    A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in Turkey

    By Arash Maghsoudloo, Asli Can

    "Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi

    Jan 1, 2014

  • DFI
    Deep Foundation Shoring in South Florida

    By Douglas C. Brunot

    Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w

    Jan 1, 2018

  • DFI
    Increasing Lateral Pile Stiffness Through Limited Soil Improvement

    By Thomas J. Weaver

    Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat

    Jan 1, 2006

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • DFI
    Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance

    By Gustavo Armijo

    Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha

    Jan 1, 2006

  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    Effect Analysis On Static And Dynamic Tests Of Pile Foundations

    By Hou Shitao

    With the development of Wuhan's city planning in China, new buildings of moderate and high store have been increasing day by day. Precast concrete piles or cast-in-site piles were used in the maj

    Jan 1, 1991

  • DFI
    Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic Loads

    By Amy B. Cerato

    The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic

    Jan 1, 2008

  • DFI
    Quality Assurance In Jet Grouting For A Deep Seated Slab In Amsterdam

    By Thomas Passlick

    By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as

    Jan 1, 2006

  • DFI
    Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.

    By Paul M. Wiltcher

    This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas

    Jan 1, 2006

  • DFI
    Collaborative Alliances – A Sustainable Way Forward For Construction?

    By Stefano Trevisani

    Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,

    Jan 1, 2014

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • DFI
    Behavior Of Excavation With Sheet Piling In Soft Clay ? Synopsis

    By G. X. Zeng

    A calculation programme of finite element method has been developed in order to study the behavior of excavation with sheet piling in soft clay. Based on a series of isotropically consolidated-undrain

    Jan 1, 2010

  • DFI
    Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2003

  • DFI
    The Spadina Pier Cofferdam - Design, Installation & Performance

    By Jan A. Nilsen

    This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one

    Jan 1, 1987

  • DFI
    The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)

    By Christian Besson

    This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv

    Jan 1, 2002

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989

  • DFI
    Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - Summary

    By Roy A. Bell

    A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet

    Jan 1, 1997

  • DFI
    Recent Developments In Continuous Flight Auger Piling

    By P. H. Derbyshire

    The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des

    Jan 1, 1989