Search Documents

  • NIOSH
    IC 8205 A Study Of Dust-Control Methods For Continuous Mining Of Coal

    By Floyd G. Anderson

    A study was made of the effectiveness of dust-control methods being employed in connection with continuous-mining operations. Airborne dust exposures of workmen and dust loadings of return air were de

    Jan 1, 1963

  • SME
    The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project

    By Jean Habimana

    Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc

  • NIOSH
    IC 6927 Coal-Mine Explosions And Coal-And Metal-Mine Fires In The United States During The Fiscal Year Ended June 30, 1936 ? Introduction

    By D. Harrington

    The record of fatalities from mine explosions in the United States during the past 3 years has been the best in the history of the mining industry. During these 3 fiscal years, mine explosions have re

    Jan 1, 1936

  • NIOSH
    Bulletin 179 Abstracts of Current Decisions on Mines and Mining

    By J. W. Thompson

    ESTATE IN MINERALS. Minerals beneath the surface may be made the subject of separate ownership either by a grant of the minerals by the owner of the land or by a grant of the land excepting the miner

    Jan 1, 1919

  • AUSIMM
    The Formation of Banded Epithermal Quartz Veins at the Golden Cross Mine, Waihi, New Zealand

    By G B. Arehart, S J. Mathews, J L. Mauk

    The banded nature of the quartz veins which form the Empire lode at the Golden Cross mine, is perhaps their most striking feature. Petrographic studies show that significant differences occur between

    Jan 1, 1995

  • TMS
    Integrating Computational Mechanics and Numerical Optimization for the Design of Material Properties in Electronic Packages

    By S. Stoyanov, M. Cross

    "Silicon components containing transistor circuitry are at the heart of electronic products such as computers, mobile phones, etc. These components are connected to printed circuit boards (PCB's) usin

    Jan 1, 2001

  • NIOSH
    RI 8137 Geological Factors Affecting Methane in the Beckley Coalbed (2e2347d7-d43b-42eb-8bc8-a385afc5f7a0)

    By J. T. Popp

    This Bureau of Mines study reviews the geological factors that affect methane in the Beckley coalbed in southern West Virginia, including overburden, coalbed structure, type of and changes in litholog

    Jan 1, 1976

  • SME
    United Nations’ Emergency Preparedness Program Available to Mining Industry

    The Awareness and Preparedness for Emergencies at the Local Level (APELL) program is a process that helps people prevent, prepare for and respond appropriately to accidents and emergencies. APELL was

    Jan 1, 2003

  • DFI
    Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge

    By Jacob Chacko

    The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new

    Jan 1, 2002

  • AUSIMM
    The Oxidation of Aqueous Ferrous Sulphate Solutions by Molecular Oxygen

    The oxidation of ferrous sulphate to ferric sulphate with air and oxygen in a gas lift percolator was investigated with initial Fe2+ concentrations in the range 0·01 M to 1·0 M,temperatures

    Jan 1, 1972

  • CIM
    Experimental investigation of the oxidation and consolidation of sulphide aggregates and the application to underground muck-piles Lockerby Mine, Sudbury, Ontario

    By S. Nikolic, O. O. Kehinde-Philllps, O. T. Djamgouz, D. H. Rousell

    "A bulk mining method is employed at the Lockerby mine resulting in the formation of large muck-piles. If these muckpiles remain in the stopes for some time they may agglomerate to the extent that the

    Jan 1, 1984

  • NIOSH
    OFR-49-75 Seismic Mine Monitor System - Phase IV Report

    By J. C. Fowler

    The field testing of the Seismic Mine Monitor System is described. This system consists of nine geophones buried about 40 feet deep over a ten-square-mile area, the amplifiers and electronics needed t

    Jan 1, 1974

  • AUSIMM
    Some Factors Affecting the Behaviour of Lead During and Subsequent to Deformation by Rolling and Pressing

    During the course of the major research in the Metallurgy Department of the University of Melbourne into the creep characteristics of lead and .its dilute alloys, it has been the practice to prepare t

    Jan 1, 1940

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • SAIMM
    New Slope Stability Considerations For Deep Open Pit Mines

    There has been disappointingly little development in the analysis of rock slopes in open pit mines over the past 30 years. A brief review of literature shows that the application of numerical stress a

    Jan 1, 2003

  • NIOSH
    IC 8887 The Bureau Of Mines Minerals Availability System: An Update Of Information Circular 8654

    By Herbert R. Babitzke

    The Minerals Availability System (MAS) was formally established by the Bureau of Mines in May 1975 to provide current appraisals of the engineering and economic availability of nonfuel minerals for co

    Jan 1, 1982

  • SME
    Binding Iron Ore Pellets With Fly-Ash – Preprint 97-105

    By D. D. Banerjee, S. K. Kawatra, T. C. Eisele

    A high calcium fluid-bed combustor ash has been shown to be an effective binder at dosages of 1 to 2% of the magnetite concentrate weight. Magnetite pellets 1.3 cm (1/2 inch) in diameter were produced

    Feb 24, 1997

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME
    Rib Support Optimization for a Room-and-Pillar Mine

    The National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C

    Jul 28, 2020

  • NIOSH
    RI 7599 Use Of Char To Improve Physical Quality Of Coke From Allen (Colorado) Coal

    By Charles C. Boley

    High-volatile A bituminous coal from the Allen mine, Las Animas County, Colo., blended with char produced from the same coal yielded accept-able metallurgical coke in a 500-lb movable-wall test oven.

    Jan 1, 1972