Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of Visualization Tools for Drill and Blast ActivitiesBy Carlos Alvarado, Hernan Narea, Jhon Silva, Bryan Townsend, Katherine Gil, Brayan Caceres, Felipe Pontanilla
With the promising development of new technologies, automation in Drill and Blasting (D&B) is on the horizon. The data generated in all D&B activities, which is currently segregated, can be linked to
Jan 21, 2025
-
Multivariate Scaling Approach for Laboratory Scaled Rock BlastingBy Dr. Kyle Perry, Ryan Sibley
Rock blasting is an inherently difficult field to quantify independent & dependent variables and the specifics of how the energy interacts with the material for a number of reasons. Independent variab
Jan 21, 2025
-
Implementation of a Remote Blasting Engineering Center in PeruBy Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado
In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th
Jan 21, 2025
-
A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper MineBy Stephen Mansfield, Nathan West, El Khalil Seyed
In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted
Jan 21, 2025
-
Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy
Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush
Jan 21, 2025
-
Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case StudyBy Jose Pineda, Abraham Lindo
The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio
Jan 21, 2025
-
The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive groundBy Alastair Torrance, Gary Cavanough
Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide
Jan 21, 2025
-
Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno NobelBy Tacio Ferreira
A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla
Jan 21, 2025
-
Hydrogen Peroxide Emulsion (HPE) – A Journey from Concept to RealityBy D. Scott Scovira, Thomas Gustavsson
The potential of hydrogen peroxide explosives was introduced to Thomas Gustavsson and Robert Håkland by Dr Miguel Araos through his development of hydrogen peroxide gel compositions (HPG). In 2020, Th
Jan 21, 2025
-
The Improvement in Fragmentation of the Hardest Jaspilite LithologyBy Carlos Campos Junior, Leonardo Soares Chaves, Raul Carretero Hoz, Renato Jacome Costa, Davi Bastos Martins de Oliveira
The Vale’s Serra Sul mine, also known as S11D project, is one of the world’s largest open pit iron ore mines, located in Brazil’s Amazon region. The mine produces around 90 Mt of high-quality iron ore
Jan 21, 2025
-
Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential StructureBy Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern
A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m
Jan 21, 2025
-
Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye
The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial
Jan 21, 2025
-
Identification of structures capable of hosting the ML 5.5 Orkney South Africa earthquake and factors controlling the physics and mechanics of dynamic ruptureBy R. J. Durrheim, Y. Yabe, M. S. D. Manzi, DSeis team, N. Z. Nkosi, S. B. Mngadi, Jr. H. Ogasawara
On 5 August 2014, the Orkney M5.5 earthquake, the largest in South African gold mining districts, occurred with an unusual strike-slip mechanism at great depth of 4.78 km below the surface. In a rare
Jan 12, 2025
-
Advanced seismic acquisition techniques in South African mines: Insights from the FUTURE projectBy I. James, R. J. Durrheim, M. S. D. Manzi, O. Valeshin, J. Lepine, L. V. Socco, C. Colombero, A. Malehmir, M. K. Rapetsoa, M. Sihoyiya
The FUTURE project aims to enhance seismic surveying in South African mining by integrating advanced acquisition technologies. In this paper, we detail surface and underground seismic surveys at the S
Jan 12, 2025
-
Influence of ground motion model selection on seismic hazard for JohannesburgBy R. J. Durrheim, B. Manzunzu, V. Midzi
Selecting ground motion prediction models (GMPM) is crucial in assessing seismic hazard levels in a specific region. This study investigates the influence of ground motion model (GMM) selection on sei
Jan 12, 2025
-
Using 3D numerical simulations to model active in-mine seismic surveys at South Deep Gold Mine, South AfricaBy S. Plaatjie, L. Linzer, M. S. D. Manzi, M. Sihoyiya
Fiber-Optic Sensing and UAV-Platform Techniques for Innovative Mineral Exploration (FUTURE) is a joint European Union and South African consortium project funded under ERA-NET Cofund ERA-MIN3. The pro
Jan 12, 2025
-
Automatic data selection, worker exclusion zones and an attempt to identify precursory activity in real time: Routine and research activities in seismology at Sibanye-Stillwater LtdBy P. Lenegan, R. Masethe, R. I. L. Ferreira
Underground mining in high rock-stress environments can induce unanticipated dynamic rockmass deformation, posing a serious risk to the workforce. Data collected by seismic networks are imperative for
Jan 12, 2025
-
Macroseismic survey of the ML 4.4, 11 June 2023 Boksburg earthquakeBy T. Matlou, S. Myendeki, V. Midzi, T. Zulu, H. Mabotja, T. Mulabisana, B. S. Zulu, L. Hlatshwayo, T. Makhateng
The Council for Geoscience (CGS) performed a macroseismic investigation following the occurrence of an earthquake in the Boksburg area on 11 June 2023. The event had a magnitude of ML 4.4 and a focal
Jan 12, 2025
-
Seismicity evolution and rockburst control in the Merensky Reef and UG2 orebody: An intermediate depth platinum mine case studyBy S. Durapraj, R. T. Masethe, U. Maqina, A. C. Adoko
This study investigates seismicity and rockburst control within the Merensky Reef and UG2 orebody of an intermediate-depth platinum mine located in South Africa's Bushveld Complex. Utilising a mine-wi
Jan 12, 2025
-
High-Pressure Slurry Ablation (HPSA): Review of Findings, Potential Applications, and Future DevelopmentsBy Tim Lundquist
Disa Technologies Inc. provides innovative, sustainable solutions for mineral processing and remediation through its patented High-Pressure Slurry Ablation (HPSA) technology. HPSA processes solid feed
Jan 1, 2025