Search Documents

  • NIOSH
    IC 6879 Sand And Gravel Excavation: Part VI: Mining Methods ? Introduction

    By J. R. Thoenen

    This circular is part 6 of the third paper (entitled "Excavation") of a series summarizing the technical problems involved in the production and preparation of sand and gravel. Part 1 discussed the us

    Jan 1, 1936

  • SME
    Determination Of Volumetric Changes From Laser Scanning At An Underground Limestone Mine

    By B. Slaker

    The ability to detect and quantify ground movements in underground mine workings is of the utmost importance to the safety of miners and continuity of operations. Rib sloughage is one of the most comm

    Feb 27, 2013

  • ISEE
    An Automated Approach to Blast Optimization Through Performance Monitoring of Blast Hole Drills and Mining Shovels

    By M Scoble

    This paper will report on the application of data collected through the performance monitoring of large diameter surface rotary blasthole drii and electric mining shovels, in an integrated approach to

    Jan 1, 1992

  • NIOSH
    OFR-164-77 Conceptual Design And Engineering, Economic And Environmental Analysis Of Surface Pit Slope Caving Mining System

    By H. M. Coggin

    The study summarizes the state of the art in rock mechanics, open pit and underground mining, leaching, geology, metallurgy and financial analysis Conceptual design of pit slope caving technique and a

    Jan 1, 1977

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004

  • SAIMM
    Theoretical, practical, and economic difficulties in sampling for trace constituents - Synopsis

    Many industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr

    Jan 1, 2010

  • AIME
    Minerals Beneficiation - Correlation of Product Size, Capacity and Power in Tumbling Mills

    By U. N. Bhrany, N. Arbiter

    Over the last one hundred years the problem of assessing the efficiency of energy consumption in producing rock breakage has been studied by many investigators from a variety of viewpoints. Their cont

    Jan 1, 1961

  • SME
    Tunnel Protection by Ground Improvement Prior to Track Lowering

    By Ronald E. Triplett, George K. Burke, Bernard H. Voor

    To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which

    Jan 1, 2001

  • AUSIMM
    Improvements to Blasting Practices at Ok Tedi

    By Beevers J

    The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.

    Jan 1, 1991

  • SME
    Long-Range Planning Commission - Report of the Management and Organization Committee

    By A. Tobey Yu, W. Joseph Schlitt, Alfred Weiss, Frederic L. Kadey, Louis Kuchinic

    Introduction The February and April 1984 issues of MINING ENGINEERING have already provided introduction to the long-range planning efforts of the Society of Mining Engineers (SME). These efforts are

    Jan 6, 1984

  • NIOSH
    RI 8057 Thermomechanical Method for Secondary Breakage of Hard Rocks

    By K. Thirumalai

    The feasibility of breaking hard rock by thermal weakening and subsequent mechanical impacting was tested, Field tests at a basalt quarry in Dresser, Wis., demonstrated that large hard-rock blocks (5

    Jan 1, 1975

  • AUSIMM
    Laboratory and Field Tests on Point Anchored Resin Bolts at the Ridgeway Deeps Block Cave

    The design of excavations in high displacement mining environments requires consideration of both the load and displacement capacity of the ground reinforcement and support systems. This paper is a ca

    Nov 25, 2010

  • SME
    Hydrocyclone Modelling: Large Eddy Simulation CFD Approach

    By Jose A. Delgadillo

    The hydrocyclone problem has been a challenging task for the last 30 years. In the 80’s and 90’s Computational Fluid Dynamics solution to this problem began to appear. These were unsuccessful due to o

    Jan 1, 2005

  • NIOSH
    RI 3514 Equilibrium Cell For Investigating Properties Of Fluids From Petroleum And Natural-Gas Reservoirs (With A Section On Hypothetical Phase Relations Of Natural Hydrocarbon Mixtures) (3cfef113-cb31-470e-a75b-e77a5e68edbb)

    By Kenneth Eilerts

    The development and operation of "combination wells"5/ have created new and unusual problems, many of which can he solved only if information is available concerning the properties of the fluids produ

    Jan 1, 1940

  • NIOSH
    Safer Mine Hoisting With Conveyance Position and Load Monitoring

    By Michael J. Beus, Stephen Iverson

    BACKGROUND A mine shaft is the lifeline to underground mines. Mine operators depend on safe, uninterrupted, and efficient movement of workers and materials. The shaft and hoisting system provides a

  • NIOSH
    IC 8072 Quadratic Functions For Iron Radiation, 0° To 180° 2? ? Summary

    By Ronald M. Lewis

    Quadratic functions, Q(hkl), are given to six places in increments of 0.01° for 2? from 00 to 90° for FeKa and from 25° to 180° for FeKa1. The wavelengths used for Fe in the computation are those agre

    Jan 1, 1961

  • NIOSH
    IC 7446 Annual Report of Research and Technologic Work on Coal, Fiscal Year 1947

    By P. M. Ambrose, A. C. FtELDNER

    This , the twelfth annual report of research and technologic work conducted by the Bureau of Mines on coal and coal products , summarizes the research and tests conducted frah July 1, 1946, to July 1,

    Jan 1, 1948

  • SME
    What it’s worth : A review of mineral royalty information (cdb31e8a-0d35-470b-98b2-e49232f0c791)

    By H. Lyn Bourne

    This is the seventh annual tabulation of royalty information. It is also the first year in which some data have been deleted to make room for new data. The concept of royalties evolved from a time

    Jan 1, 1989

  • SAIMM
    Hydraulic mining of an in situ heavy mineral ore reserve

    By M. Berger

    The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at

    Jan 1, 2003

  • ISEE
    Impact of Blasting on Downstream Process to Maximize the Profitability of Mining Industries

    By Kyle Wagner, William Joa, Colter Angell, Catherine Johnson, Marty Langenderfer, David Doucet

    The goal of any business is to seek the maximum profitability for the organization through optimization the use of resources, processes and the application of new technologies. An analysis of various

    Jan 1, 2019