Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Alternative Delivery and Trenchless Methods Used to Install 60,000 LF of Pipe on the Bay Park Force Main Project - NAT2024
By Jeff LeBlanc, George Gutierrez, Carl Pitzer
The Bay Park Conveyance Project was one of the largest microtunneling and rehab projects in the United States at the time of completion. The completed project conveys treated water from the South Shor
Jun 23, 2024
-
Alternative Design and Construction Method for Clinton CSO Underground Storage Facility
By Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Alternative Design Approach for Drag Load and Downdrag of Deep Foundations within the LRFD Framework
By Timothy C. Siegel, Derrick Dasenbrock, Rich Lamb, Paul J. Axtell
"The axial resistance provided by deep foundations may be divided into two components: side resistance and tip resistance. The direction that the side resistance acts depends on the relative movement
Jan 1, 2015
-
Alternative Dispute Resolution and Conflict Management Issues for Minerals Industry Professionals û An Australian Perspective
Technical disputes, commercial negotiations and workplace/societal conflict are a natural part of doing business and just living itself. Conflict is everywhere û at home (between family and neighbours
Jan 1, 2006
-
Alternative Dissolution Of Zircon Samples And Simultaneous Analysis Of Major And Trace Components ? Synopsis
By S. J. Lötter
Analysis of the major and minor components of raw zircon as well as plasma-dissociated zircon was undertaken using inductively coupled plasma optical emission spectroscopy (ICP-OES). Microwave-assiste
Jan 1, 2012
-
Alternative Electrolyte Compositions For Aluminium Electrolysis
By S. Rolseth, J. Thonstad
The traditional electrolyte for aluminium electrolysis is based on molten cryolite (Na3AlF6), acting as solvent for the raw material, alumina (Al2O3). Over the years there has been a trend to increase
Jan 1, 2004
-
Alternative Face Cutting Systems For Longwall Mining
By R. K. Singhal
In an underground coal mining environment, a frictional ignition may be defined as the ignition of an explosive air/ methane/coal dust mixture by mining machinery. As the use of power loading equipmen
Jan 1, 1985
-
Alternative Final Cavern Linings For The East Side Access Transit Project
By Colin Barratt
The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and
-
Alternative Host Rocks for Archaean Gold Deposits: Nature and Genesis of Hydrothermal Gold Deposits, Kanowa, Western Australia
About 20 percent of world gold production has been contributed by gold deposits in Archaean greenstone belts, of which ca 2100 tonnes of gold has been produced from Archaean greenstone belts in Wester
Jan 1, 1984
-
Alternative Lixiviant for Copper Leaching from Chalcopyrite Concentrate
By Junmo Ahn
This study investigated leaching kinetics by alternative lixiviants for copper leaching from chalcopyrite (CuFeS2), the most abundant copper resource in the world. As a refractory sulfide mineral, cha
-
Alternative Methodology for Selecting and Formulating Collectors for Coarse Fractions Using Metallurgical and Statistical Analysis - SME Annual Meeting 2025
By Cristian Saavedra, Patricio Zarate
Flotation collectors play a crucial role in mineral flotation by selectively adhering to mineral surfaces and aiding in their separation from gangue material. They are heteropolar molecules, as define
Feb 1, 2025
-
Alternative Methods For In Situ Determination Of Iron Oxide In Steelmaking Slags
By K. Schwerdtfeger
Data are presented on the effect of iron oxide on the electrical conductivity of CaO-SiO2-FeO-Fe2O3melts, and on limiting current and impedance in direct current or alternating current charge transfer
Jan 1, 2004
-
Alternative Models for the Calculation of CAPEX and OPEX for a Hydrometallurgical Plant
By Jürgen Antrekowitsch, Harald Osthof, Stefan Steinlechner
"In the case of feasibility assessments or feasibility studies, an important point of discussion is often how to calculate the capital (CAPEX) and operating expenditure (OPEX) of a plant. Generally, t
Jan 1, 2015
-
Alternative production processes for zircon products
By E. Snyders
Two alternative processes for the manufacturing of zircon products were investigated by the South African Nuclear Energy Corporation (Necsa). These were the synthesis of doped-zircon pigments from pl
Jan 1, 2005
-
Alternative Reductive Bleaching Process For Kaolin
By E. S. Forbus
A process for producing reductive bleach in-situ in kaolin slurries has been developed. The bleach is formed by mixing an iron sponge powder (-325M) with slurry treated with SO2. The process has been
Jan 1, 1993
-
Alternative Routes To Stainless Steel ? A Life Cycle Approach
A Life Cycle Assessment (LCA) of stainless steel production, including that of the nickel, ferronickel, ferrochromium and iron feedstocks was carried out using inventory data derived from the literatu
Jan 1, 2004
-
Alternative Strategies for Producing 65% Cu Matte
By W. G. Davenport
Chapters 7,8and 9 calculated three combinations of: blast composition (mass% O2, mass% N2) oil quantity per tonne of concentrate blast temperature that will steadily produce molten 65% Cu matt
Jan 1, 2001
-
Alternative Support Systems For Mechanized Stopes
By A. J. Jager, D. P. Roberts
The stoping of platinum orebodies in the Bushveld has in the past been accomplished by using in-stope pillars to ensure stability of the workings. In the future, the use of continuous mining machines
Jan 1, 2004
-
Alternative Support Systems For Mechanized Stopes
By D. P. Roberts
The stoping of platinum orebodies in the Bushveld has in the past been accomplished by using in-stope pillars to ensure stability of the workings. In the future, the use of continuous mining machines
Jan 1, 2005
-
Alternative Tailings Disposal Methods
By Marco Túlio Santiago Ferreira, Nilton Carlos Torquato, Washington Pirete da Silva
In 2005, with the significant reduction of iron content in the “Quadrilátero Ferrífero” reserves, Vale began the study of alternatives for the tailings disposal in other structures, that are not taili
Oct 3, 2019