Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Achieving a Great Start-Up: Action Plan to Maximise Your Chances of SuccessBy S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier
"The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well
Jan 1, 2016
-
Owl Creek Processing SummaryBy O. Matwijenko
"1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with
Jan 1, 1988
-
The Benefits and Challenges of “Split Milling” at the Williams MillBy Glenn Norris, Tyler Buckingham
"Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini
Jan 1, 2010
-
Modeling the Dynamic Mechanical Behaviour and Texture Evolution of Additively Manufactured Alsi10mg_200cBy Mohsen Mohammadi, Edward Cyr
"To date, several studies have been performed on the static mechanical properties of SLM-AlSi10Mg alloy. There have also been more recent studies on the relation between scan strategy, texture, and me
Jan 1, 2018
-
Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)By Brad Hewitt, Jeff Belke
"Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op
Jan 1, 2005
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Development of a Stable Social Unit at the Black Angel MineBy P. J. Noakes
Remote and isolated, located in a frigid, hostile environment, the Black Angel mine in Greenland had to create a warm social environment which would help attract and retain a stable work force of mine
Jan 1, 1978
-
A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine AreasBy Anil K. Beersing
Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring
Apr 1, 2005
-
Selecting the Correct Cyanide Destruction Process for Your OperationBy R. Agius, A. Nacu
"Adoption of the International Cyanide Management Code, regulatory requirements and community concerns have increased the need to implement suitable cyanide destruction processes at gold operations to
Jan 1, 2017
-
Continuous Improvements of Porcupine Joint Venture (PJV) Dome Mine's Gravity CircuitBy T. Y. Chong, J. A. Folinsbee, M. Fullam
PJV Dome Mine has used some form of gravity concentration since start of milling operation in 1909 to recover free milling gold. Amalgamation and conventional jigs were first used and were replaced wi
Jan 1, 2005
-
Development of Barrick Gold’s Bulyanhulu MineBy John Frostiak
"Kahama Mining Corporation Limited, a wholly owned subsidiary of Barrick Gold Corporation, poured the first dore bar and filtered the first concentrate produced at the Bulyanhulu mine on February 28,
Jan 1, 2003
-
How the Mining Industry is Responding to Pressures for Change in the Management of Mine WasteBy Don Welch
Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc
May 1, 2010
-
The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1By Marc Legault
The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra
May 1, 2004
-
Rabbit Lake project – environmental impactBy R. L. J. Phillips
"The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental
Jan 1, 1989
-
BHP Diamonds Inc. - Ekati Diamond MineBy Jim Excell, Jim Rothwell, Mike Rylati
"LocationThe Ekati Diamond mine is located at Lac de Gras, Northwest Territories.Brief Description of OperationBHP Diamonds Inc. has developed Canada's first diamond mine in the Northwest Territories
Jan 1, 2000
-
Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfillsBy F. P. Hassani, H. B. Poorooshasb
"A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro
Jan 1, 1989
-
Towards a Better Understanding of Stirred Milling Technologies - An Overview of Scale-Up MethodologiesBy Adam Moore, Peter Radziszewski, Matt Gallimore
"Stirred mill technology dates back to 1928 where the idea to use “an agitator and spherical grinding media” was presented. In the context of the mining industry, interest in stirred milling technolog
Jan 1, 2016
-
An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 mBy Wendy L. Naysmith
This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to
Oct 1, 2010
-
Tuluwaka Mine – From Greenfield to Production in 14 MonthsBy Ross Nairn
"Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani
Jan 1, 2006
-
Capital Cost Estimating for Mineral Processing PlantsBy R. J. Balfour, T. L. Papucciyan
"INTRODUCTIONCapital Cost considerations are basic to feasibility in the achievement of success for Mineral Processing Projects as much as or more than in many other industries. Capital cost is an imp
Jan 1, 1972