Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A review of readiness assessments for mining projectsBy H. Mulder, M. C. Bekker
The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and
Jul 2, 2022
-
The Use Of Low-Toxic Heavy Suspensions In Mineral Sands Evaluation And Zircon Fractionation (ddd62330-69a4-46cf-9633-60c65dae34ec)By C. Klutke
This paper outlines a simple methodology for mineral characterization, developed as part of the Australian Mineral Industry Research Association (AMIRA) managed research project P777 ?The Development
Jan 1, 2007
-
Mining and Treatment Plant Practice at the Finsch Mine, De Beers Consolidated Mines Ltd.By D. Rankin, H. J. Stucke, W. K. B. Loftus
Discussion: H. J. Wright (Member): The authors are to be congratulated on presenting such a comprehensive and lucid account of bringing a large diamond mine into efficient production from the grass r
Jan 3, 1969
-
Improvements in stope drilling and blasting for deep gold minesBy N. G. Cook, N. C. Joughin, A. J. A. White
The rate of face advance in the gold mines is between 3 and 10 m a month, with a median value of about 5 m a month; it follows that faces are blasted less frequently than is planned. There are many ad
Jan 1, 1975
-
Use of Ion Exchange to Increase Value in Copper–Cobalt OperationsBy J. van Deventer
Ion exchange is widely used in hydrometallurgical operations for the recovery and purification of valuable metals. Special chelating resins have a high affinity for specific elements, allowing the sel
Jan 1, 2023
-
Indicators Of Grindability And Grinding EfficiencyBy J. Levin
Bond's Standard Work Index (SWi) indicates the grindability of an ore, and his Operating Work Index (OWI) indicates the performance of a grinding mil or circuit. The comparison of the two indices
Jan 1, 1992
-
Modelling unsaturated dual-phase flow through crushed ores for heap leachingBy J. Petersen, S. W. Robertson
Heap leaching is used extensively for the processing of low-grade copper, gold, and uranium ores. The hydrodynamics is often the most important factor that limits the rate of metal recovery. Over the
Dec 11, 2024
-
Pragmatism in industrial modelling: An application to ladle lifetime in the steel industryBy S. T. Johansen, B. T. Løvfall, T. Rodriguez Duran, J. Zoric
A methodology for building pragmatic physics-based models is here adapted to predict the erosion of ladle linings in the steel industry, in order to support operators when deciding whether the lining
Apr 16, 2024
-
Research in Pressure LeachingBy Franz E. Pawlek
Synopsis This is a summary of investigations in the field of pressure leaching carried out at the Institute for Extractive Metallurgy of the Technical University of Berlin-West during the last seven
-
Proceedings of the Seventy-Fifth Anniversary Meeting Held in Kelvin House, Johannesburg, on 24th March, 1969, at 10.15 A.M.Mr R. C. J. Goode (President) was in the Chair. There were also present one hundred and thirty-six Members, including Messrs R. J. Adamson, Dr J. M. Bereza, Messrs M. Barcza, H. Britten, H. E. Cross,
-
Contact sorption drying of chromite concentratesBy C. Snyman, M. Le Roux, Q. P. Campbell, S. Engelbrecht
Due to the ultrafine particle size required for effective processing of chromite ores, dewatering of the concentrates presents a challenge. It is not uncommon for the ore to have elevated moisture con
Oct 3, 2023
-
Open Pit Planning"Chairman: Professor E. P. PFLEIDER Rapporteur: Mr P. R. JANISCHPapers:Optimum design of an open pit by D. A. PhillipsAn open pit design system for stratiform ore bodies by L. A. J. Pronk van Hoogevee
Jan 1, 2014
-
The Institute of Lighting Engineers of South AfricaThe Institute of Lighting Engineers of South Africa The Institute of Lighting Engineers of South Africa (ILESA) was constituted in May 1972 and now has over 70 members. The first Annual General Meetin
Jan 3, 1974
-
Current Trends In The Development Of New Or Optimization Of Existing Diamond Processing Plants, With Focus On BeneficiationBy P. van der Westhuyzen
Gone are the days of stock-standard diamond beneficiation and final recovery circuits that could, with minor modifications, be adapted to treat any diamond-bearing ore source. A new era has dawned, of
Jan 1, 2014
-
Exploring Potential Errors in XRF AnalysisBy Nicolle Krusberski
Potential errors in XRF analysis are discussed and investigated with specific reference to the analysis of ilmenite samples. A selection of ilmenite samples was chosen and prepared using two XRF prepa
Jan 1, 2014
-
Annual Report and AccountsCOUNCIL AND STANDING COMMITTEES, 1974-1975 Office Bearers : Prof. R. P. Plewman (President), Dr R. E. Robinson and Dr M. D. G. Salamon (Vice Presidents), J. K. E. Douglas (Honorary Treasurer), and P.
Jan 10, 1975
-
Improving Iron Precipitation and Other Precipitation Steps Through Data Analysis and ModellingBy N. du Preez, J. Christie, F. Crundwell
Precipitation is a key process in the recovery of copper and cobalt. While there is a wealth of experience in operating precipitation steps, improving their performance remains challenging. Chemically
Jan 1, 2023
-
Optimisation and Prediction of Co3+-Enhanced Dissolution in Sulfuric AcidBy B. Mbuya, A. F. Mulaba-Bafubianda, J. M. Mvita
The paper explains the main effects of input leaching parameters, such as addition of a reducing agent, acidity, agitation, temperature, and leaching system potential, in relation to observed and pred
Jan 1, 2023
-
Plasma Technology for the Manufacturing of Nuclear Materials at NecsaBy J. L. Havenga, L. J. van der Walt, J. T. Nel
"SynopsisThe development of plasma technology at Necsa started in the early 1980s, when the applicability of high-temperature plasmas in the nuclear fuel cycle was investigated. Since 1995, this plasm
Jan 1, 2015
-
The process audition, a method of improvement opportunities in mineral processing circuits - Case study: Gohar-Zamin Iron Ore Beneficiation Plant, S.H. Amiri, S. Zare, M. Ramezanizadeh, E. Arghavani, and F. SepehriBy E. Arghavani, S. H. Amiri, S. Zare, F. Sepehri, M. Ramezanizadeh
Mineral processing plants include different stages like crushing, grinding, classification and concentration, all of which have partially affect the final product. To identify and solve the related pr
Jan 1, 2020