Search Documents

  • AUSIMM
    Technology Selection for Removal of Contaminants from an Industrial Wastewater

    By T van der Meer, A Salokannel, M Martikainen, L M. Nevatalo, J McCulloch

    Water use and wastewater management is becoming a focus for many industries around Australia and the rest of the world. Good quality water is increasingly being recognised as a precious resource, and

    Jul 15, 2013

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • CIM
    Exploration risk

    By R. G. Burn

    "A brief outline will be given of the concept of risk and its implications with regard to investment in exploration. The relationship between risk and decisions under uncertainty will be examined as a

    Jan 1, 1984

  • AUSIMM
    Mining Education in Australasia

    THE Australian States and New Zealand have for many years provided instruction in mining, metallurgy, geology, and their allied subjects through their Universities and Schools of Mines. Though such ed

    Jan 1, 1915

  • CIM
    Quality Control Improvements in Bessemer Matte Production at the Vale Copper Cliff Smelter

    By M. Zanini, D. Wong

    ABSTRACT: Metals market improvements in 2005 drove the desire to increase nickel throughput and the production of nickel oxide sinter at the Vale Ltd. Copper Cliff smelter. Significant difficulties we

    Jan 1, 2012

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • NIOSH
    IC 7370 Report On The Investigation By Fuels And Lubricants Teams At The I. G. Farbenindustrie A. G. Leuna Works, Merseburg, Germany - Introduction

    The Leuna Factory of the I. G. Farbenindustrie A. G., situated near Merseburg, is the biggest heavy-chemical plant in Germany and produces a very wide range of products, mainly based on hydrogen or hy

    Jan 1, 1946

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • NIOSH
    IC 7414 Geophysical Abstracts 127, October-December 1946, with an Index to Abstracts 124-127, compiled

    By V. L. SKITSKY

    Geophysical Abstracts are published by the Division of Geophysical Explo- ration of the U. S. Bureau of Mines as an aid to those engaged in geophysical research and exploration. Inasmuch as geophysici

    Jun 1, 1947

  • SAIMM
    Strong ground motion and site response of mine-induced seismic events

    By S. K. Murphy, S. M. Spottiswoode, A. M. Milev, D. Geyser

    A portable, stand-alone instrument especially designed for recording strong ground motion was used in this study to create a large database of peak particle velocities measured underground. A total nu

    Jan 1, 2003

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • TMS
    Anode Casting Operation, Process Improvements And Anode Quality At The Ilo Refinery

    By Victor Raul Alarcon

    The Ilo Refinery was commissioned in 1975, with a cathode production capacity of 150,000 tpy. In 1994, Southern Perú Copper Corporation (SPCC) purchased the Refinery from Minero Perú SA. Subsequentl

    Jan 1, 2005

  • CIM
    Electromagnetic testing of wire ropes — New developments

    By K. Leung, J. E. Udd, L. B. Geller, F. Kitzinger

    "Sixteen miners died tragically at the Paymaster gold mine in Timmins, Ontario, in February 1945 when a badly corroded hoist rope broke. The investigation of the Royal Commission that followed arrived

    Jan 1, 2003

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • SME-ICGCM
    A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

    Jan 1, 2006

  • CIM
    802.11 Wireless Site Survey Methodologies in an Underground Mine Environment

    By Mark G. Lafontaine

    Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as

    May 1, 2013

  • CIM
    Leadership in Maintenance Best Practices - The Mining Experience

    Leadership "Organizing a group of people to achieve a common goal" Paradigms ? Rush to produce or cut costs. ? The most important thing after safety is production. ? We?ll take care of ??this?? o

    Aug 1, 2013

  • SME
    Evaluation of Post-blast Re-entry Times Based on Gas Monitoring of Return Air Mining, Metallurgy and Exploration

    By L. Yuan, J. H. Rowland, D. Bahrami, R. Thomas

    Blasting is the main method of production in many non-coal underground mining operations and produces multiple toxic gases as a result. The Mine Safety and Health Administration (MSHA) requires mine o

  • AIME
    Chile’s Coquimbo Port Installs Mobile Loading Facilities

    By A. T. Yu

    On March 18, 1964, the 52,000 dwt ore carrier M/S Houn Maru called at the port of Coquimbo, Chile, on its maiden voyage to take iron ore to Japan. This marked the first time a vessel of this size ever

    Jan 5, 1964