Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Silicone Vapor Poisoning of Catalytic Methane SensorsBy L. J. E. Hofer, J. L. Snyder, J. N. Barn, J. E. Chilton, W. E. Thomas
Various silicone materials have been proposed for use in mining environments. The catalytic methane sensors now employed are poisoned by silicone vapors. Activated charcoal and carbon cloth adsorbents
-
Biological Sulphide Production for Process and Environmental ApplicationsBy Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil
"The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be
Jan 1, 2006
-
A Measurement Method for Determining Absorption Coefficients for Underground MinesBy Gregory P. Cole, Peter G. Kovalchika, Rudy J. Matetic, Adam K. Smith
Previous studies conducted by the National Institute for Occupational Safety and Health (NIOSH) have shown that approximately 90% of coal miners and 49% of metal/nonmetal miners had a hearing impair
-
Hourly Ownership and Operating Cost Projection - Rubber Tyred LoadersUnderground equipment owners and users in order to compete and succeed in being viable business propositions must continually balance costs with productivity. By reducing their hourly ownership, ope
Jan 1, 1990
-
IC 7096 Open-Pit Mining And Milling Methods And Costs At The Yellow Aster Mine, Randsburg, Calif. ? IntroductionBy A. W. Frolli
This paper, describing the open-cut mining milling, and cyaniding methods and costs at the Yellow Aster gold mine, is one of a series being prepared by the Bureau of Mines on similar practices in the
Jan 1, 1940
-
An Assessment of Radioactivity Hazards at a Proposed Heavy Mineral Sand Mining SiteBy N E. Whitehead
An application to mine an ilmenite-rich sand deposit in Westland led to public concern about potential radioactive hazards should the ore be further processed to recover zircon or monazite. A review r
Jan 1, 1993
-
OFR-131-83 Safety And Health In Underground Mine Waste DisposalBy J. P. Schmid
Results of a comprehensive investigation of the impact of underground mine waste disposal on the health and safety of miners are presented. Information was gathered through an extensive search of Amer
Jan 1, 1982
-
Rock and Coal Type Distribution in the Greymouth Area: Applications for MiningThe Main Seam occurs in two 'pods', termed North and South, separated by an east-west oriented 'want' zone (most probably a palaeo-channel). The seam on either side of the 'wa
Jan 1, 1996
-
Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and ControlsBy E. T. C. Spooner, Ioannou S. E.
"Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi
Jan 1, 2000
-
Peak particle velocity prediction using support vector machines: a surface blasting case studyBy S. R. Dindarloo
Although blasting is one of the most widely used methods for rock fragmentation, it has a major disadvantage in that it causes adjacent ground vibrations. Excessive ground vibrations can cause a wide
Jan 1, 2015
-
Stability of large rock caverns excavated in a highly stressed regionBy Y. -J. Park, K. -H. You, Y. -T. Choi, Lee. H. -W.
Many large caverns are being constructed in great depths in Korea mainly for the storage of oil and LPG. These caverns are mostly located near the port where rock conditions are reasonably good. In so
Jan 1, 2003
-
Semi-Autogenous Grinding Circuit Reduces Capital CostsBy H. C. Counsell, R. Webber
"The mill at Denison Mines' Elliot Lake Operations started up in 1957, with a capacity of 6,000 tons per day. Over the years various plant modifications expanded th.is to 7 500 tons per day. In 1976,
Jan 1, 1984
-
RI 8547 A Mixed Kinetics Dump Leaching Model for Ores Containing a Variety of Copper Sulfide MineralsBy B. W. Madsen
To help maintain an adequate supply of minerals to meet national economic and strategic needs, the Bureau of Mines developed a mathematical model that describes acidic ferric sulfate leaching of coppe
Jan 1, 1981
-
RI 2585 Mining Limestone For Lime ManufactureBy Oliver Bowles
"Underground operation.In its broader sense the term ""mining"" is applied to all processes whereby raw materials are taken from the earth to be used as sources of mineral products. In a more restrict
Mar 1, 1924
-
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal MinesBy A. Wahab Khair
Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-
Jan 1, 2008
-
Dynamic Stress Field around a Blast Hole – A Laboratory StudyBy R. Raghavaraju
Estimation of the dynamic stress field in terms of its amplitude and decay around a blast hole is a key input parameter in all numerical modeling and blast prediction exercises. However, there is very
Jan 1, 2014
-
On The Development Of Bainitic Alloys For Railway Wheel Applications - SynopsisBy A. Kapito
The ferrite-pearlite microstructure is the most popular microstructure for alloys used in structural applications, including railway wagon wheels. These alloys have been designed through alloying and
Jan 1, 2012
-
Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay DetonatorsBy H. Möhle
Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode
Jan 1, 2000
-
Underground Milling of Uranium OresBy Chuck Edwards
"Cameco operates the high-grade McArthur River uranium mine in northern Saskatchewan, and is constructing the high-grade Cigar Lake uranium mine. Cameco has studied the concept of underground milling
Jan 1, 2007