts of a significant dependence on fossil fuels are affecting the future of sectors such as of mining. These impacts are prompting the Australian Government to seek
Nov 22, 2011
-
Geometallurgy – Bridging the Gap between Mine and Mill: a Case Study of the DeGrussa Geometallurgy ProgramBy S Robinson, A Turner, R Dale, C Butler
"Sandfire Resources NL- (‘Sandfire’) DeGrussa definitive feasibility study (DFS) identified geometallurgy as a major factor in achieving optimum plant performance at the DeGrussa mine. A geometallurgi
Jun 15, 2016
-
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel CaveBy A Coelho, D Bruce, H Grosser, C Parken, M Xia
Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank
Mar 15, 2021
-
Conclusions from long-term cover system performance monitoring – a case studyBy R Barritt
Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was
Jul 25, 2018
-
Diversion decision making with an integrated approach to design for operations and mine closureBy M Rafty, A Markham, S Atkinson
Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete
Jul 25, 2018