Search Documents

  • SAIMM
    Improvement in the Overall Efficiency of Mining Equipment: A Case Study

    "In mechanized mining, poor equipment efficiency (availability, utilization, productivity, and quality) can endanger the success of the operation. This case study will show how an initiative to improv

    Jan 1, 2016

  • IIMP
    Sistemas de información en planta

    By José Arango

    La Planta Hidrometalúrgica de Cerro Verde tiene como objetivo alcanzar la máxima calidad en cada uno de sus procesos operativos. Para ello, desarrolla un diseño que permita la transformación del contr

    Jul 17, 2000

  • SME
    A Disappointing Year for Industrial Minerals Production

    A glance at the accompanying table reveals that for the first time in many years the industrial minerals field did not post significant gains in production. Gypsum, cement, sand and gravel, and cru

    Jan 5, 1980

  • NIOSH
    IC 8761 Preliminary Economics Of Mining A Thick Coal Seam By Dragline, Shovel-Truck, And Scraper Mining Systems

    By Michael J. Bertoldi

    The purpose of this Bureau of Mines report is to describe the methods and establish the basic economics for dragline, shovel-truck, and scraper mining systems. An overall view of the techniques of pre

    Jan 1, 1977

  • SME-ICGCM
    A Method for Sizing Longwall Pillars Based on Field Measurements

    By Christopher Mark

    A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field

    Jan 1, 1987

  • NIOSH
    IC 6592 Methods And Costs Of Mining And Preparing Gravel And Sand For Market At The Plant Of The Seaboard Sand And Gravel Corporation, Port Jefferson, N. Y. - Introduction

    By Anderson Dana

    THIS PAPER describing methods and costs of mining and preparing gravel and sand for market at the Port Jefferson plant of the Seaboard Sand and Gravel Corporation, is one of a series of articles on gr

    Jan 1, 1932

  • DFI
    Value Engineering of Reinforcement used in Large Diameter Drilled Shafts

    By Shahid Islam, Lucian Bogdan

    Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu

    Jan 1, 2018

  • SME
    The DC WASA Anacostia River CSO Control Tunnel Project

    By David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri

    On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo

    Jan 1, 2007

  • NIOSH
    IC 9389 Passive Treatment Of Coal Mine Drainage

    By Robert S. Hedin

    Passive methods of treating mine water use chemical and biological processes that decrease metal concentrations and neutralize acidity. Compared with conventional chemical treatment, passive methods g

    Jan 1, 1994

  • SME
    Copper Hydrometallurgy – Evolution and Milestones

    By Nathaniel Arbiter

    In contrast to pyrometallurgy's 6000year history in metals production, hydrometallurgy is of relatively recent origin. The earliest reference to it was in the 16th century, with the first applica

    Jan 1, 1994

  • NIOSH
    OFR-52(1)-84 Surface Coal Mine Spoil Stability Study Eastern Coal Province - Volume I

    By Paul G. Swanson

    This investigation was conducted to identify the principle causes of spoil instability problems in the Eastern Coal Province. The study was also conducted to develop a matrix to predict the strength a

    Jan 1, 1983

  • NIOSH
    IC 8068 Mining And Milling Methods And Costs, Vermont Asbestos Mines, The Ruberoid Co., Hyde Park, Vt. ? Introduction And Summary

    By H. L. Burmeister

    This is one of a series of publications by the Bureau of Mines dealing with mining methods and costs at representative operations in the United States. The report describes all phases of the mining me

    Jan 1, 1962

  • SME
    The Practical Use Of Sandfill In Creating Pillar Stability And Preventing Subsidence

    By W. K. Callaway

    The need to increase ore recovery and pillar stability caused the Magmont Mine staff to investigate the use of sandfill to accomplish both tasks. The use of hydraulically stowed classified mill tailin

    Jan 1, 1986

  • CIM
    Leaching/flotation processing of complex sulphide ores

    By Franciszek Letowski

    "Recovery of precious metals associated with a sulphidic matrix has an important economic effect on complex sulphide ore treatment. Because a significant portion of the silver and gold associated with

    Jan 1, 1987

  • SME
    Anticipated Behavior Of Silty Sands In Tunneling

    By Ronald E. Heuer, Debra L. Virgens

    INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,

    Jan 1, 1987

  • CIM
    Developing a Consistent Approach to Mine Reclamation - Cape Breton Development Corp. (CBDC) Mine Site Closure Program

    By Belinda Campbell

    Tools for Consistency 1. GIS Web Site 2. National Project Management System 3. Site Grouping Approach (721 PIDs) 4. Mine Reclamation Standing Offer Agreements ?Contracting tool 5. Remedial Object

    May 1, 2011

  • AUSIMM
    Sampling and Ore-Buying on the West Coast of Tasmania

    The following notes apply more especially to the purchase of silverlead ores produced in the neighbourhood of Zeehan and Dundas; for it is this class of ore that is principally mined in those parts, a

  • NIOSH
    IC 8126 Blasting Stumps In Coal Mines ? Introduction

    By R. W. Stahl

    The use of continuous mining machines has greatly minimized the necessity for blasting in coal mines, even during pillar recovery; however, explosives are still used to blast stumps. The use of improp

    Jan 1, 1962

  • ISEE
    Blasting with a Spherical Charge at Serra Geral Mine

    By Marcello Crispi, Valdir Silva, Juarez Moraes

    Companhia Vale do Rio Dote - CVRD is the largest mining company in Brazil and the largest iron ore producer in the world. Serra Geral Mine (SGM) is located at Iron Quadrangle of the State of Minas Ger

    Jan 1, 2002

  • SAIMM
    "Pipeline Integrity Using The External Corrosion Direct Assessment (Ecda) Methodology: A Case Study" - 1. Introduction

    By Chris Ringas

    The safe operation of gas transmission pipelines is increasingly coming under the spotlight. Increasing environmental pressure is also forcing pipeline owners and operators to ensure the integrity of

    Jan 1, 2006