Search Documents

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • SAIMM
    The Centenary Of The Discovery Of Platinum In The Bushveld Complex (10th November, 1906)

    By R. G. Cawthorn

    The earliest authenticated scientific report of the occurrence of platinum in rocks from the Bushveld Complex appears to be by William Bettel on 10th November 1906. Thereafter, prospecting of the chro

    Jan 1, 2006

  • NIOSH
    IC 8819 Analytical Chemistry Of The Citrate Process For Flue Gas Desulfurization

    By W. N. Marchant

    [The citrate process for flue gas desulfurization (FGD) is a product of continuing research by the U.S. Bureau of Mines to meet the goal of minimizing the objectionable effects of minerals industry op

    Jan 1, 1980

  • CIM
    Development of a Process for the Treatment of Electric Arc Furnace Dust and Other Urban Mining Wastes

    By T. Hofbauer, M. J. Dry, G. B. Harris, C. W. White

    "Urban Mining is a term that is increasingly being used, and represents an appreciable source of secondary materials for the metals extraction industry, a source that does not incur mining costs, but

    Jan 1, 2014

  • SAIMM
    Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South Africa

    By Hornsey R., P. van der Merwe

    The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r

    Jan 1, 2003

  • NIOSH
    RI 3603 Subsurface Disposal Of Oil-Field Brines In Oklahoma ? Introduction

    By Sam S. Taylor

    Subsurface disposal of oil-field brines was practiced in Oklahoma on a limited scale as early as 1925. The technique of subsurface injection has been improved immensely and has been applied with varyi

    Jan 1, 1942

  • NIOSH
    OFR-4(2)-72 Industrial Engineering Study Of Hazards Associated With Underground Coal Mine Production - Volume II - Data And Charts ? I. Introduction

    Presented in this volume are the basic mining techniques and production operations associated with underground bituminous coal mining. Chapter 2, "Multiflow Process Charts", presents, in sketch fo

    Jan 1, 1971

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • CIM
    Iron Behavior in Nickel Laterite Inverse Leaching Process

    By L. Su, S. Liu, K. Jiang, K. Xie

    The reduction of iron dissolution and acid consumption is fairly important in the extraction of Ni and Co from laterite ores from both economic and efficiency perspectives. BGRIMM conducted detailed r

    Jan 1, 2016

  • NIOSH
    IC 8073 The Pacific Northwest Steel Industry ? Summary

    By Gary A. Kingston

    Rolled steel, steel forgings, and steel castings in the Pacific Northwest (Washington and Oregon) are produced principally in the Seattle, Wash., and Portland, Oreg., metropolitan areas. Steel-mill pr

    Jan 1, 1962

  • IMPC
    A Techno-Economic Comparison Of Pyrometallurgical And Hydrometallurgical Options For Treating High-Arsenic Copper Concentrates

    As the high-grade copper deposits in the world become depleted, there is an increasing focus on developing lower-grade ores which contain problematic impurities such as arsenic. Indeed, many high-arse

    Sep 1, 2012

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • AUSIMM
    A Modified Laboratory Concentrating Table

    Small scale' table concentration tests have many critics. Many metallurgists consider that such tests are of problematical value because of the difficulties involved in conducting and interpretin

    Jan 1, 1954

  • SME
    Pre-Implementation Evaluation of VR as a Mine Safety Training Tool - SME Annual Meeting 2025

    By CASSANDRA L. HOEBBEL, Jennica L. Bellanca

    High-fidelity, immersive training is known for its learning and logistical benefits. While other industries have used virtual reality (VR) for decades, the same uptake has not been seen in mining. NIO

    Feb 1, 2025

  • NIOSH
    MLA 87-83 - Mines And Prospects In The Seafoam Mining District, Custer County, Idaho ? Summary

    By Nathan T. Lowe

    This report updates an accounting of mines and prospects in the Seafoam mining district, Custer County, Idaho, begun during mineral appraisal of the Idaho Primitive Area. Thirty-two mine and prospect

    Jan 1, 1983

  • ISEE
    Wall Control Blasting Practices at Kisladag Gold Mine

    By Ekin Güngor, Berkant Ozdemir, Erkan Bayrak, Serdar Ergün, Sedat Esen

    "This paper presents the final wall blasting practices at Eldorado Kisladag Gold Mine in Turkey. Benchmark and improved wall control designs were explained in detail. Kisladag Mine has been implementi

    Jan 1, 2017

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,

    Jan 1, 1982

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • NIOSH
    OFR-7-74 Applicability Of Speech Bandwidth Compression Techniques In Mine Electromagnetic Communications

    By C. H. Manney

    This report deals with the feasibility of the use of vocoders as an integral part of a mine electromagnetic voice communication system. Limitations imposed by the nature of the transmission path, back

    Jan 1, 1972

  • CIM
    The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho Deposit

    By Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl

    The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b

    Jan 1, 2014