Search Documents

  • NIOSH
    Assessment And Evaluation Of Noise Controls On Roof Bolting Equipment And A Method For Predicting Sound Pressure Levels In Underground Coal Mining

    By Rudy J. Matetic

    Over-exposure to noise remains a widespread and serious health hazard in the U.S. mining industries despite 25 years of regulation. Every day, 80% of the nation’s miners go to work in an environment

    Jan 1, 2006

  • CIM
    150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration

    By H. J. McQueen

    ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA

    May 1, 2011

  • DFI
    A Tale of Two Dams: Performance of Deep Cutoff Walls

    By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders

    "This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv

    Jan 1, 2017

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • SME
    The Fallacy of Tunnel Formwork Removal

    By Wern-ping (Nick) Chen

    In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t

    Jan 1, 2008

  • NIOSH
    The Introduction Of Roof Bolting To U.S. Underground Coal Mines (1948-1960): A Cautionary Tale

    By Christopher Mark

    Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940’s and 1950’s. From an engineering standpoint, ro

  • NIOSH
    RI 3110 A Study of Falls of Roof and Coal in Mines of Harrison County, West Virginia

    By J. W. Paul, J. N. Geyer

    "GENERAL STATEMENTThe purpose of this report, which is the first of a series of three covering mines in the Fairmont district of West Virginia, is to give the result of a' study conducted in seal mine

    Aug 1, 1931

  • AUSIMM
    The Rosia Montana Gold Deposit, Rosia Montana, Transylvania, Romania

    By C S. Szentesy, K Howie

    The Rosia Montana gold deposit is located within the æGolden QuadrilateralÆ area in the Apuseni Mountains of Transylvania, Romania. The deposit is situated approximately 85 kilometres north of the reg

    Jan 1, 2002

  • NIOSH
    RI 3039 The Trauzel Block Strength of Dynomite

    By G. St. J. Perrott, N. A. Tolch

    "The measured strength of an explosive depends to a certain extent on which it is determined. An earlier investigation showed the relative propulsive strength of dynamites as determined in one type of

    Oct 1, 1930

  • SAIMM
    Mine Safety Net Development And Applications - Synopsis

    By N. M. Skarbøvig

    Safety nets have been used selectively in several South African mines over the years. Recently, however, an increased emphasis on mine safety has seen a resurgence of their utilization underground. Th

    Jan 1, 2011

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • DFI
    The Realities Of Foundation Engineering ? Synopsis

    By J. O. Osterberg

    The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present

    Jan 1, 2010

  • IOM3
    The only way is up

    By G. Richards

    Research shows that having more women in the top mining jobs can bring bottom-line benefits. Mining companies are starting to embrace the need for greater gender diversity at board and senior manageme

    Jul 1, 2015

  • AIME
    Manufacture of Sterling Silver and Some of Its Physical Properties (b208582d-6f54-4d6a-9622-6e9f80eb3066)

    By Robert Leach

    THIS paper gives a brief summary of the process of manufacture of sterling silver, and some of its more important physical properties, as observed in commercial production of rolled sheet and wire. Al

    Jan 1, 1928

  • AUSIMM
    Tackling the Gorillas - Hairy Scary Complacency to Safety in Mining or a Banana Packer's Story

    Shane is enjoying his new work. Six months ago, he was stocking shelves at his local supermarket and decided to make the big move to a job in mining with more challenge and, of course, more dollars. H

    Jun 1, 2010

  • SAIMM
    Life-Of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine (f7fec8ba-f444-4056-8367-98da9f297180)

    Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate i

    Jan 1, 2014

  • CIM
    The Development and Commissioning of Ontario’s First Diamond Mine: Victor Diamond Mine

    By N. Morrison, I. Holl, R. Welyhorsky, A. Hempstock

    ABSTRACT: The Victor diamond mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario. The process

    Jan 1, 2011

  • SAIMM
    Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro Matoso

    By T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza

    The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s

    Jan 1, 2004

  • ISEE
    What a Gas: Blasting Under Pressure

    By Jerry Wallace

    This project consisted of blasting for expansion of a major interstate natural gas transmission pipeline pump station. The pump station handled 400-500 million cubic feet (1 l- 14 million cubic meter

    Jan 1, 1996

  • IOM3
    Computer-aided instruction in mine automation

    By M. J. Scoble, L. M. Daneshmend, C. Hendricks

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993. An attempt is made to relate emerging technologies to education and training req

    Apr 1, 1994