Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Preventing Roof Fall Fatalities during Pillar Recovery: A Ground Control Success Story
By Michael Gauna, Christopher Mark
"For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines. Studies showed that a miner on a pillar recovery section was at least three times more like
Jan 1, 2016
-
Some Thoughts on Calibrating LaModel
By Keith Heasley
In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa
Jan 1, 2008
-
Roadway Strata Management in the New South Wales Underground Coal Mining Industry
By Rob Thomas
Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp
Jan 1, 2007
-
Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data
By Vincent Scovazzo
This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr
Jan 1, 2008
-
Headgate Rehabilitation through Roof Fall Reconsolidation at Broadmeadow Mine
By Robert J. Coutts, Dan A. Payne
"The Broadmeadow mine is a punch longwall mine owned and operated by BHP Billiton Mitsubishi Alliance (BMA) in the Bowen Basin of Queensland, Australia. In 1999, an exploratory adit was driven as part
Jan 1, 2010
-
How Interface Friction and W/H Ratio Affect the Mode of Failure of Coal Specimens
By Syd Peng, Gamal Rashed
"Bumps in coal mines have been recognized as a major hazard for many years. These sudden violent failures around mine openings have compromised safety, ventilation and access to mine workings. Previou
Jan 1, 2015
-
Multiple-Seam Inter-Burden Stress Distribution Using Strip-Pillar Mining Method
By Jin He
Based on the simple-beam theory, a stress analysis model was established for undermining in multiple seam strip-pillar mining when the strip pillars were not columnized; the effects of various mining
Jan 1, 2006
-
The Origin and History of U.S. Mine Resin
By Carl Tom Blevins
Resin was first introduced to U. S. mines in 1971 and first produced in 1973. The original polyester roof bolt resin was very expensive and limited to a single cartridge size and a single slow gel ti
Jan 1, 2006
-
Development of CAN Manipulator
By Brian E. Perrine
Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting
Jan 1, 2013
-
Yield Pillar Applications--Impact On Strata Control And Coal Production
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Numerical Model Calibration for Simulating Coal Pillars, Gob and Overburden Response
By Essie Esterhuizen, Michael M. Murphy, Chris Mark
"The design of underground coal mines requires a clear understanding of the overburden response, the loading of pillars, the loading of the gob, the pillar failure process, and the ultimate load carri
Jan 1, 2010
-
Sublevel Caving Mining Method for Extra-Thick Coal Seams
By H. Nan
Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full
Jan 1, 2006
-
Whole-Mine Subsidence over Tabular Deposits and Related Seismicity
By William G. Pariseau, Michael K. McCarter
"The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc
Jan 1, 2016
-
Fundamental Principles of an Effective Reinforcing Roof Bolting Strategy in Horizontally Layered Roof Strata and Areas of Potential Improvement
By Martin McKinnon, Guy Reed, Russell Frith
"It is arguable that the development of reinforcing roof bolting systems has largely stagnated in recent times, primarily due to the prevailing industry view that few, if any, further improvements can
Jan 1, 2017
-
Letter Of Nomination
By Dr. Daniel W. H. Su
t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving
Jan 1, 2006
-
Horizontal Stresses and Their Impact on Roof Stability at the Nelms No. 2 Mine
By J. B. Lizak
This paper is not available for inclusion in the Proceedings at the time of printing, but it will be included as an insert.
Jan 1, 1984
-
Field Measurements of Overburden and Chain Pillar Response to Longwall Mining
By Daniel W. H. Su
Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main
Jan 1, 1987
-
Stability Mapping as a Tool for Production Planning at Bowie No. 3 Mine
By Collin Stewart
Bowie Resources, LLC (Bowie) has been using the Stability Mapping System (SMS) developed by Dr. Keith Heasley, West Virginia University, since 2005. Seven three-entry longwall gateroads, four longwall
Jan 1, 2007
-
Strength and Deformation Characteristics of Coal under Cyclic Loading
By Yongjie Yang
Experimental study on the strength and deformation characteristics of coal under cyclic loading provides guidance for designing coal pillar which is subjected to repeated mining influence during minin
Jan 1, 2006
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden
By Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016