Search Documents

  • NIOSH
    RI 7708 Glass Wool From Waste Glass - With An Appendix On Economic Evaluation Of Glass Wool Production By Paul W. Johnson

    By Alan H. Goode

    Glass wool meeting requirements for commercial use was made from glassy fractions of urban solid wastes by the Bureau of Mines. This research was a part of the Bureau's program to develop buildin

    Jan 1, 1972

  • AUSIMM
    Research into Alluvial Gold Recovery in Alaska and the Yukon Territory

    Alluvial gold mining is thriving in the Yukon Territory and Alaska. The scale of many operations is similar to those in New Zealand but there is greater government support for research and test work.

    Jan 1, 1989

  • CIM
    How to Expedite Geological Investigation and Prospecting in Canada

    ONE of the morning sessions at the recent Annual Meeting was devoted to a Symposium on ways and means to expedite geological investigation, and also to promote greater prospecting activity, in Canada.

    Jan 1, 1941

  • DFI
    Piled Raft Design For High Rise Buildings In East London, UK

    By D. P. Nicholson

    The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South

    Jan 1, 2002

  • AUSIMM
    Measuring and Taking Notice of Orebody Variability – An Essential Ingredient for Reliable Plant Design

    By D David

    The majority of SAG and ball mill design methodologies are applied using a single design value for mill selection, such as the 80th percentile ball mill work index or SMC value. Inherent in the select

    Sep 7, 2015

  • SME-ICGCM
    Effect Of Water On Stability Of Mine Roadways

    The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road

    Jan 1, 1996

  • SME
    Chambers Creek Interceptor Sewer Tunnel

    By J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass

    The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll

    Jan 1, 1985

  • SAIMM
    Estimating mine planning software utilization for decision-making strategies in the South African gold mining sector

    By T. Celik, B. Genc, C. Musingwini

    "This paper discusses a new methodology for defining and measuring mine planning software utilization in the South African gold mining sector within an evolving data-set framework. An initial data-set

    Jan 1, 2015

  • AIME
  • SAIMM
    The grate-kiln induration machine - history, advantages, and drawbacks, and outline for the future

    By J. C. Ion, O. Isaksson, J. Stjernberg

    Iron ore pellets are a preferred feedstock for ironmaking. One method used for pelletizing is the grate-kiln process, first established in 1960.During the past decade, the establishment of new grate-k

    Jan 1, 2015

  • CIM
    CMIC-NSERC Footprints Project: A Roadmap for Large Project Development and Implementation

    By Alan Galley

    CMIC Mandate CIM Annual Meeting, Toronto, May 6, 2013 To increase mining research, innovation and commercialization efforts in order to strengthen Canada?s pre-eminent role as a global leader in min

    May 1, 2013

  • CIM
    Quality Control of Assay Data: A Review of Procedures for Measuring and Monitoring Precision and Accuracy

    By M. Abzalov

    "Control of analytical data quality is usually referred to in the mining industry as Quality Assurance and Quality Control (QAQC), and involves the monitoring of sample quality and quantification of a

    Jan 1, 2008

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • SME
    Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.

    By V. Galla

    Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding

    Jan 1, 2011

  • AUSIMM
    U-Th Isotopes and the Generation of Magmas along Destructive Plate Margins

    By E Heath, F McDermott, S Turner, P van Calsteren

    U-Th isotope studies of recent volcanic rocks may be used to evaluate the depths and rates of melt generation beneath midocean ridges and ocean islands. Island arc rocks exhibit a similar range in Th

    Jan 1, 1995

  • TMS
    Reuse of Fired Red Ceramic Brick Waste

    By C. M. F. Vieira

    In the county of Campos dos Goytacazes, north of the State of Rio de Janeiro, Brazil, there is a large production of red ceramic, mainly perforated bricks. A percentage of these bricks are damaged dur

    Jan 1, 2010

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • SAIMM
    Mining through areas affected by abnormal stress conditions at Syferfonte in Colliery

    By C. Legote

    "This paper investigates the conditions leading to the indefinite termination of production in four critical primary panels at an underground coal mining operation, the observed shortcomings in the mi

    Jan 1, 2015

  • NIOSH
    RI 7672 Emission Characteristics Of Propane As Automotive Fuel

    By J. R. Allsup

    Air pollutants in exhaust gas produced from LP-gas (propane) were studied using both laboratory engines and vehicles. The objective of the study was to evaluate engine parameters relating to the advan

    Jan 1, 1972

  • SME-ICGCM
    Effect of Faults on the Movement of Roof Strata in Gateroads

    By Panfeng Gou

    In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical

    Jan 1, 2006