Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Numerical Analysis of Some Geotechnical Factors Influencing the Application of Longwall Top Coal CavingBy Dao Hong Quang
This paper describes the numerical analysis of some geotechnical factors influencing the application of Longwall Top Coal Caving (LTCC) method. The study was aimed at comparing the differences in stre
Jan 1, 2008
-
Plan compliance process for underground coal mines - SynopsisBy A. A. Angelov
This paper presents a unique method of monitoring the effectiveness of the planning process as well as the execution of mine plans. The method primarily determines the degree of deviation from the ori
Jan 1, 2010
-
Recent Developments in the TBM Industry—New and Innovative TechnologiesBy Martin Herrenknecht, Karin Bäppler
The last five years have seen a remarkable increase in tunnelling projects in both soft ground and hard rock applications. Part of the increase is a result of recent Research & Development efforts to
Jan 1, 2005
-
Large Diameter Machine Bored Piles In AustraliaBy W. J. Kingwell
Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of
Jan 1, 1989
-
Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case HistoryBy John Ellenberger
The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a
Jan 1, 2012
-
Smelting Practice at Mount MorganBy Hennessy F. L
IntroductionEvolution of the Present SmelterRoastingFiringHearth SlopeDust HandlingFurnace DetailsSmeltingFurnaceFeed DeliveryPulverised Coal FiringWaste Heat BoilersDust HandlingAir PreheaterReverber
Jan 1, 1952
-
SAG Mill Pilot Testing Of A High-Clay Silver Ore At Gumuskoy, TurkeyBy A. C. T. Bigg, Y. Kocak, N. K. Bodur
The Gumuskoy silver mine, owned by the Etibank, in the province of Kutahya, Turkey, has been operating since 1987 with primary, secondary and tertiary crushers, and two parallel single stage ball mill
Jan 1, 2000
-
IC 8846 Pumped-Slurry Backfilling Of Abandoned Coal Mine Workings For Subsidence Control At Rock Springs, Wyo. - With An Appen On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, U.S. Bureau Of Reclamation, Denver. Colo.By G. J. Colaizzi
The Bureau of Mines, at the request of local authorities in Rock Springs, Wyo., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling
Jan 1, 1980
-
RI 3480 Progress Reports - Metallurgical Division - 34. Annual Report Of The Metallurgical Division, Fiscal Year 1939 ? Introduction (f8adc79d-0782-459e-ad3a-6ff2d4c4a06e)By R. S. Dean
[During t!~c past f isc.~l y~:-.r the Xetzllvz-gicd 3ivi oion has made im- portant contribution-, don,- tlie lines rlictnteil by the Bureau policy of con- servation of domestic rnker~l rcsoul-ces thro
Jan 1, 1940
-
RI 3480 Progress Reports - Metallurgical Division - 34. Annual Report Of The Metallurgical Division, Fiscal Year 1939 ? IntroductionBy R. S. Dean
[During the past fiscal year the Metallurgical Division has made important contributions along the lines dictated by the Bureau policy of conservation of domestic mineral resources through Its inve
Jan 1, 1940
-
Developments Of Mechanized Technologies For Low Seam Height Mining In PlatinumBy P. Bracher
Most efforts to mechanize low seam (narrow reef) mining of platinum ore are presently based on board-and-pillar methods with1.6?1.8 m in reef excavation. This paper attempts to substantiate the benefi
Jan 1, 2003
-
Waste dump management at Quintette Coal LimitedBy W. P. Tassie
"The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors
Jan 1, 1988
-
Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and ConstructionBy F. B. Samani, B. Stabel
The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the
Jan 1, 2003
-
Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow ConditionsBy Adam Shang Robert Fu
The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately
Jan 1, 2007
-
Reprocessing of a French Guyana Operation Tailings Using Flotation for Gold ConcentrationBy P. Botane, A. Cailleau
"Compagnie Miniere Esperance operates a gold primary ore body. The ore is processed through crushing, grinding and gravity concentration generating tailings with remaining fine gold. Analyses of the t
Jan 1, 2009
-
Laser-MIG Hybrid Welding of Maraging SteelBy K. V. Phani Prabhakar, G. Padmanabham1, L. Subashini
Laser-arc Hybrid Welding (LAHW) is a relatively recent concept which effectively combines the advantages of laser welding such as the high depth of penetration, low heat input, high welding speed and
Jan 1, 2014
-
Online Elemental Analysis of Slurry Using Laser-Induced Breakdown SpectroscopyBy Tano Balbin, Valery Astakhov, Juha Timperi, Lauri Koresaar
"Online elemental analysis is the basis of optimal flotation control in mineral concentrator plants. Traditionally XRF analyzers have been used as the online analysis method. However, online XRF analy
Jan 1, 2017
-
History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982By Hal W. Hunt
Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng
Jan 1, 1984
-
Automated Installation Monitoring For Augercast And Driven PilesBy Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
Geophysical Signatures of Andesite Volcanoes in New Zealand - Contrasts and Structural ImplicationsBy C A. Locke
Geophysical signatures of the Taranaki and Tongariro volcanoes reflect similarities in their age, composition and hydrothermal histories, but also reflect differences in host rock settings and edifice
Jan 1, 1995